HousePrecheckCheck an address

123 Sackville StToronto · zoning, lot size and permit records

Residential · R (d1.0) (x850)18.3 × 55.7 m929 m²on Sackville Stcorner, also on Sydenham St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 20 rental units, built 1985More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 5 development applications open within 300 m, up to 28 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 161968 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 81 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Moss ParkThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
18.3 m frontage55.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 161968 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 172149 000 00 IR (Adequate Heat, 2026); 26 172148 000 00 IR (Property Standards, 2026); 25 224166 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B0024/04TEY (This application also includes municipal addresses known as 125-133 Sackville Street an..., 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 28 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 81 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2024 (3 storeys, 20 units, built 1985).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 172149 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 123 SACKVILLE ST
  • By-law investigation26 172148 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 123 SACKVILLE ST
  • By-law investigation26 161968 PRS 00 IRRescheduled

    Property Standards

    May 16, 2026 · 123 SACKVILLE ST
  • By-law investigation25 224166 PRS 00 IRClosed

    Property Standards

    Sep 11, 2025 · 123 SACKVILLE ST
  • Building permit15 223094Closed

    Proposal to install (1) backflow prevention device.

    Sep 23, 2015 · 123 SACKVILLE ST
  • Consent (lot split)B0024/04TEYApproved

    This application also includes municipal addresses known as 125-133 Sackville Street and 101-117A Sackville Street. The applicant is seeking approval to mortgage Part 1, Part 2 and Part 3 (123 Sackville Street) separately from the balance of the applicant's holdings, as indicated on the Reference Plan 63R-3193. The subject site has a lot frontage of 15.2 metres and a lot depth of 55.5 metres.

    Jun 16, 2004 · 123 SACKVILLE ST

Check before you build

  • Site-specific exception 900.2.10(850)

    Needs a closer look

    1 site-specific rule and 11 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(850)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4).

  2. Older by-law A

    Section 12(5)(h) of former City of Toronto By-law 438-86

  3. Older by-law B

    Former City of Toronto by-law 531-78

  4. Older by-law C

    Former City of Toronto by-law 532-78

  5. Older by-law D

    Former City of Toronto by-law 533-78

  6. Older by-law E

    Former City of Toronto by-law 39-80

  7. Older by-law F

    Former City of Toronto by-law 696-81

  8. Older by-law G

    Former City of Toronto by-law 59-82

  9. Older by-law H

    Former City of Toronto by-law 546-83

  10. Older by-law I

    Former City of Toronto by-law 547-83

  11. Older by-law J

    Former City of Toronto by-law 49-90

  12. Older by-law L

    On 101 Sackville St., the even numbered addresses of 108-130 Sackville St., the odd numbered addresses of 123-125 Sackville St., 134 Sackville St., the even numbered addresses of 136-138 Sackville St., 140 Sackville St., 325 Shuter St., the odd numbered addresses of 335-341 Shuter St., the odd numbered addresses of 343-423 Shuter St., 427 Shuter St., the odd numbered addresses of 429-445 Shuter St., 447 Shuter St., the odd numbered addresses of 15-37 Syndenham St., the even numbered addresses of 2-40 Syndenham St., the odd numbered addresses of 29-31 Tracy St., the even numbered addresses of 12-40 Trefann St., and the odd numbered addresses of 5-15 Trefann St., former City of Toronto by-laws 284-72 and 204-79

2 parts for other addresses
  • K On 465 Dundas St. E., former City of Toronto by-law 97-0105
  • M On 427 Shuter St., 447 Shuter St., former City of Toronto by-law 94-0446.
By-law 569-2013, Chapter 900

Lot facts

Area
929 m²
Frontage
18.3 m
Depth
55.7 m
Street
Sackville St
Corner lot
Yes, also on Sydenham St55.7 m along it
Public lane
None
House footprint
236 m²roof up to 11.2 m
Back yard
35 mhouse to rear lot line
Side yards
1 m and 3.1 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x850) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
84%21 of 25 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
5
Development applications
11

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 25 variance decisions: more than at 57% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rooftop stair enclosure (vestibule and storage area) for Unit 701, within this existing seven-storey detached building. The existing private rooftop elevator enclosure will be demolished.

    90 SUMACH ST · Jan 8, 2025 · 101 m away
  • Minor varianceRefused

    To alter the existing seven-storey apartment building by constructing a new third storey rooftop deck (for Unit 319), to be located on the roof above the existing parking garage, on the north side of the building. There will be a partition fence on the rooftop deck.

    90 SUMACH ST · Aug 14, 2024 · 101 m away
  • Minor varianceApproved

    To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.

    29 SACKVILLE ST · Aug 14, 2024 · 351 m away
  • Minor varianceApproved

    To alter the existing two-storey rowhouse by reconstructing new rear decks on the first and second storeys. The second storey deck will be constructed with a canopy.

    1 ASHBY PL · Dec 6, 2023 · 296 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear third storey terrace.

    387 SHUTER ST · Aug 24, 2022 · 108 m away

Latest activity nearby

  • Building permit

    Proposal to add new washrooms on ground floor and second floor, finish basement, and interior alteration to add load bearing beams in basement and on ground floor.

    13 BRIGHT ST · Nov 24, 2026 · 228 m away
  • Zoning review

    Not Started

    480 SHUTER ST · Nov 19, 2026 · 216 m away
  • Building permit

    PROPOSED ALTERATIONS TO SECOND FLOOR

    491 QUEEN ST E · Nov 17, 2026 · 236 m away
  • Building permit

    Proposal to install new smoke alarms and monitoring modules to provide individual suite nnunciation on the fire alarm system.

    146 SUMACH ST · Oct 30, 2026 · 201 m away
  • Zoning review

    Under Review

    20 REGENT ST · Oct 27, 2026 · 256 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 23, 2026 · 234 m away
  • Zoning review

    Notice Sent

    534 QUEEN ST E · Oct 13, 2026 · 263 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 7, 2026 · 234 m away
  • Building permit

    REVISION - revised drawingsProposed commercial kitchen ventilation system.

    368 QUEEN ST E · Oct 5, 2026 · 253 m away
  • Building permit

    Renovation to the ground floor of an existing apartment building "Brother Joseph Dooley Apartments" to facilitate the installation of a barrier free entrance and vestibule from Sydenham Street. The existing entrance from Tracy street will be enclosed and the interior configuration of the ground floor which includes 3 residential suites and offices will be reconfigured.

    412 QUEEN ST E · Sep 9, 2026 · 153 m away

Neighbourhood: Regent Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station25 min walk
Nearest TTC stop
Queen St East at Sackville St2 min walk
Nearest cycling route
Shuter StCycle Track, 1 min walk
Nearest traffic count
4,244 vehicles in 8 hSackville St / Shuter St, 80 m away, Mar 29, 2022
Serious collisions within 500 m
62021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 2 with cyclists
Parks
Bright Street Playground2 min walk
Louis March Park3 min walk
Regent Park Athletic Grounds3 min walk

Schools within 1 km

  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 2 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • LIBERTY PREP SCHOOL Private 6 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 6 min walk
  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 10 min walk
  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRegent ParkMedian neighbourhood
Median household income (2020)$65,500$84,500
Households that own their home30%54%
Population (2021)12,75016,813
Homes built in 1960 or before13%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRegent ParkCity median
Assault947.8636.3
Robbery83.569.5
Shootings610.5
Auto theft95.4192.6
Theft over $5,00011.946.1
Break and enter166.9172.8
Theft from vehicles125.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.