HousePrecheckCheck an address

121 Kennedy AveToronto · zoning, lot size and permit records

Also 119 Kennedy Ave

Commercial residential · CR 2.5 (c2.0; r2.0) SS2 (x1978)23.2 × 53.6 m1,216 m²on Kennedy Ave

Not a home

Humberside Montessori School

The City's school locations place Humberside Montessori School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • 1 development application open within 300 m, up to 8 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • Major Transit Station Area: RunnymedeThe City plans more homes around the station: good for transit, and more building over time.
N20 m
23.2 m frontage53.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (6% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 8 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review18 188499 ZPRClosed
    Jul 4, 2018 · 121 KENNEDY AVE
  • Building permit17 257298Closed

    Proposal to install a backflow prevention device

    Nov 3, 2017 · 121 KENNEDY AVE
  • Zoning review17 246588 ZZUClosed
    Oct 12, 2017 · 121 KENNEDY AVE
  • Building permit00 136283Closed

    Alter plans as approved by making further interior alterations to first floor for an additional door and to create a lunch room area. Omit structural reinforcement to the basement floor. Remove classroom #5 on the 2nd floor and create a waiting area. Reconfigure walls on the 3rd floor.

    Apr 12, 2001 · 121 KENNEDY AVE
  • Building permit00 149909Closed

    INSTALL FIXTURES ON 1ST FLOOR- 2 K.S., 4 W.C., 4 W.B.; 2ND FLOOR- 4 BAR SINKS, 6 W.C., 6 W.B.; 3RD FLOOR- 5 BAR SINKS, 4 W.C., 4 W.B. ISSUE WITH 00-136283

    Jun 26, 2000 · 121 KENNEDY AVE
  • Zoning review96 025633 LTOClosed
    Oct 30, 1996 · 121 KENNEDY AVE
  • Zoning review96 025115 LTOClosed
    Jun 12, 1996 · 121 KENNEDY AVE
  • Building permit92 022583Closed

    MAKE INTERIOR ALTERATIONS AT THE THIRD FLOOR LEVEL FOR NEW BARRIER FREE WASHROOM AND ALTER PUBLIC CORRIDOR SYSTEM. L.C.

    Oct 9, 1992 · 121 KENNEDY AVE
Show 4 older records
  • Building permit89 022060Closed

    MAKE ALTERATIONS AND BUILD SECOND & THIRD FLOOR ADDITION ON NORTH SIDE. /LM

    Oct 23, 1989 · 121 KENNEDY AVE
  • Zoning review88 030851 LTOClosed
    Dec 1, 1988 · 121 KENNEDY AVE
  • Zoning review87 029840 LTOClosed
    Jan 28, 1987 · 121 KENNEDY AVE
  • Zoning review81 030520 LTOClosed
    Jul 10, 1981 · 121 KENNEDY AVE

Check before you build

  • Site-specific exception 900.11.10(1978)

    Needs a closer look

    4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1978)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 257 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 294 of former City of Toronto By-law 438-86

  4. Rule G

    Section 12(1) 329 of former City of Toronto By-law 438-86.

  5. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 257 of former City of Toronto By-law 438-86

  6. Older by-law B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  7. Older by-law C

    Section 12(2) 294 of former City of Toronto By-law 438-86

  8. Older by-law G

    Section 12(1) 329 of former City of Toronto By-law 438-86.

6 parts for other addresses
  • D On 2140 Bloor St. W., former City of Toronto by-law 110-87
  • E On 2192 Bloor St. W., former City of Toronto by-law 153-78
  • F On 2383 Bloor St. W., Section 12(1) 452 of By-law 438-86
  • D On 2140 Bloor St. W., former City of Toronto by-law 110-87
  • E On 2192 Bloor St. W., former City of Toronto by-law 153-78
  • F On 2383 Bloor St. W., Section 12(1) 452 of By-law 438-86
By-law 569-2013, Chapter 900

Lot facts

Area
1,216 m²
Frontage
23.2 m
Depth
53.6 m
Street
Kennedy Ave
Corner lot
No
Public lane
None
House footprint
1,037 m²roof up to 16.7 m
Back yard
7.5 mhouse to rear lot line
Side yards
0 m and 0.4 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
14 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Runnymede. The lot is inside the Runnymede Major Transit Station Area approved by the Province (Site and Area Specific Policy 651). Source
  • Swansea Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 2.5 (c2.0; r2.0) SS2 (x1978) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: linden, littleleaf (9 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%48 of 52 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
5
Development applications
2

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 52 variance decisions: more than at 87% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing ground floor unit (Unit 203), within the existing two-storey commercial building, from a Retail use to an Eating Establishment (restaurant/take-out restaurant) use.

    2150 BLOOR ST W · Jun 5, 2024 · 173 m away
  • Minor varianceApproved

    To convert the existing westerly ground floor unit (Unit 200) within the existing two-storey commercial building from a retail use to a restaurant use.

    2150 BLOOR ST W · Apr 26, 2023 · 173 m away
  • Minor varianceApproved

    To maintain the existing two-storey building (containing a daycare use) on the conveyed lot (Parts 2, 3 and 4), as described in Consent Application B0035/21TEY.

    2271 BLOOR ST W · Jul 27, 2022 · 290 m away
  • Minor varianceApproved

    To maintain the existing two-storey mixed-use building (containing at-grade retail and second and third level residential uses) on the retained lot (Part 1), as described in Consent Application B0035/21TEY.

    2271 BLOOR ST W · Jul 27, 2022 · 290 m away
  • Minor varianceApproved

    Proposed two-storey rear addition to the existing two-storey commercial building.

    2257 BLOOR ST W · Jul 22, 2021 · 230 m away

Latest activity nearby

  • Building permit

    Proposal to demolish existing garden shed in rear yard and replace with larger wood frame shed, add new rear yard porch, and modify location of window opening at rear of main dwelling,

    82 BERESFORD AVE · Nov 24, 2026 · 254 m away
  • Zoning review

    Application On Hold

    2187 BLOOR ST W · Nov 17, 2026 · 29 m away
  • Building permit

    3 wall signs.***NO FRILLS***

    2187 BLOOR ST W · Nov 17, 2026 · 29 m away
  • Building permit

    Proposal for a third storey addition and interior alterations throughout the dwelling

    106 BERESFORD AVE · Nov 16, 2026 · 211 m away
  • Minor variancePending

    To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a front bay window, a ground floor rear addition and a front yard parking pad. The exsiting parking pad in the rear yard will be removed.

    106 BERESFORD AVE · Nov 4, 2026 · 211 m away
  • Building permit

    1 Wall Sign****Jeff De Bruges****

    2184 BLOOR ST W · Nov 2, 2026 · 99 m away
  • Building permit

    3 Wall Sign*****NO FRILLS*****

    2187 BLOOR ST W · Oct 28, 2026 · 29 m away
  • Building permitsecondary suite

    Propsed second storey additon within existing footprint, underpinning and interior alterations. proposed second dwelling unit. Proposed ancillary building w/ sanitary facilities.

    80 BERESFORD AVE · Oct 28, 2026 · 261 m away
  • Building permit

    1 Wall Sign****Jeff De Bruges****

    2184 BLOOR ST W · Oct 27, 2026 · 99 m away
  • Building permit

    Revision No.2: Proposal to add HVAC Attic floor area 9.29 sm, revise rear deck.Revision 01 - rebuild existing roof higherRear two storey addition, dormer addition, basement underpinning, interior alteraitons to the existing dwelling and a rear deck.

    305 KENNEDY AVE · Oct 13, 2026 · 297 m away

Neighbourhood: High Park-Swansea

About the area around the lot, not the lot itself.

Nearest station
Runnymede Station3 min walk
Nearest TTC stop
Bloor St West at Runnymede Rd2 min walk
Nearest cycling route
Bloor St WCycle Track, 1 min walk
Nearest traffic count
13,585 vehicles in 14 hBloor St W / Kennedy Ave (East), 60 m away, Jul 23, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Kennedy - Margdon Parkette2 min walk
Neil McLellan Park2 min walk
High Park6 min walk

Schools within 1 km

  • HUMBERSIDE MONTESSORI SCHOOL Private 1 min walk
  • ERUDITE ELEMENTARY SCHOOL Private 7 min walk
  • RUNNYMEDE JR & SR PUBLIC SCHOOL English Public 10 min walk
  • URSULA FRANKLIN ACADEMY English Public 11 min walk
  • THE STUDENT SCHOOL English Public 11 min walk
  • WESTERN TECHNICAL COMMERCIAL SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHigh Park-SwanseaMedian neighbourhood
Median household income (2020)$101,000$84,500
Households that own their home60%54%
Population (2021)22,66516,813
Homes built in 1960 or before54%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHigh Park-SwanseaCity median
Assault465.8636.3
Robbery46.669.5
Shootings7.810.5
Auto theft89.3192.6
Theft over $5,00023.346.1
Break and enter229172.8
Theft from vehicles128.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.