Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
4 building permits open, the oldest since 2003
Needs a closer lookStill open in the City's records: 11 182375 (Proposed installation of additional ductwork for existing manufacturing equipment on ro..., 2011, status Inspection); 11 119364 (Replace (10) existing stacks on roof of (1) storey industrial building *Bemis Flexible..., 2011, status Inspection); 03 130115 (Install new cyclone tank, 2003, status Inspection); and 1 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 25 117929 (Fire protection, 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
44 records on file: more than at 100% of Toronto houses (median 0).
- Building permit24 144986Closed
REV 01: Removal of ceiling & relocation of siamese connection.Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material.
Aug 21, 2025 · 122 ARROW RD - Building permit25 141465Approved
Proposal for an alternative solution to omit the standpipe system
Apr 8, 2025 · 122 ARROW RD - Building permit25 117929Permit Issued
Fire protection
Mar 18, 2025 · 122 ARROW RD - Building permit24 230689Cancelled
A TIMED EGRESS ANALYSIS HAS BEEN COMPLETED BASED ON THE SFPE HANDBOOK OF FIRE PROTECTION ENGINEERING, 5TH EDITION, CHAPTER 59, ¿EMPLOYING THE HYDRAULIC MODEL IN ASSESSING EMERGENCY MOVEMENT¿ TO COMPARE THE ALTERNATIVE SOLUTION TO A THEORETICAL ACCEPTABLE SOLUTION DEVELOPED TO REFLECT THE SAME AVAILABLE EXITS. THE ALTERNATIVE SOLUTION IS CONSIDERED TO BE SUCCESSFUL AS THE ACTUAL CALCULATED EGRESS TIME IS LESS THAN THAT OF THE THEORETICAL DESIGN THAT COMPLIES WITH OBC ACCEPTABLE SOLUTIONS.
Oct 24, 2024 · 122 ARROW RD - Development application24 186101 WET 07 SAClosed
The existing recycling 1-storey building at 122 Arrow Road building is proposed to increase its GFA by 4,108 square metres to accommodate the new equipment. The total GFA of 122 Arrow Road will be 16,129 square metres and the total GFA of the subject lands will increase by 11.24% to 40,658 square metres.
Jul 23, 2024 · 122 ARROW RD · City file - Building permit24 175734Approved
A TIMED EGRESS ANALYSIS HAS BEEN COMPLETED BASED ON THE SFPE HANDBOOK OF FIRE PROTECTION ENGINEERING, 5TH EDITION, CHAPTER 59, EMPLOYING THE HYDRAULIC MODEL IN ASSESSING EMERGENCY MOVEMENT , TO COMPARE THE ALTERNATIVE SOLUTION TO A THEORETICAL ACCEPTABLE SOLUTION DEVELOPED TO REFLECT THE SAME AVAILABLE EXITS. THE ALTERNATIVE SOLUTION IS CONSIDERED TO BE SUCCESSFUL AS THE ACTUAL CALCULATED EGRESS TIME IS LESS THAN THAT OF THE THEORETICAL DESIGN THAT COMPLIES WITH OBC ACCEPTABLE SOLUTIONS.
Jul 5, 2024 · 122 ARROW RD - Zoning review24 109877 ZAPClosedJan 30, 2024 · 122 ARROW RD
- Building permit22 177332Closed
Fire alarm system replacment and adding a couple of new fire alarm devices.
Aug 16, 2022 · 124 ARROW RD
Show 36 older records
- Building permit15 183433Closed
Proposal to install 1 temporary certified tent, 30' X 40' (#14-251051) in the parking lot of an existing industrial building from July 2, 2015 to July 3, 2015 - PAN AM - Canadian FibresConvenience address is 130 Arrow Road.
Jul 2, 2015 · 122 ARROW RD - Building permit12 138197Closed
Revision 01 - Additional docks and office modifications Proposal to construct new Recycling Facility Building to an existing recycling facility site. The facility will handle the processing of curbside recyclables for the City of Toronto.
Dec 22, 2014 · 122 ARROW RD - Building permit12 103120Closed
To erect and display one illuminated ground sign. Sign is static copy and in conjunction with an industrial company operating on the premises. **Canada Fibers Ltd.**
Feb 14, 2012 · 122 ARROW RD - Zoning review11 295845 PSPClosedOct 20, 2011 · 122 ARROW RD
- Development application11 295293 WET 07 SAClosed
Proposal to construct addition to an existing recycling facility. The facility will handle the processing of curbside recyclables for the City of Toronto.
Oct 19, 2011 · 122 ARROW RD - Building permit11 182375Inspection
Proposed installation of additional ductwork for existing manufacturing equipment on roof of (1) storey industrial building "Bemis Flexible Packaging" and provide structural support.
May 27, 2011 · 122 ARROW RD - Building permit11 119364Inspection
Replace (10) existing stacks on roof of (1) storey industrial building *Bemis Flexible Packaging* and provide structural supports.
Feb 10, 2011 · 122 ARROW RD - Building permit10 263187Closed - Dormant
Install one electromagnetic lock on door to roof stair on existing industrial building.
Oct 20, 2010 · 122 ARROW RD - Building permit05 194676Closed
Interior alterations to an existing industrial facility to create an ink storage room with explosion relief.
May 2, 2006 · 122 ARROW RD - Building permit04 169710Closed
Install 9 mag locks to exist. ind. bldg
Mar 4, 2005 · 122 ARROW RD - Building permit04 181430Closed
install a air gap as a back flow prevention
Nov 3, 2004 · 122 ARROW RD - Building permit04 139125Closed
install fire alarm to printing packaging plant
Jun 3, 2004 · 122 ARROW RD - Building permit03 190492Closed - Dormant
Installation of Sprinkler System in a new Maintenance Shop. Including Mezzanianne.
Jan 23, 2004 · 122 ARROW RD - Building permit03 185409Closed - Dormant
New lab and mezzanine with offices above.
Jan 8, 2004 · 122 ARROW RD - Building permit03 179582Closed - Dormant
Interior alterations for new press foundation and roof modifications.
Oct 23, 2003 · 122 ARROW RD - Building permit03 170699Closed - Dormant
Sept 15/03 - Zoning Approved - ljTo construct a storage platform
Sep 29, 2003 · 122 ARROW RD - Building permit03 130115Inspection
Install new cyclone tank
May 22, 2003 · 122 ARROW RD - Building permit03 117918Closed - Dormant
Install new hot oil shelter on roof.
May 1, 2003 · 122 ARROW RD - Building permit03 119956Inspection
Interior altertions and equipment foundation pad inside of existing plant.
Apr 17, 2003 · 122 ARROW RD - Building permit03 117911Cancelled
Install new hot oil shelter on top roof.
Mar 25, 2003 · 122 ARROW RD - Building permit03 104561Closed - Dormant
FIRE SPRINKLER UPGRADE FOR THE EXTENDED RAISE ROOF
Feb 17, 2003 · 122 ARROW RD - Building permit03 102539Closed - Dormant
FIRE SPRINKLER UPGRADE
Feb 3, 2003 · 122 ARROW RD - Building permit02 197050Closed - Dormant
PROPOSED EXTENSION OF RAISED ROOF SECTION TO ORIG. PERMIT NO.02-157040.
Jan 23, 2003 · 122 ARROW RD - Building permit03 101905Closed - Dormant
ADD SPRINKLERS UNDER MEZZANINE
Jan 17, 2003 · 122 ARROW RD - Building permit03 101152Closed - Dormant
SPRINKLER SYSTEM
Jan 17, 2003 · 122 ARROW RD - Building permit03 102353Cancelled
ENTERED IN ERROR
Jan 16, 2003 · 122 ARROW RD - Building permit02 187740Closed
4" SANITARY DRAIN ADDITION - INSTALL 1 FLOOR DRAIN AND 1 - 4" OVERFLOW IN EXISTING INDUSTRIAL BUILDING
Dec 6, 2002 · 122 ARROW RD - Building permit02 187734Closed - Dormant
CONSTRUCTION OF NEW PRESS FOUNDATION AND WALLS
Nov 27, 2002 · 122 ARROW RD - Building permit02 179525Closed - Dormant
CONSTRUCT A SUPPORT SYSTEM ON THE ROOF FOR DUCTS FOR INDUSTRIAL PRINTING PRESSES.
Oct 8, 2002 · 122 ARROW RD - Building permit02 157040Closed - Dormant
RAISING ROOF STRUCTURE IN PORTION OF BUILDING.
Sep 18, 2002 · 122 ARROW RD - Building permit02 157043Closed - Dormant
FOUNDATION SLAB FOR FUTURE EXTERIOR EQUIPMENT STORAGE.
Aug 12, 2002 · 122 ARROW RD - Building permit02 108120Closed - Dormant
CONSTRUCTION OF A NEW MEZZANINE WITH A NEW CHILLER ROOM ON THE GROUND FLOOR
Mar 25, 2002 · 122 ARROW RD - Building permit02 111795Closed - Dormant
CONSTRUCTION OF NEW PRESS FOUNDATION.
Mar 12, 2002 · 122 ARROW RD - Building permit02 111788Closed
CONSTRUCTION OF SHELTER ON ROOFTOP.
Feb 19, 2002 · 122 ARROW RD - Building permit01 205418Closed - Dormant
INTERIOR ALTERATIONS TO PORTION OF FOUNDATION SLAB.
Jan 17, 2002 · 122 ARROW RD - Building permit01 196786Closed - Dormant
TO BUILD EQUIPMENT FOUNDATION (38'-0"X52'-9") ON THE SIDE OF EXISTING BUILDING.
Dec 3, 2001 · 122 ARROW RD
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 111,243 m²
- Frontage
- 440.1 mestimated, irregular lot
- Depth
- 307.8 mestimated, irregular lot
- Street
- Arrow Rd
- Corner lot
- No
- Public lane
- None
- House footprint
- 12,501 m²
- Back yard
- 219.7 mhouse to rear lot line
- Side yards
- 24.1 m and 245.3 mhouse to side lot lines
- Buildings on the lot
- 4house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 18 City trees in front of this lot. The City's street tree inventory lists 18 trees at this address: elm, accolade (15 cm), maple, freeman autumn blaze (14 cm), elm, accolade (13 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To convert a portion of the existing building into a recreational use.
115 RIVALDA RD · Apr 17, 2025 · 269 m away - Minor varianceApproved
To permit a vehicle dealership. A previous Comittee of Adjustment application (A0034/17EYK) approved variances relating to the use and parking.
150 DEERHIDE CRES · Feb 9, 2023 · 439 m away - Minor varianceApproved
To permit the existing vehicle repair shop with a spray booth.
144-146 OAKDALE RD · Aug 29, 2019 · 424 m away - Minor varianceApproved
To permit a vehicle body repair shop with a spray booth.
144-146 OAKDALE RD · Aug 10, 2017 · 424 m away - Minor varianceApproved
To convert the existing building into a vehicle dealership.
150 DEERHIDE CRES · Feb 23, 2017 · 439 m away
Latest activity nearby
- Building permit
Proposal for removal of an existing abandoned underground storage tank and replacement of existing waste oil aboveground storage tank in a new area.
700 ARROW RD · Oct 5, 2026 · 262 m away - Zoning review
Notice Sent
106-120 ARROW RD · Apr 9, 2026 · 157 m away - Building permit
Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility.
700 ARROW RD · Jan 13, 2026 · 262 m away - Building permit
REV 01: Removal of ceiling & relocation of siamese connection.Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material.
122 ARROW RD · Aug 21, 2025 · 122 m away - Building permit
FS - Sprinkler Shop Drawing - The current CETI Rectification project involves modifications to the building systems to ensure that MTO programs can be executed to strict laboratory requirements and provide a functional and safe working environment. The rectifications mainly encompass mechanical HVAC and exhaust systems along with associated monitoring, control narrative and building automation systems adjustments. The alterations to the architectural systems are being proposed in accordance with the findings and the operational considerations provided by the MTO.
95 ARROW RD · Jul 11, 2025 · 255 m away - Minor varianceApproved
To convert a portion of the existing building into a recreational use.
115 RIVALDA RD · Apr 17, 2025 · 269 m away - Building permit
Proposal for an alternative solution to omit the standpipe system
122 ARROW RD · Apr 8, 2025 · 122 m away - Building permit
Fire protection
122 ARROW RD · Mar 18, 2025 · 122 m away - Zoning review
Cancelled
115 RIVALDA RD · Dec 9, 2024 · 269 m away - Building permit
A TIMED EGRESS ANALYSIS HAS BEEN COMPLETED BASED ON THE SFPE HANDBOOK OF FIRE PROTECTION ENGINEERING, 5TH EDITION, CHAPTER 59, ¿EMPLOYING THE HYDRAULIC MODEL IN ASSESSING EMERGENCY MOVEMENT¿ TO COMPARE THE ALTERNATIVE SOLUTION TO A THEORETICAL ACCEPTABLE SOLUTION DEVELOPED TO REFLECT THE SAME AVAILABLE EXITS. THE ALTERNATIVE SOLUTION IS CONSIDERED TO BE SUCCESSFUL AS THE ACTUAL CALCULATED EGRESS TIME IS LESS THAN THAT OF THE THEORETICAL DESIGN THAT COMPLIES WITH OBC ACCEPTABLE SOLUTIONS.
122 ARROW RD · Oct 24, 2024 · 122 m away
Neighbourhood: Humbermede
About the area around the lot, not the lot itself.
- Nearest station
- Signet Arrow Station18 min walk
- Nearest TTC stop
- Arrow Rd at Lido Rd South Side4 min walk
- Nearest cycling route
- Humber River Recreational TrlMulti-Use Trail, 14 min walk
- Nearest traffic count
- 14,439 vehicles in 14 hLido Rd / Arrow Rd, 230 m away, Oct 29, 2025
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Habitant Park9 min walk
- St. Lucie Park12 min walk
- Fennimore Park12 min walk
Schools within 1 km
- THE AMBASSADORS OF GOD ACADEMY Private 10 min walk
- THE AMBASSADORS OF GOD ACADEMY Private 10 min walk
- ST JUDE CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
- EMERY C.I. & EMERY EDVANCE ADULT LEARNING CENTRE English Public 14 min walk
- GULFSTREAM PUBLIC SCHOOL English Public 16 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Humbermede | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $77,500 | $84,500 |
| Households that own their home | 46% | 54% |
| Population (2021) | 16,955 | 16,813 |
| Homes built in 1960 or before | 22% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Humbermede | City median |
|---|---|---|
| Assault | 990.9 | 636.3 |
| Robbery | 71.5 | 69.5 |
| Shootings | 15.3 | 10.5 |
| Auto theft | 439.2 | 192.6 |
| Theft over $5,000 | 71.5 | 46.1 |
| Break and enter | 168.5 | 172.8 |
| Theft from vehicles | 112.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.