HousePrecheckCheck an address

120 Emmett AveToronto · zoning, lot size and permit records

Institutional · I≈ 26.4 × 91.1 m1,655 m²on Emmett Ave

Not a home

An institution

The zoning by-law sets this parcel aside for an institution. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • An institutionVisitors, traffic and parking in its busy hours.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N20 m
≈ 26.4 m frontage≈ 91.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A261/15EYK (To make interior alterations to the existing place of worship and to construct a new ea..., 2015); A69/13EYK (To construct a three-storey rear addition to the existing place of worship, 2013).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation25 225257 WST 00 IRClosed

    Waste

    Sep 14, 2025 · 120 EMMETT AVE
  • Zoning review25 208417 ZAPNotice Sent
    Aug 11, 2025 · 120 EMMETT AVE
  • Building permit16 134189Closed

    Permit for interior alterations to existing Place of Worship (769m2) to construct new teaching areas, washrooms, offices and ancillary spaces. Alterations to existing prayer hall mezzanine. Renovation of existing kitchen. Installation of new stair and handicapped lift. Installation of new windows and doors - The Vedanta Society of Toronto.

    Aug 5, 2016 · 120 EMMETT AVE
  • Building permit15 168511Closed

    Permit for interior alterations to exiisting Place of Worship to existing Alter area, entrance area, & add additional exit doors.

    Jul 29, 2015 · 120 EMMETT AVE
  • Minor varianceA261/15EYKApproved

    To make interior alterations to the existing place of worship and to construct a new east side deck.

    Jun 18, 2015 · 120 EMMETT AVE
  • Zoning review15 122220 ZZCClosed
    Feb 27, 2015 · 120 EMMETT AVE
  • Zoning review14 260680 ZZCCancelled
    Dec 5, 2014 · 120 EMMETT AVE
  • Minor varianceA69/13EYKApproved

    To construct a three-storey rear addition to the existing place of worship.

    May 9, 2013 · 120 EMMETT AVE
Show 3 older records
  • Zoning review12 281008 ZPRClosed
    Nov 19, 2012 · 120 EMMETT AVE
  • Building permit02 185016Closed

    Enclose existing exterior staircase from basement.

    Oct 6, 2003 · 120 EMMETT AVE
  • Zoning review02 172340 ZPRClosed
    Sep 12, 2002 · 120 EMMETT AVE

Lot facts

Area
1,655 m²
Frontage
26.4 mestimated, irregular lot
Depth
91.1 mestimated, irregular lot
Street
Emmett Ave
Corner lot
No
Public lane
None
House footprint
556 m²roof up to 13.6 m
Back yard
54.5 mhouse to rear lot line
Side yards
1.4 m and 4.7 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Mount Dennis Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone I (Institutional). Chapter 80, section 80.10 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To make interior alterations to the existing place of worship and to construct a new east side deck.

    120 EMMETT AVE · Jun 18, 2015 · 17 m away

Latest activity nearby

  • Zoning review

    Notice Sent

    120 EMMETT AVE · Aug 11, 2025 · 17 m away
  • Building permit

    Proposal for garage repairs

    85 EMMETT AVE · Jun 30, 2025 · 223 m away
  • Building permit

    FS - Sprinkler Shop Drawing - Proposed interior alteration for new "Freshii / Second Cup" kiosk in Food Court

    170 EMMETT AVE · Jun 2, 2025 · 193 m away
  • Building permit

    Proposal for Alternative Solutions for exterior wall fire rating

    170 EMMETT AVE · Mar 18, 2025 · 193 m away
  • Development application

    Site Plan Control application to permit an interim condition where the new hospital and old hospital buildings will co-exist on the site for a temporary period of time.

    82 BUTTONWOOD AVE · Feb 19, 2025 · 234 m away · City file
  • Building permit

    Proposal to install back flow preventer in existing incoming water main.

    100 EMMETT AVE · Feb 11, 2025 · 263 m away
  • Zoning review

    Closed

    150 EMMETT AVE · Nov 8, 2024 · 297 m away
  • Development application

    Proposal to have the main building (RCC) that was to have been demolished as part of the works under the current SPA remain and be used to house patients for a 5-10 year duration.

    82 BUTTONWOOD AVE · Oct 17, 2024 · 234 m away · City file
  • Building permit

    Proposed Fire Alarm replacement.

    100 EMMETT AVE · Sep 5, 2024 · 263 m away
  • Building permit

    Proposed retail pharmacy (no compounding), empty unit fit-up

    170 EMMETT AVE · Jun 5, 2024 · 193 m away

Neighbourhood: Mount Dennis

About the area around the lot, not the lot itself.

Nearest station
Weston GO Station26 min walk
Nearest TTC stop
120 Emmett Ave at Roadway to West Park Healthcare Centre1 min walk
Nearest cycling route
Humber River Recreational TrlMulti-Use Trail, 5 min walk
Nearest traffic count
12,733 vehicles in 8 hScarlett Rd / Richview Rd, 350 m away, Sep 28, 2017
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Canadian Ukrainian Memorial Park1 min walk
Eglinton Flats1 min walk
Portage Gardens Park6 min walk

Schools within 1 km

  • YORK HUMBER HIGH SCHOOL English Public 4 min walk
  • PORTAGE TRAIL COMMUNITYSCHOOL English Public 9 min walk
  • BALA AVENUE COMMUNITY SCHOOL English Public 13 min walk
  • WESTMOUNT JR SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount DennisMedian neighbourhood
Median household income (2020)$70,500$84,500
Households that own their home48%54%
Population (2021)13,05516,813
Homes built in 1960 or before30%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount DennisCity median
Assault562.1636.3
Robbery83.369.5
Homicide6.95.3
Shootings13.910.5
Auto theft152.7192.6
Theft over $5,00013.946.1
Break and enter124.9172.8
Theft from vehicles180.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.