Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
8 building permits open, the oldest since 2014
Needs a closer lookStill open in the City's records: 23 122827 (Curtainwall replacement on exterior of plant. No interior work.640 sm, 2023, status Inspection); 23 119347 (Replacement of fire alarm control panel, 2023, status Permit Issued); 19 220615 (Revison #1 - Enwave - Convert an existing, below-grade oil storage room into a chiller..., 2020, status Revision Issued); and 5 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 24 224868 (Removal of the existing roof deck and roofing on the entire existing plant and replacin..., 2024).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications18 development applications open within 300 m
Good to know18 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
29 records on file: more than at 100% of Toronto houses (median 0).
- Building permit25 244635Closed
1 WALL SIGN**ENWAVE GREEN HEAT**
Oct 30, 2025 · 120 PEARL ST - Building permit24 224868Inspection
Removal of the existing roof deck and roofing on the entire existing plant and replacing with new.
Nov 27, 2024 · 120 PEARL ST - Building permit23 122827Inspection
Curtainwall replacement on exterior of plant. No interior work.640 sm
Apr 26, 2023 · 120 PEARL ST - Building permit23 119347Permit Issued
Replacement of fire alarm control panel
Apr 24, 2023 · 120 PEARL ST - Building permit22 215402Closed
FS - Sprinkler Shop Drawing - Proposal for a building addition to the industrial building (Steam Plant) to house a new heat pump plant. See also 21 247571 ZPR.
Dec 13, 2022 · 120 PEARL ST - Zoning review21 247571 ZPRClosedDec 12, 2021 · 120 PEARL ST
- Building permit21 184308Cancelled
Installation of 3 roof drains (1 at west roof, 1 at central high roof, 1 at east roof), associated reinforcing of roof structure to accomodate openings for roof drains, and re-roofing of central portion of high roof and north half of east roof.
Jul 14, 2021 · 120 PEARL ST - Building permit20 142015Closed
install backflow device
Jun 5, 2020 · 120 PEARL ST
Show 21 older records
- Building permit19 220615Revision Issued
Revison #1 - Enwave - Convert an existing, below-grade oil storage room into a chiller room, in an Existing Industrial Building.
Feb 20, 2020 · 120 PEARL ST - Building permit19 198559Permit Issued
Proposed interior alterations in basement of existing industrial building, as well as removal of existing sprinkler system and replacement with new.
Sep 4, 2019 · 120 PEARL ST - Building permit19 146811Closed
Proposed Interior Alterations to Existing Control Room and Vestibule within the Existing 'Steam Plant' (Existing Industrial Building).
Jun 3, 2019 · 120 PEARL ST - Zoning review19 106676 ZPRClosedJan 21, 2019 · 120 PEARL ST
- Building permit17 135298Closed
Install new Sprinklers system for protection
Apr 26, 2017 · 120 PEARL ST - Building permit16 146844Permit Issued
Proposal to construct a building addition containing a new mechanical shaft to an existing builidng.
Jun 9, 2016 · 120 PEARL ST - Building permit16 111533Permit Issued
Proposal for interior alterations on the basement and mezzanine level, exit stair will be removed, "Enwave Energy Corporation"
Feb 29, 2016 · 120 PEARL ST - Building permit15 188137Closed
Proposal for slab repair to the interior of the existing steam plant.
Aug 13, 2015 · 120 PEARL ST - Building permit15 148072Permit Issued
Proposal for gound floor and basement concrete repairs in existing steam power plant.
Jun 18, 2015 · 120 PEARL ST - Zoning review15 129864 ZZCClosedMar 19, 2015 · 120 PEARL ST
- Building permit14 196800Permit Issued
Proposal for gound floor and basement concrete repairs in existing steam power plant.
Jul 30, 2014 · 120 PEARL ST - Building permit13 202914Closed
Proposal to replace window openings on west face and interior alterations to extend platform floor on the ground floor of existing steam power plant.
Jul 16, 2013 · 120 PEARL ST - Building permit11 163789Closed
Proposal to construct structural steel support and associated access stair on roof of existing steam plant to facilitate the installatin of new roof top backup generator. Also see related building permit 10-153006 BLD.
Jun 14, 2011 · 120 PEARL ST - Zoning review11 119552 ZPRClosedFeb 3, 2011 · 120 PEARL ST
- Building permit10 185438Closed
Sprinkler permit in conjunction with 10 153006 BLD.
Sep 27, 2010 · 120 PEARL ST - Building permit10 208925Closed
permit for interior alterations to basement of existing power plant - 141 m2
Jul 13, 2010 · 120 PEARL ST - Building permit10 153006Closed
Proposal to construct mechanical platform above ground floor level. Platform to be used for boiler equipment.
Jun 10, 2010 · 120 PEARL ST - Building permit08 213068Closed
Excavation and shoring to facilitate installation of 3 new diesel fuel tanks.
Nov 5, 2008 · 120 PEARL ST - Building permit08 158367Closed - Dormant
HVAC - interior alterations to existing washrooms and changerooms on main floor and second floor mezzaninenew kitchen facilities on second floor mezzanine.
Jun 26, 2008 · 120 PEARL ST - Zoning review00 035916 ZSVClosedJul 4, 2000 · 120 PEARL ST
- Zoning review00 153119 000ClosedMay 19, 2000 · 120 PEARL ST
Check before you build
Site-specific exception 900.11.10(2333)
Needs a closer look1 site-specific rule and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page. 1 part is limited to an area drawn on a by-law diagram; check whether this lot is in it.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
These premises must comply with Exception 900 11.10(2).
- Older by-law A
Section 12(1) 333 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(2) 208 of former City of Toronto By-law 438-86
- Older by-law E
Section 12(2) 276 of former City of Toronto By-law 438-86
- Older by-law S
On the even numbered addresses of 118A-120 Pearl St., 180 University Ave., former City of Toronto by-law 287-90 and Section 12(2) 235 of former City of Toronto By-law 438-86
- Older by-law Y · diagram area
On the even numbered addresses 180 to 188 University Ave., 192 and 194 Adelaide St. W., City of Toronto by-law 469-06
21 parts for other addresses
- F On 77 Adelaide St. W., former City of Toronto by-law 131-78
- G On 105 Adelaide St. W., 77 Adelaide St. W., 120 King St. W., 130 King St. W., former City of Toronto by-laws 47-80 and 121-80
- H On 141 Bay St., 45 Bay St., 40 Bay St., 55 Bremner Blvd., 222 Bremner Blvd., 280 Bremner Blvd., the odd numbered addresses of 61-71 Front St. W., 18 Yonge St., …
- I On 220 Bay St., former City of Toronto by-law 475-91
- J On 222 Bay St., the odd numbered addresses of 55-77 King St. W., 100 Wellington St. W., former City of Toronto by-law 207-88
- K On or between the even numbered addresses of 390-394 Bay St., 65 Queen St. W., former City of Toronto by-law 119-68
- L On 320 Bay St., former City of Toronto by-law 56-87
- M On 121 King St W., Section 12(2) 135 of former City of Toronto By-law 438-86
- N On 145R King St. W., the odd numbered addresses of 95-107 Wellington St. W., 70 York St., former City of Toronto by-law 442-88
- O On 150 King St. W., 75 Simcoe St., former City of Toronto by-law 416-81
- P On 150 King St W., Section 12(2) 121 of former City of Toronto By-law 438-86
- Q On 200 King St. W., 71 Simcoe St., 73 Simcoe St., former City of Toronto by-law 417-81
- R On 200 King St W., Section 12(2) 123 of former City of Toronto By-law 438-86
- T On 73 Richmond St. W. and 66 Temperance St., City of Toronto by-law 149-02
- U On the lands municipally known as 75 Simcoe St. in 1981, Section 12(2) 120 and 12(2) 122 of former City of Toronto By-law 438-86
- V On 1 University Ave., former City of Toronto by-laws 27-83 and 129-83
- W On 33 University Ave., Section 12(2) 136 of former City of Toronto By-law 438-86
- X On 155 University Ave., former City of Toronto by-law 283-85
- Z On 79 Wellington St. W., 85 Wellington St. W., former City of Toronto by-law 318-83
- AA On the odd numbered addresses of 95-107 Wellington St. W., former City of Toronto by-laws 30-83 and 592-84
- AB On the even numbered addresses of 150-166 York St., former City of Toronto by-laws 335-80, 522-80, and 107-81.
Lot facts
- Area
- 2,096 m²
- Frontage
- 38.6 m
- Depth
- 57.1 m
- Street
- Pearl St
- Corner lot
- No
- Public lane
- Ln W University N Pearl, 37.6 m along it
- House footprint
- 1,460 m²roof up to 83.1 m
- Back yard
- 0.5 mhouse to rear lot line
- Side yards
- 0.9 m and 7.9 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 76 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: King. The lot is inside the King Major Transit Station Area approved by the Province (Site and Area Specific Policy 606). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 12.0 (c8.0; r11.7) SS1 (x2333) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%19 of 19 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 1
- Development applications
- 28
Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing 26-storey non-residential building (office use) by constructing a one-storey ground floor addition (patio enclosure for an eating establishment), along the east side of the building.
121 KING ST W · Jul 8, 2026 · 260 m away - Minor varianceApproved
To alter the existing three-storey non-residential building by converting the vacant second and third levels into a place of amusement (escape room). The existing restaurant use (café) and retail use, on the ground level, will be maintained and unaltered.
333 QUEEN ST W · Apr 1, 2026 · 496 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 105-2022 (OLT)) for a 47-storey mixed-use building (containing 432 residential dwelling units, retail use on the ground level, and office use on second, third and fourth levels), by reducing the required number of vehicular parking spaces for the residents of this building.
263 ADELAIDE ST W · Jan 28, 2026 · 288 m away - Minor varianceApproved
To alter the existing 17-storey mixed-use building by constructing a side (east) one-storey addition (patio enclosure for the existing outdoor dining area of Local Public Eatery), abutting Adelaide Street West, and York Street.
141 ADELAIDE ST W · Jan 14, 2026 · 155 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1219-2023(OLT) for a 61-storey mixed-use building, by increasing the building height to 67-storeys (223 m), the maximum gross floor area (residential and overall), a wind damper enclosure projection beyond the maximum building height, as well as to reduce the minimum non-residential gross floor area (remove the office uses), and reduce the number of loading spaces. There will be a total of 1,003 residential dwelling units on this lot (including 46 affordable units), subject to review under the related Site Plan Control Application (File 20 22 119164 STE 10 SA).
100 SIMCOE ST · Sep 10, 2025 · 54 m away
Latest activity nearby
- Minor variancePending
To alter the existing 42-storey mixed-use building by constructing a side (west) one-storey addition (to enclose the existing patio with two new side (west) principal entrances for the existing eating establishment), abutting Wellington Street West.
155 WELLINGTON ST W · Nov 25, 2026 · 274 m away - Building permit
Proposed interior demolition back to base, including mechanical and sprinkler work.
130 KING ST W · Nov 24, 2026 · 211 m away - Building permit
Proposed interior alterations to convert existing storage room to new washroom in existing office suite.
150 YORK ST · Nov 24, 2026 · 190 m away - Building permit
Proposed Interior build-out and alterations to an existing offices.
150 KING ST W · Nov 24, 2026 · 151 m away - Building permit
Rev 01 - Addition of the sink sewage sump pump in the meeting lounge 1713interior tenant fit-out including demolition, floor preparation, millwork installations, new doors and glazing, drywall partitions and ceilings, flooring and painting, appliance installation, and associated mechanical and electrical work
121 KING ST W · Nov 24, 2026 · 260 m away - Zoning review
Closed
136 SIMCOE ST · Nov 23, 2026 · 151 m away - Building permit
Proposal for interior alterations in existing vacant retail unit for new coffee shop.
154 UNIVERSITY AVE · Nov 23, 2026 · 34 m away - Building permit
Interior alterations to unit 500
111 RICHMOND ST W · Nov 23, 2026 · 294 m away - Building permit
Proposal for localized loading dock slab concrete repairs and waterproofing replacement
180 WELLINGTON ST W · Nov 20, 2026 · 226 m away - Building permit
Proposed Fire/Security upgrades for 5 Fire Alarm Control Panels/Nodes by replacing CPU's and LCD's in existing Edwards Fire Alarm Panels ETS3.
55 UNIVERSITY AVE · Nov 19, 2026 · 225 m away
Neighbourhood: Yonge-Bay Corridor
About the area around the lot, not the lot itself.
- Nearest station
- St. Andrew Station1 min walk
- Nearest TTC stop
- St Andrew Station - Northbound Platform1 min walk
- Nearest cycling route
- Simcoe StCycle Track - Contraflow, 1 min walk
- Nearest traffic count
- 12,469 vehicles in 14 hAdelaide St W / Simcoe St, 60 m away, Oct 15, 2025
- Serious collisions within 500 m
- 92021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 4 with cyclists
- Parks
- Simcoe Park6 min walk
- Grasett Park7 min walk
- St. Patricks Square7 min walk
Schools within 1 km
- OCAD UNIVERSITY - INCLUSIVE DESIGN INSTITUTE University 8 min walk
- OCAD UNIVERSITY - STUDENT CENTRE University 8 min walk
- OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 10 min walk
- OCAD UNIVERSITY - THE LEARNING ZONE University 11 min walk
- OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 11 min walk
- CONTACT ALTERNATIVE SCHOOL English Public 11 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Yonge-Bay Corridor | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $68,500 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 12,645 | 16,813 |
| Homes built in 1960 or before | 2% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Yonge-Bay Corridor | City median |
|---|---|---|
| Assault | 3361.1 | 636.3 |
| Robbery | 300.1 | 69.5 |
| Homicide | 12 | 5.3 |
| Shootings | 12 | 10.5 |
| Auto theft | 162.1 | 192.6 |
| Theft over $5,000 | 210.1 | 46.1 |
| Break and enter | 552.2 | 172.8 |
| Theft from vehicles | 402.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.