HousePrecheckCheck an address

121 Finch Ave EToronto · zoning, lot size and permit records

13.6 × 48.8 m662 m²on Finch Ave E

Not a home

Land without a building

A demolition permit (26 175071, 2026) is on file and no permit for a new building: the land is probably empty or used for parking. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 26 175071 (The existing 1 1/2 - storey house is to be removed for redevelopment of condominium (pa..., 2026); 26 246786 NNY 18 OZ (OPA & Rezoning Application proposes the development of a 13-storey mixed-use building p..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 13 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 25 218145 PRS 00 IV (Order Issued Property Standards: The roof or one of its component is not free from leak..., 2025, status Order Issued); 25 214913 PRS 00 IR (Property Standards, 2025, status Order Issued).
N20 m
13.6 m frontage48.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 25 218145 PRS 00 IV (Order Issued Property Standards: The roof or one of its component is not free from leak..., 2025, status Order Issued); 25 214913 PRS 00 IR (Property Standards, 2025, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 175071 (The existing 1 1/2 - storey house is to be removed for redevelopment of condominium (pa..., 2026); 26 246786 NNY 18 OZ (OPA & Rezoning Application proposes the development of a 13-storey mixed-use building p..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 13 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Development application26 246786 NNY 18 OZApplication Received

    OPA & Rezoning Application proposes the development of a 13-storey mixed-use building providing residential and commercial use at grade. The building will provide a total of 235 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Willowdale Ave along the southern property line will be provided, leading to 2 levels of below-grade parking, providing a total of 146 parking spaces; as well as 182 bicycle parking spaces. The proposed development provides a total GFA of 20,313.29 square metres and a FSI of 5.18. Additionally, the proposed development provides 497.19 square metres of indoor amenity space and 423.58 square metres of outdoor amenity space.

    Sep 30, 2026 · 121 FINCH AVE E
  • By-law investigation26 181132 LGW 00 IRClosed

    Long Grass and Weeds

    Jun 9, 2026 · 121 FINCH AVE E
  • Building permit26 175071Examiner's Notice Sentdemolition

    The existing 1 1/2 - storey house is to be removed for redevelopment of condominium (part of lots 15,16 & 42 Finch Ave. East). All utility supplies have been disconnected with the existing building that is not livable anymore.

    Jun 1, 2026 · 121 FINCH AVE E
  • By-law investigation25 218145 PRS 00 IVOrder Issued

    Order Issued Property Standards: The roof or one of its component is not free from leaks. Namely, holes in the roof.; The roof or one of its components is not weather tight. Namely, roof shingles are damaged and deteriorated.

    Aug 22, 2025 · 121 FINCH AVE E
  • By-law investigation25 214913 PRS 00 IROrder Issued

    Property Standards

    Aug 22, 2025 · 121 FINCH AVE E
  • By-law investigation25 214797 LGW 00 IVClosed

    Notice Issued Long Grass

    Aug 13, 2025 · 121 FINCH AVE E
  • By-law investigation25 209530 LGW 00 IRClosed

    Long Grass and Weeds

    Aug 13, 2025 · 121 FINCH AVE E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
662 m²
Frontage
13.6 m
Depth
48.8 m
Street
Finch Ave E
Corner lot
No
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    95%18 of 19 decisions
    Garden suite permits
    3
    Laneway suite permits
    0
    Multiplex permits
    4
    Development applications
    3

    Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards, as approved under Site-Specific Zoning By-law 256-2025, for the proposed 14-storey mixed use building, including to increase the gross floor area and, building height, and modifications to the setbacks, amenity space and bicycle parking requirements.

      104 FINCH AVE E · Sep 3, 2026 · 119 m away
    • Minor varianceApproved

      To construct a three-storey detached dwelling with an integral garage.

      105 BYNG AVE · Jul 23, 2026 · 499 m away
    • Minor varianceApproved

      To construct a new dwelling.

      228 BYNG AVE · Mar 26, 2026 · 481 m away
    • Minor varianceApproved

      To convert the existing three-storey dwelling, containing two dwelling units, into a triplex by converting the existing third floor into an additional unit.

      191 FINCH AVE E · Sep 11, 2025 · 425 m away
    • Minor varianceApproved

      To convert the existing three-storey dwelling, containing two dwelling units, into a triplex by converting the existing third floor into an additional unit.

      189 FINCH AVE E · Sep 11, 2025 · 419 m away

    Latest activity nearby

    • Building permitgarden suite, multiplex

      Proposal to demolish existing single family dwelling and construct a fourplex and two-storey garden sutie.See also 26-153543 ZAP & 26-250117 BLD 00 NH

      165 PEMBERTON AVE · Oct 6, 2026 · 237 m away
    • Building permitmultiplex, new building, new house

      Proposal to demolish existing single family dwelling and construct a three-storey fourplex dwelling.See 26-153548 ZAP 00 ZR

      165 PEMBERTON AVE · Oct 6, 2026 · 237 m away
    • Development application

      OPA & Rezoning Application proposes the development of a 13-storey mixed-use building providing residential and commercial use at grade. The building will provide a total of 235 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Willowdale Ave along the southern property line will be provided, leading to 2 levels of below-grade parking, providing a total of 146 parking spaces; as well as 182 bicycle parking spaces. The proposed development provides a total GFA of 20,313.29 square metres and a FSI of 5.18. Additionally, the proposed development provides 497.19 square metres of indoor amenity space and 423.58 square metres of outdoor amenity space.

      125 FINCH AVE E · Sep 30, 2026 · 17 m away
    • Building permitgarden suite

      Proposal to change existing garage to garden suite.

      154 PEMBERTON AVE · Sep 4, 2026 · 232 m away
    • Minor varianceApproved

      To alter the development standards, as approved under Site-Specific Zoning By-law 256-2025, for the proposed 14-storey mixed use building, including to increase the gross floor area and, building height, and modifications to the setbacks, amenity space and bicycle parking requirements.

      104 FINCH AVE E · Sep 3, 2026 · 119 m away
    • Building permitnew building, new house

      REV 01: Revision to issued building permit (No. 24 144060 BLD 00 NH) for modifications to the lower basement, main floor, and side elevations.Proposal to construct a two storey dwelling with a finished basement, front porch, rear deck and basement walkout.

      143 OLIVE AVE · Aug 26, 2026 · 132 m away
    • Zoning review

      Not Started

      114 FINCH AVE E · Aug 20, 2026 · 85 m away
    • Building permit

      Proposal to comply with OTC, converting dwelling to office with residential unit. The proposal consists of a new front porch and rear canopy, along with interior alterations to the existing building, to facilitate and legalize the conversion of the dwelling unit to a medical office use. (2010-213087 NNY 23 OZ)

      89 FINCH AVE E · Aug 18, 2026 · 208 m away
    • Development application

      Proposal for a mixed-use development in the form of an 11-storey mid-rise building with ground floor retail fronting Finch Avenue East.

      114 FINCH AVE E · Jul 31, 2026 · 97 m away · City file
    • Building permit

      Proposal to install Rooftop Solar Panel

      103 OLIVE AVE · Jun 2, 2026 · 179 m away

    Neighbourhood: East Willowdale

    About the area around the lot, not the lot itself.

    Nearest station
    Finch Station11 min walk
    Nearest TTC stop
    Willowdale Ave at Finch Ave East1 min walk
    Nearest cycling route
    Willowdale AveCycle Track, 1 min walk
    Nearest traffic count
    39,230 vehicles in 14 hFinch Ave E / Willowdale Ave, 50 m away, Jun 4, 2024
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Pemberton Parkette4 min walk
    Bishop Park7 min walk
    Longmore Park8 min walk

    Schools within 1 km

    • AVONDALE SECONDARY ALTERNATIVE SCHOOL English Public 11 min walk
    • TFS Private 12 min walk
    • DARYK HIGH Private 12 min walk
    • CUMMER VALLEY MDL SCHOOL English Public 14 min walk
    • MCKEE PUBLIC SCHOOL English Public 14 min walk
    • ST CYRIL CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureEast WillowdaleMedian neighbourhood
    Median household income (2020)$95,000$84,500
    Households that own their home70%54%
    Population (2021)15,48516,813
    Homes built in 1960 or before15%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleEast WillowdaleCity median
    Assault295.1636.3
    Robbery56.869.5
    Shootings5.710.5
    Auto theft181.6192.6
    Theft over $5,00051.146.1
    Break and enter198.6172.8
    Theft from vehicles193188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.