Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterBuilding permit open since 2019
Needs a closer lookStill open in the City's records: 19 120181 (Proposal to construct heavy timber open air gazebo and concrete stage, 2019, status Revocation Pending).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)14 development applications open within 300 m
Good to know14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
1 records on file: more than at 53% of Toronto houses (median 0).
- Building permit19 120181Revocation Pending
Proposal to construct heavy timber open air gazebo and concrete stage.
Mar 7, 2019 · 120 KING ST E
Lot facts
- Area
- 13,116 m²
- Frontage
- 110.8 m
- Depth
- 127.7 m
- Street
- King St E
- Corner lot
- Yes, also on Jarvis St127.7 m along it
- Public lane
- None
- House footprint
- 30 m²roof up to 18.8 m
- Back yard
- 91.6 mhouse to rear lot line
- Side yards
- 0.5 m and 86.6 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 23 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
- 9 City trees in front of this lot. The City's street tree inventory lists 9 trees at this address: ash, green (62 cm), ash (28 cm), honey locust (24 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 92%12 of 13 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 29
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Zoning review
Application On Hold
91 FRONT ST E · Nov 24, 2026 · 222 m away - Building permit
Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.
99 QUEEN ST E · Nov 20, 2026 · 294 m away - Building permit
Proposal for additions and interior alterations to existing Nightclub at 17-19 Toronto St.
19 TORONTO ST · Nov 16, 2026 · 257 m away - Building permit
Rev 02: Addition of exterior window replacement; Change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR; Door replacement at 2nd floor Bar EntranceREV 01: - addition of exterior window replacement, change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR, door replacement at 2nd floor Bar EntranceProposal for interior renovations to 3rd & 4th Floors; extention of exit stair; addition of roof-top stair enclosure; plus wood deck and guard on the roof. New sprinkler system for the entire building.
124 CHURCH ST · Nov 16, 2026 · 264 m away - Building permit
Revision 01 - due site conditions and landlord repairsProposed interior alterations and repairs due to fire damage.
47 COLBORNE ST · Nov 9, 2026 · 269 m away - Zoning review
Not Started
100 LOMBARD ST · Nov 6, 2026 · 175 m away - Building permit
UNIT 301 INTERIOR NON-STRUCTURAL PARTITION DEMOLITION
47 COLBORNE ST · Nov 6, 2026 · 269 m away - Building permit
REVISION- 03Rev 02 - Scope clarified and simplified for future tenant (Back to Base project with plumbing rough-ins). Build out of future space by others (under separate future permit).REVISION 01:Interior alterations - back to base building - group A occupancy
71 FRONT ST E · Nov 5, 2026 · 261 m away - Building permit
Proposal for iInterior alterations to a group D office building - UNIT 400
47 COLBORNE ST · Nov 4, 2026 · 269 m away - Building permit
Proposal for maglock permit adding maglocks to existing patio doors
65 KING ST E · Nov 4, 2026 · 259 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- King Station8 min walk
- Nearest TTC stop
- King St West at Jarvis St West Side1 min walk
- Nearest cycling route
- Adelaide St ECycle Track, 1 min walk
- Nearest traffic count
- 27,065 vehicles in 14 hAdelaide St E / Jarvis St / St. James Park Trl, 90 m away, Jul 3, 2025
- Serious collisions within 500 m
- 122021–2026, killed or seriously injured: 2 fatal, 7 with pedestrians, 2 with cyclists
- Parks
- St. James Park1 min walk
- Market Lane Park1 min walk
- Toronto Sculpture Garden2 min walk
Schools within 1 km
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 4 min walk
- KEYSTONE INTERNATIONAL SCHOOLS Private 4 min walk
- VICTORIA STREET LINC English Public 6 min walk
- DOWNTOWN ALTERNATIVE SCHOOL English Public 7 min walk
- ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 7 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.