Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
12 development applications open within 300 m
Good to know12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
14 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 137995Cancelled
Spatial Seperation application for building to Toronto Metropolitan University's Student Wellbeing Center 9 Refer to 137 Bond St - Permit # 23-195157 BLD 00 BA).
Apr 1, 2026 · 125 BOND ST - Development application22 242103 STE 13 OZClosed
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.
Dec 23, 2022 · 125 BOND ST · City file - Building permit18 190762Closed
Revision 01 - changes to accomodate new exterior double doors and a guard at the third floor levet to facilitate delviery of over sized equipmentProposal to construct interior alterations to existing ryerson university including renovation to accommodate new exterior double doors at the third floor level to facilitate the delivery ofover-sized equipment and the introduction of new exhaust duct work.
Nov 26, 2018 · 125 BOND ST - Building permit14 135484Closed
To install a backflow prevention device to the existing "Ryerson" University.
Apr 1, 2014 · 125 BOND ST - Building permit13 196276Closed
Proposal for interior alterations to office space on the ground floor (unit 102) of existing university building. - Ryerson University
Jul 12, 2013 · 125 BOND ST - Zoning review06 190586 ZSVClosedNov 10, 2006 · 125 BOND ST
- Zoning review06 181576 ZPRClosedOct 4, 2006 · 125 BOND ST
- Building permit02 119380Closed
supply and install sprinkler system on floors 1 thru 3 see bp#01-137583
Apr 3, 2002 · 125 BOND ST
Show 6 older records
- Building permit02 102797Closed
install san.and storm drain.and two 75mm.water services as per plans shown)All underground drain to sump pits)and all plmbg.piping to connect plmbg,Fixtures) cost included under file #01-137583----------'PLANS'
Jan 24, 2002 · 125 BOND ST - Building permit02 102785Closed
install fix. bsmt: 3 w.c., 4 w.b. 2 kit. sink,, 12 floor drains, 1 urinal; 1st fl: 1 kit. sink, 9 floor drains, 6 w.c., 5 w.b.; 2nd fl: 6 w.c., 5 w.b., 6 fl. drains, 1 kit. sink., 3rd fl: 6 roof drains;, 4 floor drains, 1 kit. sink, 5 w.c., 4 w.b------------cost included under file #01-137583
Jan 24, 2002 · 125 BOND ST - Building permit02 102789Closed
iinstall h.v.a.c. system------------cost included under file #01-137583
Jan 23, 2002 · 125 BOND ST - Building permit01 137583Closed
construct three storey building
Sep 25, 2001 · 125 BOND ST - Zoning review01 111722 000ClosedFeb 20, 2001 · 125 BOND ST
- Zoning review01 104464 000ClosedJan 19, 2001 · 125 BOND ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 773 m²
- Frontage
- 22.1 m
- Depth
- 36.1 m
- Street
- Bond St
- Corner lot
- No
- Public lane
- Ln S Gould E Bond, 43.2 m along it
- House footprint
- 728 m²roof up to 17.4 m
- Back yard
- 0 mhouse to rear lot line
- Side yards
- 0 m and 0.8 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: oak, red (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 94%15 of 16 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 29
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 265 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 409 m away - Minor varianceApproved
To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).
30 BOND ST · Jan 21, 2026 · 440 m away - Minor varianceApproved
To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).
97 GRANBY ST · Oct 15, 2025 · 409 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 371 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.
50 GERRARD ST E · Nov 25, 2026 · 270 m away - Zoning review
Closed
335 YONGE ST · Nov 23, 2026 · 203 m away - Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 242 m away - Zoning review
Closed
66 GERRARD ST E · Nov 9, 2026 · 268 m away - Zoning review
Not Started
21 DUNDAS SQ · Nov 6, 2026 · 220 m away - Building permit
Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.
332 YONGE ST · Nov 5, 2026 · 265 m away - Zoning review
Not Started
66 GERRARD ST E · Nov 4, 2026 · 268 m away - Zoning review
Closed
1 DUNDAS ST E · Oct 26, 2026 · 220 m away - Building permit
FS - Sprinkler Shop Drawing - Interior alterations - new office suite fit-out (tenant Improvements)
20 DUNDAS ST W · Oct 23, 2026 · 285 m away - Building permit
Proposal erect two temporary structures for Toronto Waterfront Marathon.Set up: 17 Oct. 2026; Tear down: 18 Oct. 2026
385 YONGE ST · Oct 15, 2026 · 294 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station4 min walk
- Nearest TTC stop
- Dundas St East at Church St3 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 4 min walk
- Nearest traffic count
- 2,267 vehicles in 8 hGould St / Bond St, 60 m away, Oct 9, 2003
- Serious collisions within 500 m
- 142021–2026, killed or seriously injured: 1 fatal, 10 with pedestrians, 4 with cyclists
- Parks
- Toronto Metropolitan University Square1 min walk
- Arena Gardens4 min walk
- Trinity Square6 min walk
Schools within 1 km
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 1 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 1 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 1 min walk
- TMU - HEASLIP HOUSE University 2 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 4 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.