Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register4 open orders or by-law investigations
Needs a closer lookNot resolved in the City's records: 26 136569 PRS 00 IV (Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged..., 2026, status Order Issued); 26 136499 PRS 00 IV (Order Issued Property Standards: Exterior window(s) with broken/cracked glass.; Exterio..., 2026, status Order Issued); 26 119828 PRS 00 IR (Property Standards, 2026, status Order Issued); and 1 more.
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations13 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Order Issued Property Standards, Property Standards, Zoning): 26 265653 PRS 00 IV (Order Issued Property Standards: The heating system or unit is not in good repair and m..., 2026); 26 265639 PRS 00 IR (Property Standards, 2026); 26 264687 HEA 00 IR (Adequate Heat, 2026); and 10 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations20 development applications open within 300 m
Good to know20 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 86 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 15 units, built 1918).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
21 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 265653 PRS 00 IVClosed
Order Issued Property Standards: The heating system or unit is not in good repair and maintained in good working condition.Namely boiler
Nov 5, 2026 · 125 EARL PL - By-law investigation26 265639 PRS 00 IRClosed
Property Standards
Nov 5, 2026 · 125 EARL PL - By-law investigation26 264687 HEA 00 IRClosed
Adequate Heat
Nov 3, 2026 · 125 EARL PL - By-law investigation26 264425 HEA 00 IRClosed
Adequate Heat
Nov 3, 2026 · 125 EARL PL - By-law investigation26 252927 HEA 00 IRClosed
Adequate Heat
Oct 10, 2026 · 125 EARL PL - By-law investigation26 252924 HEA 00 IRClosed
Adequate Heat
Oct 10, 2026 · 125 EARL PL - By-law investigation26 236035 PRS 00 IRClosed
Property Standards
Sep 11, 2026 · 125 EARL PL - By-law investigation26 136600 PRS 00 IRClosed
Property Standards
Mar 30, 2026 · 125 EARL PL
Show 13 older records
- By-law investigation26 136537 PRS 00 IRClosed
Property Standards
Mar 30, 2026 · 125 EARL PL - By-law investigation26 136410 PRS 00 IRClosed
Property Standards
Mar 30, 2026 · 125 EARL PL - By-law investigation26 126239 GRA 00 IRClosed
Graffiti
Mar 7, 2026 · 125 EARL PL - By-law investigation26 136569 PRS 00 IVOrder Issued
Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged and deteriorated materials, specifically cracked and pitted areas of concrete.; Ceiling not maintained free of holes, cracks, damaged and deteriorated materials, specifically cracked paint and plaster.; Ceiling not maintained free of holes, cracks, damaged and deteriorated materials, specifically deteriorated and pitted concrete and plaster.; Guard is less than 1,070 millimetres high, specifically 3rd floor landing guard.; The electrical connections namely electrical junction boxes are not maintained in a safe and complete condition specially missing covers.; The electrical connections, specifically junction boxes are not maintained in a safe and complete condition namely missing junction box covers.; The electrical fixtures are not maintained in a safe and complete condition, specifically missing light shade.; The electrical fixtures are not maintained in good working order, specifically overhead florescent lighting fixtures are loose and insecure (hung by metal wirin; The plumbing system is not kept free from leaks or defects specifically overhead pipe outside unit 203 is leaking.; Wall not maintained free of holes, cracks, damaged and deteriorated materials immediately outside unit 222.; Wall not maintained free of holes, cracks, damaged and deteriorated materials, specifically damaged plaster adjacent to units 232 and 234.
Feb 23, 2026 · 125 EARL PL - By-law investigation26 136499 PRS 00 IVOrder Issued
Order Issued Property Standards: Exterior window(s) with broken/cracked glass.; Exterior window(s) with broken/cracked glass, specifically second storey, north facing.; The fence, around or on the property is not being maintained in good repair, specifically, fencing out of plumb & badly rusted.; The protective/decorative finish on the exterior surfaces is not being maintained in good repair, specifically deteriorated and flaking paint throughout surface; The protective/decorative finish on the exterior surfaces, specially fascia boards at roofline is not being maintained in good repair.; The protective/decorative finish on the exterior surfaces, specially wooden window frames and doors not being maintained in good repair.; The required guard is missing and fire escape not maintained in good repair.; The required guard is not installed securely or maintained in good repair.; The required guard is not installed securely or maintained in good repair, specifically, guard loose/insecure and can be moved by hand.; The stair or their supporting structural members are not maintained in a safe condition, specifically, stair is loose/insecure.; The (stairs, treads, risers, guards, handrails, and/or other appurtenant attachments) and/or their supporting structural members are not maintained in good repa
Feb 23, 2026 · 125 EARL PL - By-law investigation26 119831 ZON 00 IRClosed
Zoning
Feb 23, 2026 · 125 EARL PL - By-law investigation26 119830 PRS 00 IRClosed
Property Standards
Feb 23, 2026 · 125 EARL PL - By-law investigation26 119829 PRS 00 IRClosed
Property Standards
Feb 23, 2026 · 125 EARL PL - By-law investigation26 119828 PRS 00 IROrder Issued
Property Standards
Feb 23, 2026 · 125 EARL PL - By-law investigation26 119827 PRS 00 IROrder Issued
Property Standards
Feb 23, 2026 · 125 EARL PL - By-law investigation26 119826 FEN 00 IRClosed
Fence
Feb 23, 2026 · 125 EARL PL - By-law investigation26 119825 WST 00 IRClosed
Waste
Feb 23, 2026 · 125 EARL PL - Building permit99 107681Closed
Fire alarm and emergency lighting retrofit
Nov 16, 1999 · 125 EARL PL
Check before you build
Site-specific exception 900.2.10(504)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The lands must comply with exception 900.2.10(4).
- Older by-law A
Section 12(1) 434 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 390 m²
- Frontage
- 26.6 m
- Depth
- 14.7 m
- Street
- Earl Pl
- Corner lot
- No
- Public lane
- None
- House footprint
- 315 m²roof up to 16.2 m
- Back yard
- 1.2 mhouse to rear lot line
- Side yards
- 0.6 m and 0.9 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 18 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone R (d2.0) (x504) (Residential). Chapter 10, section 10.10 of the by-law. Source
- 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: tree of heaven (55 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 91%10 of 11 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 6
- Development applications
- 29
Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.
50 EARL ST · Sep 15, 2021 · 227 m away - Minor varianceApproved
To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.
92 ISABELLA ST · Jun 30, 2021 · 229 m away - Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.
50 EARL ST · Dec 4, 2020 · 227 m away - Minor varianceApproved
To alter the existing three-storey mixed use building by converting a portion of the basement into a dwelling unit.
66 GLOUCESTER ST · Oct 8, 2020 · 334 m away - Minor varianceApproved
To legalize and maintain a three-storey residential apartment building with a reconstructed front porch and canopy.
2 GLEN RD · Dec 4, 2019 · 461 m away
Latest activity nearby
- Building permit
Revision 01 - fire alarm upgrade to P1, P2, P3, P4, P5 and first and second floorFire Alarm Upgrade: to add strobes in the required area to address accessibility requirement, the rest existing fire alarm to remain.
1 MOUNT PLEASANT RD · Nov 18, 2026 · 289 m away - Building permit
Proposal for installation of an art work on the front face of existing building. Weight 150kg
519 CHURCH ST · Sep 25, 2026 · 267 m away - Zoning review
Closed
10 HUNTLEY ST · Sep 3, 2026 · 71 m away - Zoning review
Closed
137 ISABELLA ST · Aug 24, 2026 · 177 m away - Building permit
Proposal to demolish the existing detached dwelling with 2 units.See 24 216579 STE 13 SA for future development
5 HUNTLEY ST · Aug 7, 2026 · 90 m away - Building permit
REV 01: Proposed 4th unit in basementProposal for interior alterations, including the replacement of the staircase from the ground floor to the basement and the addition or replacement of non-structural walls. There are no changes to any exterior doors or windows. New beams and columns are being added in the basement.
109 GLOUCESTER ST · Jul 24, 2026 · 122 m away - Building permit
Demolition of a townhouse. The residential structure will be replaced with a 69 storey tower with 4 levels of underground parking.
566 SHERBOURNE ST · Jun 29, 2026 · 300 m away - Building permit
Demolition of a townhouse. The residential structure will be replaced with a 69 storey tower with 4 levels of underground parking.
564 SHERBOURNE ST · Jun 29, 2026 · 296 m away - Zoning review
Closed
25 LOURDES LANE · Jun 19, 2026 · 185 m away - Building permit
Proposed temporary event structures for Green Space Festival 2026. The build date is on June 22, 2026 and the dismantle date is on June 29, 2026.
519 CHURCH ST · Jun 18, 2026 · 267 m away
Neighbourhood: North St.James Town
About the area around the lot, not the lot itself.
- Nearest station
- Sherbourne Station8 min walk
- Nearest TTC stop
- Wellesley St East at Jarvis St3 min walk
- Nearest cycling route
- Wellesley St ECycle Track, 3 min walk
- Nearest traffic count
- 8,530 vehicles in 8 hJarvis St / Earl Pl / Gloucester St, 60 m away, Dec 10, 2022
- Serious collisions within 500 m
- 102021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 3 with cyclists
- Parks
- Wellesley - Magill Park3 min walk
- Barbara Hall Park3 min walk
- Charles Street Parkette5 min walk
Schools within 1 km
- JARVIS COLLEGIATE INSTITUTE English Public 3 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 4 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 4 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 4 min walk
- OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
- NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 6 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | North St.James Town | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $59,200 | $84,500 |
| Households that own their home | 11% | 54% |
| Population (2021) | 18,535 | 16,813 |
| Homes built in 1960 or before | 19% | 29% |
| Homes needing major repairs | 10% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | North St.James Town | City median |
|---|---|---|
| Assault | 1281.6 | 636.3 |
| Robbery | 76.9 | 69.5 |
| Shootings | 4.3 | 10.5 |
| Auto theft | 85.4 | 192.6 |
| Theft over $5,000 | 38.4 | 46.1 |
| Break and enter | 153.8 | 172.8 |
| Theft from vehicles | 136.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.