HousePrecheckCheck an address

125 George StToronto · zoning, lot size and permit records

Also 123 George St, 125 George St, 231 Richmond St E, 231 Richmond St E, 235 Richmond St E and 1 more

Commercial residential · CR SS1 (x405)30.6 × 61.6 m1,811 m²on George Stcorner, also on Richmond St E

Not a home

A commercial or mixed-use building

5 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 167726 STE 13 CD (Draft Plan of Condominium for 39-storey mixed-use development with four levels of under..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 16 development applications open within 300 m, up to 65 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: CorktownThe City plans more homes around the station: good for transit, and more building over time.
N20 m
30.6 m frontage61.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 building permits open, the oldest since 2023

    Needs a closer look

    Still open in the City's records: 22 183286 (Facade retention of heritage building related to permit 22-155297 DEM - future developm..., 2023, status Inspection); 22 155297 (Proposed demolition of existing 4-storey building for future development, 2023, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 24 254031 PRS 00 IR (Property Standards, 2024).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 167726 STE 13 CD (Draft Plan of Condominium for 39-storey mixed-use development with four levels of under..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. B0043/26TEY (To obtain consent to create a new stratified easement/right-of-way, 2026); B0078/21TEY (To obtain consent to create a strata easement in favour of 109-117 George Street, 2021).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 16 development applications open within 300 m

    Good to know

    16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 65 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

27 records on file: more than at 100% of Toronto houses (median 0).

  • Consent (lot split)B0043/26TEYApproved

    To obtain consent to create a new stratified easement/right-of-way.

    Oct 14, 2026 · 125 GEORGE ST
  • Development application26 167726 STE 13 CDDraft Plan Approved

    Draft Plan of Condominium for 39-storey mixed-use development with four levels of underground parking, and containing 516 residential dwelling units.

    May 26, 2026 · 231 RICHMOND ST E · City file
  • Development application26 125013 STE 13 SAClosed

    Site Plan Administrative Amendment to 21 191888 STE 13 SA

    Mar 4, 2026 · 125 GEORGE ST
  • By-law investigation24 254031 PRS 00 IRClosed

    Property Standards

    Dec 27, 2024 · 125 GEORGE ST
  • Building permit22 153696Superseded

    Part Permit - Proposal to construct a new 39 storey mixed use building with 516 residential dwelling units, ground floor retail and 4 levels below grade parking. See also 21 191888 STE 13 SA.

    Oct 27, 2023 · 125 GEORGE ST
  • Building permit23 110546Approved

    Alternative Solution for providing 65 mm diameter standpipe hose connections within the exit stairs (and as required on the floor areas for additional coverage purposes) in lieu of traditional fire hose cabinets (containing 38 mm and 65 mm connections and 30 m of fire hose) for the proposed mixed-use building to be located at 121-125 George Street and 231 Richmond Street East in Toronto, Ontario. This correspondence has been prepared with respect to the fire and life safety requirements in Part 3 of the 2012 Ontario Building Code (OBC, O.Reg. 332/12 as amended to O.Reg. 451/22) as well as the Alternative Solution Proposal requirements in Division C, Article 2.1.1.1 of the OBC.

    Feb 6, 2023 · 125 GEORGE ST
  • Building permit22 183286Inspection

    Facade retention of heritage building related to permit 22-155297 DEM - future development 22-153696 NB

    Jan 3, 2023 · 125 GEORGE ST
  • Building permit22 155297Inspectiondemolition

    Proposed demolition of existing 4-storey building for future development.

    Jan 3, 2023 · 125 GEORGE ST
Show 19 older records
  • Building permit22 149970Closeddemolition

    Proposed demolition of existing one storey presentation centre in preparation for future condominium development

    Jul 25, 2022 · 231 RICHMOND ST E
  • Zoning review21 191888 PSPClosed
    Feb 25, 2022 · 231 RICHMOND ST E
  • Consent (lot split)B0078/21TEYApproved

    To obtain consent to create a strata easement in favour of 109-117 George Street.

    Sep 29, 2021 · 125 GEORGE ST
  • Development application21 191888 STE 13 SAClosed

    Proposal for a 39-storey mixed-use building . A total of 516 residential dwelling units are proposed.

    Jul 30, 2021 · 231 RICHMOND ST E · City file
  • Zoning review20 120382 POZClosed
    Apr 27, 2021 · 231 RICHMOND ST E
  • Development application20 120382 STE 13 OZClosed

    Official Plan and Zoning By-law amendment application to facilitate the development a 39-storey Mixed-use building, which will incorporate the façade of 125 George Street and the retention of the existing 3-storey office building at 109 George Street. The proposed development includes a 254 m2 POPS space along George Street, retail uses at grade, office uses on the 2nd through 4th floors, and a residential tower above, with 516 dwelling units.

    Feb 28, 2020 · 125 GEORGE ST · City file
  • Zoning review19 187223 LPRClosed
    Jul 11, 2019 · 231 RICHMOND ST E
  • Zoning review19 160467 LPRCancelled
    May 27, 2019 · 231 RICHMOND ST E
  • Zoning review19 115434 LPRClosed
    Feb 14, 2019 · 231 RICHMOND ST E
  • Zoning review15 109376 ZPRClosed
    Jan 28, 2015 · 125 GEORGE ST
  • Building permit08 177174Closed

    Interior alterations to BSMT offices. Single Tenant floor Note: Separate HVAC permit required.

    Jul 7, 2008 · 125 GEORGE ST
  • Building permit05 125118Closed

    Exterior alterations, stucco treatment at entrance, parking lines and fence

    Apr 21, 2005 · 231 RICHMOND ST E
  • Building permit05 109572Closed

    Interior alterations to existing Gas/Service Station to change the use to a Warehouse Goodwill drop off unit.

    Feb 25, 2005 · 231 RICHMOND ST E
  • Building permit03 118560Closed

    make interior alterations to ground floor exit lobby and 2nd floor exit lobby, also alter north and south elevations refer to previous permits 02-194072 & 02-196887

    Apr 11, 2003 · 125 GEORGE ST
  • Zoning review03 122055 ZSVClosed
    Apr 8, 2003 · 125 GEORGE ST
  • Zoning review03 122028 ZSVClosed
    Apr 8, 2003 · 125 GEORGE ST
  • Building permit02 196887Closed

    HVAC - New air conditioning unit.cost included in bp

    Mar 18, 2003 · 125 GEORGE ST
  • Building permit02 196873Closed

    STEAM FILMS INC. Demolish existing partitions, new partitions 2nd floor.

    Dec 19, 2002 · 125 GEORGE ST
  • Building permit02 194072Closed

    Make interior alterations to portion of basement level

    Dec 5, 2002 · 125 GEORGE ST

Check before you build

  • Site-specific exception 900.11.10(405)

    Needs a closer look

    23 site-specific rules apply to this lot. They can override the standard rules on this page. 4 parts are limited to an area drawn on a by-law diagram; check whether this lot is in it.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(405)Applies

These parts of the exception apply to this lot's address.

  1. Rule A · diagram area

    On the lands shown on Diagram 1 of By-law 103-2022 municipally known in the year 2021 as 109 to 125 George Street and 231 Richmond Street East, if the requirements of By-law 103-2022 are complied with, a building , structure , addition or enlargement may be erected and used in compliance with Regulations

  2. Rule B

    to (LL) below; (B) For the purpose of this exception, "Parcel A" is the parcel of land as shown on Diagram 4 of By-law 103-2022

  3. Rule C · diagram area

    For the purpose of this exception, "Parcel B" is the parcel of land as shown on Diagram 4 of By-law 103-2022

  4. Rule D · diagram area

    For the purpose of this exception, "Parcel B Building" is the building and structures existing on Parcel B on the date of enactment of By-law 103-2022, labelled as "Parcel B Building" on Diagram 2 of By-law 103-2022 and as illustrated with grey shading on Diagram 5 of By-law 103-2022

  5. Rule E

    Despite any Regulation to the contrary, the Parcel B Building is permitted subject to alterations and additions permitted in accordance with this exception

  6. Rule F · diagram area

    For the purpose of this exception, the lot comprises the lands outlined by heavy black lines as shown on Diagram 1 of By-law 103-2022

  7. Rule G

    Despite Regulation 40.10.20.40(1) dwelling units are permitted in a mixed-use building on Parcel A

  8. Rule H

    Despite Regulation 40.10.40.40 (1), the gross floor areas of the buildings and structures permitted on Parcel A and Parcel B are as follows: (i) for Parcel A: the permitted maximum gross floor area is 36,000 square metres, of which: (a) the permitted maximum gross floor area for residential uses is 30,500 square metres; (b) the permitted maximum gross floor area for non-residential uses is 5,500 square metres; (c) the required minimum gross floor area for non-residential uses is 2,000 square metres; and (ii) for Parcel B: the total permitted maximum gross floor area is 6,200 square metres for non-residential uses, which is comprised of the gross floor area of the Parcel B Building and an additional 680.0 square metres

  9. Rule I

    In addition to the provisions of Clause 40.5.40.40, the gross floor area of a building is reduced by the area of the building used for: (i) public parking ; (ii) atrium areas, amenity space ; and (iii) any area of the building occupied by non-structural architectural or ornamental features that are attached to and project from the main wall of a building

  10. Rule J

    Of the total number of dwelling units provided on Parcel A: (i) a minimum of 25 percent must be two-bedroom dwelling units or larger; and (ii) of the dwelling units referred to in Regulation (J)(i) above, a minimum of 10 percent must be three-bedroom dwelling units or larger

  11. Rule K

    Despite Regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum elevation of 85.22 metres, and the highest point of the building or structure

  12. Rule L

    Despite Regulation 40.10.40.10(1), the permitted maximum height of a building or structure , is the height measured in metres, specified by the numbers following the HT symbol as shown on Diagram 5 of By-law 103-2022

  13. Rule M

    Despite Clause 40.5.40.10, and Regulation (L) above, the following elements of a building or structure may project above the permitted maximum height limits as shown on Diagram 5 of By-law 103-2022 as follows: (i) structures used for outdoor amenity space , roof top terraces and patios, maintenance equipment, safety, wind protection purposes and structures , or elements associated with a green roof to a maximum of 4.0 metres; (ii) parapets and sky lights to a maximum of 4.0 metres; (iii) stairs, enclosed stairs and access ladders to a maximum of 2.5 metres; (iv) structures , elements and enclosures permitted by Regulation (O) below; and (v) despite (i) to (iv) above, within the area subject to a height of 136.0 metres as shown on Diagram 5, only the following projections are permitted above the permitted maximum height limit: (a) elevator overrun to a maximum of 1.0 metres, plus 0.5 metres for an associated parapet; (b) parapets to a maximum of 1.6 metres; (c) window washing equipment to a maximum of 6.0 metres; and (d) fans, chimneys, vents, stacks and flues to a maximum of 2.0 metres

  14. Rule N

    Despite Regulations 5.10.40.70(1), 40.10.40.80(1), 40.10.40.70(1) and Section 600.10, the required minimum building setbacks and the required minimum separation distances between main walls of buildings and structures above ground must be provided as shown on Diagram 5 of By law 103-2022

  15. Rule O

    Despite Regulation 5.10.40.70(1), Clauses 40.5.40.60 and 40.10.40.60, the following building elements and structures may project into the required minimum building setbacks and a required minimum main wall separation distance as follows: (i) railings, balustrades, planters, lighting, patios, bollards, trellises, guards, guardrails, retaining walls, wheelchair ramps, bicycle parking facilities, landscape features and art installations; (ii) balconies and privacy screens to a maximum of 1.8 metres; (iii) cornices, sills, eaves, exterior building cladding materials, exterior doors and windows and ornamental or architectural features to a maximum of 1.0 metre; (iv) awnings and canopies including supporting structures to a maximum of 3.5 metres; and (v) structures , elements and enclosures permitted by Regulation (M) above

  16. Rule P

    No portion of a building on Parcel A may be located less than: (i) 12.5 metres from the eastern limit of Parcel A above the Canadian Geodetic Datum elevation of 103.87 metres, with the exception of the permitted projections set out in Regulations (M) and (O) above; and (ii) 30.4 metres from the southern limit of Parcel A above the Canadian Geodetic Datum elevation of 103.87 metres

  17. Rule Q

    The portion of a building on Parcel A located above a height of 126.0 metres, as measured from the Canadian Geodetic Datum elevation of 85.22 metres, and subject to a height limit of 136.0 metres as shown on Diagram 5 attached to By-law 103-2022, may only be used for: (i) equipment used for the functional operation of the building , such as electrical, utility, mechanical and ventilation equipment; (ii) structures used for the functional operation of the building such as enclosed stairwells, roof access, maintenance equipment storage, elevator shafts, and water supply facilities; (iii) indoor amenity space up to a maximum of 250.0 square metres plus associated corridor areas; and (iv) structures that enclose, screen or cover the parts of a building listed in (i), (ii) and (iii) above

  18. Rule R

    Despite Regulation (L) above, no portion of a building or structure shall be located between a height of 14.5 metres and 18.65 metres, as measured above the Canadian Geodetic Datum elevation of 85.22 metres, within the area of Parcel B shown with hatching on Diagram 5 attached to By-law 103-2022 with the exception of permitted projections set out in Regulation (M)

  19. Rule S

    Despite Regulation 40.10.40.10(5), on Parcel A the required minimum height of the first storey , as measured between the floor of the first storey and the floor of the second storey is 4.5 metres

  20. Rule T

    Despite Regulation 40.10.40.10(7), the permitted maximum number of storeys in a building is the numerical value following the letters "ST" on Diagram 5 of By-law 103-2022

  21. Rule U

    Despite Clause 40.10.40.50, amenity space is only required on Parcel A in accordance with the following: (i) a minimum of 3.0 square metres per dwelling unit must be provided as indoor or outdoor amenity space ; and (ii) of which a minimum of 40.0 square metres must be provided as outdoor amenity space in a location adjoining or directly accessible to the indoor amenity space

  22. Rule V

    Despite Regulation 200.5.10.1(1) and Table 200.5.10.1, parking spaces must be provided and maintained in accordance with the following: (i) a minimum of 0.15 parking spaces for each dwelling unit must be provided on Parcel A; (ii) a minimum of 0.04 parking spaces for each dwelling unit for the use of residential visitors or public parking must be provided on Parcel A; and (iii) no parking spaces are required for non-residential uses on both Parcels A and B

  23. Rule W

    Despite Regulations 40.5.80.1(1), 200.5.1.10(10) and 200.10.1, the residential visitor parking spaces required in Regulation (V)(ii) above may be provided on a non-exclusive basis within a public parking use on Parcel A and such parking spaces may also be used by occupants and visitors of non-residential uses on Parcel B

  24. Rule X

    Despite Regulation 230.5.10.1(1), Table 230.5.10.1(1) and Clause 220.5.10.1 bicycle parking spaces and loading spaces are not required for non-residential uses on Parcel B

  25. Rule Y

    Despite Regulation 200.5.1.10(2), on Parcel A: (i) up to 15 parking spaces that are obstructed on one side may have a minimum width of 2.6 metres; and (ii) up to 5 parking spaces may have a minimum length of 5.3 metres

  26. Rule Z

    Despite Regulation 200.15.1, an accessible parking space on Parcel A must comply with the following: (i) an accessible parking space must have the following minimum dimensions: (a) Length of 5.6 metres; (b) Width of 3.4 metres; and (c) Vertical clearance of 2.1 metres; (ii) the entire length of an accessible parking space must be adjacent to a 1.5 metre wide accessible barrier free aisle or path; and (iii) accessible parking spaces must be located a minimum of 20.0 metres from a barrier free entrance to a building on Parcel A that leads to a passenger elevator which provides access to the first storey of the building

  27. Rule AA

    Despite Regulation 200.15.10(1), a minimum of four parking spaces of the required parking spaces on Parcel A must comply with the minimum dimensions for an accessible parking space ; (BB) Despite Clause 220.5.10.1, a minimum of 1 Type "C" loading space ; and minimum of 1 Type "G" loading space must be provided on Parcel A; (CC) Despite Regulation 40.10.90.40(1), vehicle access to a loading space on Parcel A may be from a major street ; (DD) Despite Regulation 40.10.100.10(1), vehicle access to Parcel A may be from a major street ; (EE) Despite Regulations 230.5.1.10(9)(A)(iii) and (B)(iii), required "long-term" bicycle parking spaces may be located below-ground; (FF) Despite Regulation 230.5.1.10(10), a "long-term" and "short-term" bicycle parking space may be located in a stacked bicycle parking space ; (GG) Despite Regulation 230.5.1.10(4), the width of a bicycle parking space must be a minimum of 0.4 metres; (HH) Despite 230.40.1.20(2), a "short term" bicycle parking spaces may be located outside the building , within the first storey of the building or within the first level of a below grade parking structure; (II) Despite Regulation 40.10.20.100(21), outdoor patios on Parcel B are subject to the following: (i) roof top outdoor patios must be combined with an office use and have a combined total area of not more than 220.0 square metres; and (ii) grade related outdoor patios must be combined with one of the uses set out in Regulation 40.10.20.100(21)(A) and/or an office use and have a combined total area of not more than 250.0 square metres; (JJ) Despite Regulation 40.10.40.1(1), dwelling units must be located above non-residential use portions of a mixed-use building on Parcel A; (KK) Regulation 40.10.40.1(2) with respect to the location of entrances and first floor elevation does not apply; and (LL) Regulation 40.10.40.10(5) with respect to the minimum height of a first storey does not apply with respect to Parcel B.

By-law 569-2013, Chapter 900

Lot facts

Area
1,811 m²
Frontage
30.6 m
Depth
61.6 m
Street
George St
Corner lot
Yes, also on Richmond St E61.6 m along it
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
90 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Corktown. The lot is inside the Corktown Major Transit Station Area approved by the Province (Site and Area Specific Policy 764). Source
  • King-Parliament Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR SS1 (x405) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%14 of 14 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
29

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To legalize and to maintain the interior ground floor staircase, leading to the mezzanine, which was constructed without an authorized building permit. It should be noted that access to the mezzanine was only from the exterior of the building.

    53 ONTARIO ST · Sep 23, 2026 · 393 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.

    244 QUEEN ST E · Mar 11, 2026 · 322 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 287 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 429 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 438 m away

Latest activity nearby

  • Building permit

    1 wall sign**PHARMASAVE**

    213 A QUEEN ST E · Nov 23, 2026 · 167 m away
  • Building permit

    Interior alterations to units 101 & 102 for building 204 King St E.

    214 KING ST E · Nov 19, 2026 · 228 m away
  • Building permitdemolition

    Full building demolition front retention and backfill to grade

    234 KING ST E · Nov 19, 2026 · 284 m away
  • Building permit

    1 wall sign**PHARMASAVE**

    215 QUEEN ST E · Nov 12, 2026 · 178 m away
  • Zoning review

    Not Started

    100 LOMBARD ST · Nov 6, 2026 · 220 m away
  • Zoning review

    Cancelled

    201 FREDERICK ST · Nov 3, 2026 · 176 m away
  • Building permit

    Demolition and reconstruction of staircase, podium slab, and wall with waterproofing repairs

    200 KING ST E · Oct 27, 2026 · 192 m away
  • Building permit

    1 wall sign**PHARMASAVE**

    215 QUEEN ST E · Oct 26, 2026 · 178 m away
  • Building permit

    INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT

    111 QUEEN ST E · Oct 26, 2026 · 288 m away
  • Consent (lot split)Approved

    To obtain consent to create a new stratified easement/right-of-way.

    125 GEORGE ST · Oct 14, 2026 · 23 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station11 min walk
Nearest TTC stop
Sherbourne St at Richmond St East South Side3 min walk
Nearest cycling route
Richmond St ECycle Track, 1 min walk
Nearest traffic count
8,880 vehicles in 8 hRichmond St E / George St, 50 m away, Aug 13, 2013
Serious collisions within 500 m
102021–2026, killed or seriously injured: 0 fatal, 5 with pedestrians, 2 with cyclists
Parks
Moss Park3 min walk
St. James Park3 min walk
Market Lane Park5 min walk

Schools within 1 km

  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 3 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 7 min walk
  • KEYSTONE INTERNATIONAL SCHOOLS Private 8 min walk
  • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 9 min walk
  • DOWNTOWN ALTERNATIVE SCHOOL English Public 9 min walk
  • VICTORIA STREET LINC English Public 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.