Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 Committee of Adjustment file on this lot
Good to know1 approved. A0912/08TEY (To construct additions on the north, east and west sides of Ryerson University's School..., 2008).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)16 development applications open within 300 m
Good to know16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
30 records on file: more than at 100% of Toronto houses (median 0).
- Development application22 242103 STE 13 OZClosed
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.
Dec 23, 2022 · 122 BOND ST · City file - Building permit19 130656Closed
Installation of a temporary tent - Networking Lounge for the contact photography Festival. INSTALLATION OF A CERTIFIED TEMPORARY TENT (14 241368 ) 30'X75' ON 4/30/2019. OCCUPIED ON 5/1/2019 AND REMOVED ON 5/2/2019. TENT WILL BE INSTALLED WITH REMOVABLE SIDEWALLS AND ANCHORED WITH CONCRETE BALLASTS. NO COOKING WITHIN THE TENT. TENT WILL NOT BE ERECTED WITHIN 3M OF ANY BUILDING.
Mar 28, 2019 · 122 BOND ST - Building permit18 175460Closed
Revision#01 - Revision of concrete block to structural steel studs below new raised composite floor deck.Proposed renovation of existing photography dark rooms on ground floor into a new image Arts Classroom/Studio space and creation of one large darkroom. Within an existing university building.
Feb 8, 2019 · 122 BOND ST - Building permit18 216716Closed
Sprinklers in connection to 18 175460 BLD
Sep 26, 2018 · 122 BOND ST - Building permit18 124572Closed
Instaulation of a temporary tent - Hospitality and Networking Space Scotiabak Contact FestivalINSTALL 40'X60' TEMPORARY TENT ON 4.25.2018. TENT WILL BE OCCUPIED ON 4.27.2018. TENT WILL BE REMOVED ON 4.28.2018. TENT WILL BE INSTALLED ANCHORED BY WEIGHTS AND WITH REMOVABLE SIDEWALLS. TENT WILL NOT BE ERECTED WITHIN 3M OF ANY EXISTING STRUCTURE. TENT WILL NOT BE ERECTED WITHIN 6M OF ANY SIDEWALK OR ROADWAY. THERE WILL BE NO COOKING UNDER THE TENT. CERTIFIED TENT: 14 241369
Mar 7, 2018 · 33 GOULD ST - Building permit17 141433Closed
INSTALL 40'X75' TEMPORARY TENT ON 4.26.2017. TENT WILL BE OCCUPIED ON 4.28.2017. TENT WILL BE REMOVED ON 4.29.2017. TENT WILL BE INSTALLED ANCHORED BY WEIGHTS AND WITH REMOVABLE SIDEWALLS. TENT WILL NOT BE ERECTED WITHIN 3M OF ANY EXISTING STRUCTURE. TENT WILL NOT BE ERECTED WITHIN 6M OF ANY SIDEWALK OR ROADWAY. THERE WILL BE NO COOKING UNDER THE TENT
Apr 12, 2017 · 33 GOULD ST - Building permit15 157077Closed
Proposal for interior alterations to the ground floor of existing university - "Ryerson Image Centre". Scope of work includes a new rooftop mechanical unit and mechanical work on the basement, ground, 2nd, and 3rd floors.
Jun 15, 2015 · 33 GOULD ST - Building permit14 254426Closed
Proposal for interior alterations to Room No IMA307 on the 3rd floor of existing university - Ryerson Image Arts Building
Nov 24, 2014 · 122 BOND ST
Show 22 older records
- Building permit11 320105Closed
Proposal for interior alterations to ground floor unit for new restaurant, greater than 30 seats - Balzacs Coffee Roasters. Located within the new Ryerson University building.
Dec 6, 2011 · 122 BOND ST - Building permit09 117580Closed
REVISED: roof layouts ( architectural drawings A104, A105 & A 106) also revised structural information for the 3rd floor and roof------------------------------------------------------------------------------------------------ -The revision includes a new layout for the sprinklers. The entire area will now have sprinklers. Permit for additions, and interior alteration to existing Ryerson University building - School of Image Arts. Recladding and Reroofing building new canopy, sprinklers.
Oct 6, 2011 · 122 BOND ST - Building permit11 282387Closed
new addressable fire alarm control panel
Oct 3, 2011 · 122 BOND ST - Building permit10 137791Closed
permit for 6 maglocks for existing newly renovated university building. - floor 2
Apr 6, 2010 · 122 BOND ST - Building permit09 150036Closed
Proposal for demolition in conjunction with building permit folder no. 09 117 580 BLD.
Jun 18, 2009 · 122 BOND ST - Zoning review09 139058 ZPRClosedMay 19, 2009 · 122 BOND ST
- Minor varianceA0912/08TEYApproved
To construct additions on the north, east and west sides of Ryerson University's School of Image Arts Building. Also, a portion of the existing south and west walls will be reclad.
Oct 22, 2008 · 122 BOND ST - Zoning review08 207826 PSPClosedSep 29, 2008 · 122 BOND ST
- Building permit08 204167Closed
Construct full size mock up of curtain wall to west elevation of School of Image Arts-Ryerson
Sep 22, 2008 · 122 BOND ST - Development application08 198509 STE 27 SAClosed
Addition of existing school (Ryerson) for student study space, faculty offices, public cafe, public gallery and research centre (1710m2), interior alterations to (2670m2), and recladding of 2020m2.
Aug 28, 2008 · 122 BOND ST - Building permit08 176863Closed
Interior alterations to computer lab/classrooms to Basement. Ryerson University
Jul 14, 2008 · 122 BOND ST - Building permit08 159530Closed
Permit to demolish exisitng link between 122 Bond and 285 Victoria Street on second and third floor and make good of space.
Jun 6, 2008 · 122 BOND ST - Zoning review08 116863 ZALCancelledMar 5, 2008 · 122 BOND ST
- Building permit07 270827Closed
Interior alterations to portion of 2nd floor to accommodate new students-photography studios.
Nov 13, 2007 · 122 BOND ST - Zoning review06 190594 ZSVClosedNov 10, 2006 · 122 BOND ST
- Zoning review06 181591 ZPRClosedOct 4, 2006 · 122 BOND ST
- Building permit04 164921Closed
Make interior alterations to portion of the 3rd floor.
Nov 9, 2004 · 122 BOND ST - Building permit03 152092Closed
Make interior alterations to portion of the 2nd floor.
Jul 10, 2003 · 122 BOND ST - Building permit02 159087Closed
Make interior alterations to portion of the basement. (School of Image Arts)
Aug 8, 2002 · 122 BOND ST - Building permit01 111213Closed
Install fixtures in basement: 2 w.c., 2 w.b. cost incl. 01 - 111211
Apr 23, 2001 · 122 BOND ST - Building permit01 111211Closed
Make interior alterations existing washroom in basement for barrier free washroom.
Feb 23, 2001 · 122 BOND ST - Building permit99 014832Closed
UPGRADE FIRE ALARM SYSTEM. (PHOTOGRAPHIC ARTS) FEE $ 200.00
May 18, 1999 · 122 BOND ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 2,931 m²
- Frontage
- 83 m
- Depth
- 36 m
- Street
- Bond St
- Corner lot
- No
- Public lane
- Ln S Gould W Bond, 54.4 m along it
- House footprint
- 2,909 m²
- Back yard
- 0 mhouse to rear lot line
- Side yards
- 0 m and 0 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 6house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 19 City trees in front of this lot. The City's street tree inventory lists 19 trees at this address: planetree, london (13 cm), elm (10 cm), planetree, london (10 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 94%16 of 17 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 35
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 206 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 468 m away - Minor varianceApproved
To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).
30 BOND ST · Jan 21, 2026 · 453 m away - Minor varianceApproved
To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).
97 GRANBY ST · Oct 15, 2025 · 412 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 419 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.
50 GERRARD ST E · Nov 25, 2026 · 260 m away - Zoning review
Closed
335 YONGE ST · Nov 23, 2026 · 145 m away - Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 286 m away - Zoning review
Closed
66 GERRARD ST E · Nov 9, 2026 · 266 m away - Zoning review
Not Started
21 DUNDAS SQ · Nov 6, 2026 · 201 m away - Building permit
Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.
1 DUNDAS ST W · Nov 5, 2026 · 266 m away - Building permit
Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.
332 YONGE ST · Nov 5, 2026 · 206 m away - Zoning review
Not Started
66 GERRARD ST E · Nov 4, 2026 · 266 m away - Zoning review
Closed
1 DUNDAS ST E · Oct 26, 2026 · 183 m away - Building permit
FS - Sprinkler Shop Drawing - Interior alterations - new office suite fit-out (tenant Improvements)
20 DUNDAS ST W · Oct 23, 2026 · 236 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station3 min walk
- Nearest TTC stop
- TMU Station - Northbound Platform3 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 4 min walk
- Nearest traffic count
- 2,267 vehicles in 8 hGould St / Bond St, 50 m away, Oct 9, 2003
- Serious collisions within 500 m
- 142021–2026, killed or seriously injured: 1 fatal, 10 with pedestrians, 4 with cyclists
- Parks
- Toronto Metropolitan University Square1 min walk
- Arena Gardens5 min walk
- Trinity Square5 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 1 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 1 min walk
- TMU - HEASLIP HOUSE University 1 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 2 min walk
- TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 4 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.