HousePrecheckCheck an address

1212 Bloor St WToronto · zoning, lot size and permit records

Also 616A Brock Ave

Commercial residential · CR 3.0 (c1.0; r2.0) SS2 (x1556)9.4 × 38.2 m360 m²on Bloor St Wcorner, also on Brock Avebacks onto Michelle Senayah Lane

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 16 rental units, built 1923More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 7 development applications open within 300 m, up to 37 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • City upkeep score: 79 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: DufferinThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
9.4 m frontage38.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Notice Issued Adequate Heat, Property Standards, Zoning): 26 190411 PRS 00 IR (Property Standards, 2026); 25 214983 ZON 00 IR (Zoning, 2025); 25 134305 PRS 00 IR (Property Standards, 2025); and 2 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 37 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 79 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (3 storeys, 16 units, built 1923).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 190411 PRS 00 IRClosed

    Property Standards

    Jun 24, 2026 · 1212 BLOOR ST W
  • By-law investigation26 176269 GRA 00 IVClosed

    Notice Issued Graffiti

    May 25, 2026 · 1212 BLOOR ST W
  • By-law investigation26 166532 GRA 00 IRClosed

    Graffiti

    May 25, 2026 · 1212 BLOOR ST W
  • By-law investigation25 214983 ZON 00 IRClosed

    Zoning

    Aug 22, 2025 · 1212 BLOOR ST W
  • By-law investigation25 134305 PRS 00 IRClosed

    Property Standards

    Mar 25, 2025 · 1212 BLOOR ST W
  • By-law investigation25 108115 HEA 00 IVClosed

    Notice Issued Adequate Heat: The heat supplied to the dwelling unit is below twenty-one (21) degrees Celsius.

    Jan 21, 2025 · 1212 BLOOR ST W
  • By-law investigation25 107070 HEA 00 IRClosed

    Adequate Heat

    Jan 21, 2025 · 1212 BLOOR ST W
  • By-law investigation24 127594 WST 00 IRRescheduled

    Waste

    Mar 19, 2024 · 1212 BLOOR ST W
Show 10 older records
  • Zoning review09 193367 LTOClosed
    Dec 2, 2009 · 1212 BLOOR ST W
  • Zoning review05 127489 LTOClosed
    Apr 28, 2005 · 1212 BLOOR ST W
  • Zoning review03 188965 LTOClosed
    Oct 27, 2003 · 1212 BLOOR ST W
  • Zoning review02 132057 LTOClosed
    May 2, 2002 · 1212 BLOOR ST W
  • Zoning review02 116516 ZPUClosed
    Mar 7, 2002 · 1212 BLOOR ST W
  • Zoning review02 101906 LTOClosed
    Jan 9, 2002 · 1212 BLOOR ST W
  • Building permit01 176867Closed

    install on 1st floor: 2 w.c., 1 urinal, 2 w.b., cost included in 01-157623.

    Dec 6, 2001 · 1212 BLOOR ST W
  • Building permit01 157635Closed

    install fixtures on 1st floor- 2 2-compt. k.s., 2 w.c., 2 w.b., 2 b.t. see bp# 01-157623

    Dec 6, 2001 · 1212 BLOOR ST W
  • Building permit01 157623Closed - Dormant

    make interior alterations to rear portion of 1st floor for 2 additional dwelling units, also alteration to portion of 2nd and 3rd floors dwelling units.

    Dec 6, 2001 · 1212 BLOOR ST W
  • Zoning review01 012769 LTOClosed
    Jun 8, 2001 · 1212 BLOOR ST W

Check before you build

  • Site-specific exception 900.11.10(1556)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1556)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270(a) of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 336 of former City of Toronto By-law 438-86

  3. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270(a) of former City of Toronto By-law 438-86

  4. Older by-law B

    Section 12(2) 336 of former City of Toronto By-law 438-86

2 parts for other addresses
  • C On the lands municipally known as 1312 Bloor St. W. in 1994, Section 12(1) 376 of former City of Toronto By-law 438-86.
  • C On the lands municipally known as 1312 Bloor St. W. in 1994, Section 12(1) 376 of former City of Toronto By-law 438-86.
By-law 569-2013, Chapter 900

Lot facts

Area
360 m²
Frontage
9.4 m
Depth
38.2 m
Street
Bloor St W
Corner lot
Yes, also on Brock Ave38.2 m along it
Public lane
Michelle Senayah Lane, 19.7 m along it
House footprint
262 m²roof up to 11.9 m
Back yard
5.6 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Dufferin. The lot is inside the Dufferin Major Transit Station Area approved by the Province (Site and Area Specific Policy 658). Source
  • Zone CR 3.0 (c1.0; r2.0) SS2 (x1556) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: linden, littleleaf (62 cm), linden, littleleaf (58 cm), elm (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%42 of 42 decisions
Garden suite permits
4
Laneway suite permits
7
Multiplex permits
13
Development applications
16

Within 300 m, last 10 years. 24 suite and multiplex permits: more than at 91% of Toronto houses (median 3). 42 variance decisions: more than at 77% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipally known as 1325 Bloor Street West and 17 Dora Avenue). The application is to also modify Schedule A, as cited under Site Specific Zoning By-law 589-2022, to exempt transportation uses from Section 37 obligations.

    1319 BLOOR ST W · May 7, 2025 · 487 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.

    1319 BLOOR ST W · Nov 27, 2024 · 487 m away
  • Minor varianceApproved

    To alter the development standards under Site Specific Zoning By-Law 700-2021 (OLT) for the approved mixed-use redevelopment, with respect to the above-grade building permits, as well as the construction of the development block, public street, and municipal services.

    1141 BLOOR ST W · Dec 13, 2023 · 200 m away
  • Minor varianceApproved

    To permit the existing parking deficiency and to permit a rear yard setback deficiency for the existing commercial building (Dufferin Mall).

    900 DUFFERIN ST · Feb 23, 2022 · 487 m away
  • Minor varianceApproved

    To permit the existing parking deficiency and to permit a north side yard setback deficiency for the existing commercial building (Dufferin Mall).

    900 DUFFERIN ST · Feb 23, 2022 · 487 m away

Latest activity nearby

  • Minor variancePending

    To alter the existing four-storey mixed-use building by constructing two mechanical penthouse enclosures (including rooftop access), and a partially covered rooftop terrace with a trellis (above the fourth storey). The ground level and second level will contain one commercial unit (art gallery and event space). The third level will contain a multi-functional commercial space for youth programming, as well as amenity space for building residents (including counselling rooms, a gym, a break room, and an open-concept collaboration space). There will be a total of eight residential dwelling units located on the fourth level for youth transitioning from the Ontario Child Protection Services foster care system.

    1286 BLOOR ST W · Nov 25, 2026 · 256 m away
  • Zoning review

    Application On Hold

    463 ST CLARENS AVE · Nov 23, 2026 · 221 m away
  • Building permit

    Proposal to construct an attached roof above an existing deck in rear yard.

    661 BROCK AVE · Nov 18, 2026 · 137 m away
  • Building permit

    Interior renovation for a noodle restaurant, including building plumbing and HVAC work

    90 CROATIA ST · Nov 12, 2026 · 168 m away
  • Building permit

    Interior alterations for a proposed new take out restaurant.

    980 DUFFERIN ST · Nov 4, 2026 · 286 m away
  • Zoning review

    Closed

    634 BROCK AVE · Nov 2, 2026 · 81 m away
  • Zoning review

    Not Started

    1280 BLOOR ST W · Oct 30, 2026 · 220 m away
  • Building permit

    Interior alterations to establish connection between two ground floor spaces.

    1226 BLOOR ST W · Oct 21, 2026 · 33 m away
  • Building permit

    Interior alterations to establish connection between two ground floor spaces.

    1230 BLOOR ST W · Oct 20, 2026 · 43 m away
  • Minor variancePending

    Postponed

    434 MARGUERETTA ST · Oct 9, 2026 · 295 m away

Neighbourhood: Junction-Wallace Emerson

About the area around the lot, not the lot itself.

Nearest station
Dufferin Station5 min walk
Nearest TTC stop
Bloor St West at Brock Ave1 min walk
Nearest cycling route
Bloor St WCycle Track, 1 min walk
Nearest traffic count
14,282 vehicles in 14 hBloor St W / Brock Ave (East), 30 m away, Jun 26, 2025
Serious collisions within 500 m
62021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 1 with cyclists
Parks
Susan Tibaldi Parkette1 min walk
Dufferin Grove Park8 min walk
Erwin Krickhahn Park9 min walk

Schools within 1 km

  • BLOOR C.I. & ALPHA II ALTERNATIVE English Public 3 min walk
  • PAULINE JR PUBLIC SCHOOL English Public 6 min walk
  • ST SEBASTIAN CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • ST ANTHONY CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • ST MARY CATHOLIC ACADEMY SECONDARY SCHOOL English Separate 9 min walk
  • BROCK JR PUBLIC SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureJunction-Wallace EmersonMedian neighbourhood
Median household income (2020)$84,000$84,500
Households that own their home50%54%
Population (2021)23,18016,813
Homes built in 1960 or before40%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleJunction-Wallace EmersonCity median
Assault720636.3
Robbery3669.5
Shootings3.610.5
Auto theft108192.6
Theft over $5,00032.446.1
Break and enter230.4172.8
Theft from vehicles201.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.