HousePrecheckCheck an address

120 Subway CresToronto · zoning, lot size and permit records

≈ 53.7 × 97.8 m3,479 m²on Subway Cres

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 5 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N20 m
≈ 53.7 m frontage≈ 97.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit24 205702Closed

    Proposal for new Second Cup Kiosk in the Kipling Go Station

    Dec 3, 2024 · 120 SUBWAY CRES
  • Zoning review20 107475 ZPRClosed
    Jan 22, 2020 · 120 SUBWAY CRES
  • Building permit19 123444Closed

    Revision 01: General revision to the permit plansProposed above ground renovation of Passenger Pick Up and Drop off including a new elevator to accommodate the tie-in with the new Metrolinx tunnel from the Bus Terminal. @ Kipling station

    Nov 12, 2019 · 120 SUBWAY CRES
  • Zoning review18 150050 PSPClosed
    Jul 4, 2018 · 120 SUBWAY CRES
  • Zoning review16 129534 PSPClosed
    Apr 30, 2018 · 120 SUBWAY CRES
  • Development application18 150050 WET 05 SAClosed

    Kipling Bus Terminal development - parking lot

    Apr 27, 2018 · 120 SUBWAY CRES · City file
  • Development application16 129534 WET 05 SAClosed

    Proposed development of a new bus terminal. See file Number 18 150050 WET 05 SA

    Mar 18, 2016 · 120 SUBWAY CRES · City file

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,479 m²
Frontage
53.7 mestimated, irregular lot
Depth
97.8 mestimated, irregular lot
Street
Subway Cres
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%11 of 11 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    19

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a 50-storey mixed use building.

      5359 DUNDAS ST W · Jul 16, 2026 · 97 m away
    • Minor varianceApproved

      To modify the development standards from site specific By-law 1268-2018.

      5365 DUNDAS ST W · Dec 4, 2025 · 133 m away
    • Minor varianceApproved

      To construct a second and third storey addition above the existing dwelling, and a three-storey rear addition. The altered dwelling will be converted into a triplex.

      33 ACORN AVE · Nov 20, 2025 · 352 m away
    • Minor varianceApproved

      To alter the development standards as outlined in By-law 924-2024 in order to accommodate a 41-storey purpose-built rental building that will contain a total of 521 residential units.

      5238 DUNDAS ST W · Oct 23, 2025 · 370 m away
    • Minor varianceApproved

      To permit a bicycle parking space deficiency in order to accomodate the development of a fifty-storey mixed use building.

      5251 DUNDAS ST W · Aug 14, 2025 · 293 m away

    Latest activity nearby

    • Consent (lot split)Pending

      Accepted

      5365 DUNDAS ST W · Feb 18, 2027 · 133 m away
    • Building permit

      Revision 1: Proposal to incorporate tiebacks on the south side.Shoring and excavation for soil remediation

      5359 DUNDAS ST W · Nov 18, 2026 · 97 m away
    • Building permit

      INTERIOR FIT-UP FOR MEDICAL UNIT WITH PHARMACY

      5415 DUNDAS ST W · Nov 10, 2026 · 274 m away
    • Building permit

      Alternative solution proposal to address the proposed design in relation to the extended tranve distance within the P1 & P2 level of the below-grade parking service Phase 2 of the KIP development.

      5365 DUNDAS ST W · Sep 2, 2026 · 133 m away
    • Minor varianceApproved

      To construct a 50-storey mixed use building.

      5359 DUNDAS ST W · Jul 16, 2026 · 97 m away
    • Zoning review

      Closed

      5286 DUNDAS ST W · Jul 7, 2026 · 204 m away
    • Building permit

      Proposal for interior alterations of an existing gas station convenience store, replace existing walk-in cooler with new walk-in cooler plus associated sales area renovation

      5286 DUNDAS ST W · May 14, 2026 · 204 m away
    • Building permit

      4 Wall Sign3 Ground Sign

      5322 DUNDAS ST W · Apr 29, 2026 · 213 m away
    • Building permitdemolition

      DEMOLITION OF EXISTING BUILDING ON SITE

      5359 DUNDAS ST W · Apr 28, 2026 · 97 m away
    • Zoning review

      Closed

      5359 DUNDAS ST W · Apr 7, 2026 · 97 m away

    Neighbourhood: Etobicoke City Centre

    About the area around the lot, not the lot itself.

    Nearest station
    Kipling Station5 min walk
    Nearest TTC stop
    Dundas St West at Poplar Ave2 min walk
    Nearest cycling route
    Dundas St WCycle Track, 5 min walk
    Nearest traffic count
    16,801 vehicles in 8 hDundas St W / Poplar Ave / Subway Cres, 120 m away, Nov 29, 2023
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Cloverdale Park6 min walk
    Six Points Park8 min walk
    Greenfield Park9 min walk

    Schools within 1 km

    • MINDWERX4KIDS LEARNING CENTRE SCHOOL Private 10 min walk
    • KINGSLEY PRIMARY SCHOOL Private 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureEtobicoke City CentreMedian neighbourhood
    Median household income (2020)$83,000$84,500
    Households that own their home50%54%
    Population (2021)23,60016,813
    Homes built in 1960 or before9%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleEtobicoke City CentreCity median
    Assault844.4636.3
    Robbery187.769.5
    Shootings16.210.5
    Auto theft601.8192.6
    Theft over $5,000200.646.1
    Break and enter210.3172.8
    Theft from vehicles278.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.