HousePrecheckCheck an address

120 Bloor St EToronto · zoning, lot size and permit records

Commercial residential · CR 6.0 (c4.5; r6.0) SS1 (x2480)71.5 × 99.7 m7,050 m²on Bloor St Ecorner, also on Park Rd

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 23 200617 (Revision 01 - resulted fro site conditions and client requirements - see narrativePropo..., 2024, status Revision Issued); 23 176393 (Proposal for Exterior alteration - Renovate existing entrance on park road - see cover..., 2023, status Inspection); 22 234751 (Proposed fire alarm panel replacement and device for device replacement, 2023, status Permit Issued); and 4 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 69 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.
N50 m
71.5 m frontage99.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 7 building permits open, the oldest since 2013

    Needs a closer look

    Still open in the City's records: 23 200617 (Revision 01 - resulted fro site conditions and client requirements - see narrativePropo..., 2024, status Revision Issued); 23 176393 (Proposal for Exterior alteration - Renovate existing entrance on park road - see cover..., 2023, status Inspection); 22 234751 (Proposed fire alarm panel replacement and device for device replacement, 2023, status Permit Issued); and 4 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 259565 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

113 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 187444Closed

    Proposed interior fit out to update existing school to new school finishes and layout

    Aug 17, 2026 · 120 BLOOR ST E
  • Building permit25 252492Closed

    REVISION 02 - layout changesREVISION - relocation of the student lounge by swapping it with a classroom and addition of five (5) toilet roomsProposal for interior alterations to existing school

    Apr 2, 2026 · 120 BLOOR ST E
  • By-law investigation25 259565 PRS 00 IRClosed

    Property Standards

    Nov 27, 2025 · 120 BLOOR ST E
  • Building permit23 200617Revision Issued

    Revision 01 - resulted fro site conditions and client requirements - see narrativeProposed interior alterations to suite 400 for a commercial school.

    Mar 12, 2024 · 120 BLOOR ST E
  • Building permit23 215180Closed

    Proposed work is to connecting/rewiring a new access control system to existing 30 maglocks in existing office building on floors 6, 7 and lower level (two rooms).

    Oct 19, 2023 · 120 BLOOR ST E
  • Building permit23 131803Closed

    REV 01: Multiple proposed changes see list.Interor alterations to suite 100 and 200 for commercial school (occupancy A2) - 4353.36m2

    Aug 10, 2023 · 120 BLOOR ST E
  • Building permit23 131757Closed

    Revision 01 - changes due to site conditionsInterior alterations to suite 300

    Aug 10, 2023 · 120 BLOOR ST E
  • Building permit23 158813Closed

    Proposal for interior alterations to return the existing 4th & 5th office floor levels to base building condition.

    Aug 4, 2023 · 120 BLOOR ST E
Show 105 older records
  • Building permit23 176393Inspection

    Proposal for Exterior alteration - Renovate existing entrance on park road - see cover letter

    Jul 28, 2023 · 120 BLOOR ST E
  • Building permit23 178325Closed

    Interior alterations to basement storage

    Jul 27, 2023 · 120 BLOOR ST E
  • Building permit23 168073Cancelled

    Proposed interior alterations to existing Park Road entrance in an existing school.

    Jun 30, 2023 · 120 BLOOR ST E
  • Building permit23 119139Closed

    Proposed interior alterations to return an existing office on the 3rd floor level to base building condition.

    Mar 30, 2023 · 120 BLOOR ST E
  • Building permit22 222870Closed

    REV 01: INTERIOR ALTERATIONS TO RUN A NEW NORTH CORRIDOR THROUGH AN EXISTING NORTH TENANT SPACE TO CONNECT TO THE EXISTING LOBBY SPACE.Proposal for interior alterations to the ground floor lobby area in this non-residential building. Addition of a new security desk, finish & fixture upgrades.

    Mar 9, 2023 · 120 BLOOR ST E
  • Building permit22 234751Permit Issued

    Proposed fire alarm panel replacement and device for device replacement.

    Jan 4, 2023 · 120 BLOOR ST E
  • Zoning review22 223937 ZAPClosed
    Oct 31, 2022 · 120 BLOOR ST E
  • Building permit22 197546Closed

    Interior alterations to return to back to base

    Sep 28, 2022 · 120 BLOOR ST E
  • Building permit22 178829Closed

    Proposal for interior alterations to return the existing office on the 2nd floor level to base building condition.

    Aug 22, 2022 · 120 BLOOR ST E
  • Building permit19 152584Closed

    To erect and display two static wall signs one illuminated and one non-illuminated.**MAD RADISH**

    Mar 1, 2022 · 120 BLOOR ST E
  • Building permit21 182013Closed

    Proposal for interior alterations to an existing office unit 600 on the 6th floor level - 'Invesco Canada' (272m2).

    Jul 26, 2021 · 120 BLOOR ST E
  • Building permit19 119838Closed

    To erect and display two illuminated wall signs displaying static copy on the first storey of the southerly elevation, each measuring 1.96 m by 2.06 m at height of 7.63 m. **ROSEDALE WELLNESS CENTRE**

    Apr 3, 2019 · 120 BLOOR ST E
  • Building permit19 134251Cancelled

    The applicant has proposed to install one illuminated ground sign, displaying static copy, located on the south frontage (Bloor St. E.). The proposed sign contains four sign faces, each sign face measuring 3.05 metres vertically by 0.91 metres horizontally at a height of 3.35 metres.**IBM**

    Apr 2, 2019 · 120 BLOOR ST E
  • Building permit19 126646Closed

    interior alterations to existing restaurant UNIT 103 "Mad Radish"

    Mar 29, 2019 · 120 BLOOR ST E
  • Building permit19 109600Closed

    Proposed interior alterations to existing medical office - unit 100B

    Feb 12, 2019 · 120 BLOOR ST E
  • Zoning review17 239173 LPRClosed
    Sep 26, 2017 · 120 BLOOR ST E
  • Building permit17 166801Closed

    In conjunction with a multi-storey building on the premises, proposal to erect and display two illuminated wall signs, both displaying static copy located on the first storey south elevation. The proposed signs are 1.88 metres vertically by 1.65 metres horizontally at a height of 4.32 metres above grade.**PICNIC**

    Jun 6, 2017 · 120 BLOOR ST E
  • Zoning review17 155629 ZPRClosed
    May 7, 2017 · 120 BLOOR ST E
  • Building permit17 143667Closed

    Proposal for interior alterations to existing office space on the 4th floor - "BMO Financial Group"

    May 1, 2017 · 120 BLOOR ST E
  • Building permit17 107663Closed

    Interior renovation to existing retail space to modify interior fit-out to suit fast food retailer.

    Feb 7, 2017 · 120 BLOOR ST E
  • Building permit16 253768Closed

    Proposal for interior alterations to create 2 new storage rooms in basement of existing multiple use building.

    Dec 6, 2016 · 120 BLOOR ST E
  • Building permit16 185748Closed

    Proposal to construct a new door and partition for a computer service room on the 7th floor of the existing office building.

    Jul 26, 2016 · 120 BLOOR ST E
  • Building permit16 153099Closed

    Proposal for interior alterations to the 3rd floor of the existing office building. Scope of work includes demo and construction of partitions and associated HVAC and Plumbing.

    Jun 8, 2016 · 120 BLOOR ST E
  • Building permit14 268812Inspection

    Proposal to expand the existing dental office in unit B100 in the basement of the existing office buidling, and to establish a massage establishment. Space to be occupied is currently being used for storage purposes. -TSChanged from:Proposal to expand the existing Medical/Dental Office in unit B100 in the basement of the existing Office buidling.

    Apr 22, 2015 · 120 BLOOR ST E
  • Building permit15 127106Closed

    Proposal for interior alterations to existing office space on the third floor for - BMO Financial.

    Mar 25, 2015 · 120 BLOOR ST E
  • Zoning review15 127098 LPRClosed
    Mar 13, 2015 · 120 BLOOR ST E
  • Building permit14 216827Closed

    To erect and display one illuminated wall sign with static copy, in conjunction with a banking business located on the premises. **BMO**

    Sep 17, 2014 · 120 BLOOR ST E
  • Building permit14 190478Closed

    Proposal for interior alterations to existing office space on the 7th floor - Invesco

    Aug 13, 2014 · 120 BLOOR ST E
  • Building permit14 166371Closed

    To complete interior alterations to the ground floor of the existing office building for tenant fit up for Bank of Montreal.

    Aug 12, 2014 · 120 BLOOR ST E
  • Building permit14 180443Permit Issued

    Proposal for interior alterations to the ground floor of existing office - "BMO"

    Aug 1, 2014 · 120 BLOOR ST E
  • Building permit14 117137Closed

    Proposal for interior alterations on the second floor for "BMO Financial Group"

    Feb 28, 2014 · 120 BLOOR ST E
  • Building permit14 104369Closed

    Proposed construction of new door in basement corridor (5m2)

    Jan 28, 2014 · 120 BLOOR ST E
  • Building permit13 233535Closed

    To erect and display two illuminated wall signs on the southerly elevation of first storey, in conjunction with a health centre. **Rosedale Wellness Centre** **Dawson Dental Centre**

    Oct 4, 2013 · 120 BLOOR ST E
  • Building permit13 145511Inspection

    Proposal for interior alterations to construct new stairs between ground floor and basement in existing multi use, commercial building.

    Apr 22, 2013 · 120 BLOOR ST E
  • Building permit13 129129Inspection

    Proposal for interior alterations for new medical office in parts of the upper basement and ground floor of existing office building (See also Permit # 13 145511 BLD 00 BA for constuction of interior convenience stair connecting the ground and upper basement floors)

    Apr 22, 2013 · 120 BLOOR ST E
  • Building permit12 208725Closed

    Proposal to install new fixtures in an existing ground floor retail unit. Existing use is a convenience store/news shop and a new icecream machine is being added (with subsequent fixtures).

    Jul 12, 2012 · 120 BLOOR ST E
  • Building permit11 258497Closed

    permit to install one maglock on floor 7 of existing office building.

    Aug 24, 2011 · 120 BLOOR ST E
  • Building permit11 217723Closed

    Proposed interior alteratins to 7th floor office space. Tenant is Invesco Trimark.

    Jun 16, 2011 · 120 BLOOR ST E
  • Zoning review11 162273 ZPRClosed
    Mar 31, 2011 · 120 BLOOR ST E
  • Building permit10 293979Closed

    To erect and display three wall signs along the southerly first storey building wall in conjunction with a new restaurant to be located on the premises. **Sunset Grill**

    Dec 14, 2010 · 120 BLOOR ST E
  • Building permit10 272866Closed

    permit for interior alterations to existing office space - BMO - Floors 2, 4 and 5 - Small areas on floors.

    Nov 3, 2010 · 120 BLOOR ST E
  • Building permit10 282107Closed

    Make interior alterations on portion of ground floor, existing restaurant space for new tenant. (60 seats) "Sunset Grill"

    Oct 25, 2010 · 120 BLOOR ST E
  • Building permit10 235900Closed

    interior alterations to existing office space - ground floor - IBM Canada

    Aug 25, 2010 · 120 BLOOR ST E
  • Zoning review10 120528 ZPRClosed
    Feb 19, 2010 · 120 BLOOR ST E
  • Building permit09 189448Closed

    Interior alterations and interior demolition to remove partition walls, cap ductwork and plumbing in the basement level of this building.

    Dec 1, 2009 · 120 BLOOR ST E
  • Building permit09 153323Closed

    interior alterations to existing office space - floors 6 and 7 - Invesco Trimark

    Aug 11, 2009 · 120 BLOOR ST E
  • Building permit08 144127Closed

    permit for 1 maglock on 7th floor of existing office space

    Apr 18, 2008 · 120 BLOOR ST E
  • Building permit08 111361Closed

    Interior alterations to existing office space on the 7th floor.

    Feb 19, 2008 · 120 BLOOR ST E
  • Building permit06 133803Closed

    Relocate 1 mag lock on 7th floor office.

    May 24, 2006 · 120 BLOOR ST E
  • Building permit06 133801Closed

    Interior alterations to 7th floor. Relocating door.

    May 18, 2006 · 120 BLOOR ST E
  • Zoning review06 135374 LTOClosed
    May 15, 2006 · 120 BLOOR ST E
  • Building permit06 130296Closed

    Interior alterations to an existing office space on the 4th floor

    May 15, 2006 · 120 BLOOR ST E
  • Building permit05 123168Closed

    Interior alterations to an existing office space on the 2nd floor

    Apr 14, 2005 · 120 BLOOR ST E
  • Building permit05 109527Closed

    make interior alterations to 1st floor room 960 tenant: ibm

    Feb 17, 2005 · 120 BLOOR ST E
  • Building permit02 152428Closed

    Install partitions on portion of the 6th floor. Tenant: Aims Funds Mgmt. Fast track

    Jul 22, 2002 · 120 BLOOR ST E
  • Building permit01 107426Closed

    Install fixtures on the 7th floor office: 1 kitchen sink, 1 2-compt. sink Tenant: Aim Fund Mgmt. Inc. cost incl. 01 - 107421

    Mar 19, 2002 · 120 BLOOR ST E
  • Building permit01 107423Closed

    Alter existing h.v.a.c. system on portions of the 6th & 7th floors. Tenant: Aim Fund Mgmt. Inc. cost incl. 01 - 107421

    Mar 19, 2002 · 120 BLOOR ST E
  • Building permit01 107421Closed

    Install partitions on portions of the 6th & 7th floor. Tenant: Aim Fund Mgmt. Inc.fastrack

    Jan 24, 2002 · 120 BLOOR ST E
  • Building permit01 116172Closed

    Alter HVAC system Cost included in bp 01-116151

    Jul 17, 2001 · 120 BLOOR ST E
  • Building permit01 116164Closed

    1-1 compartment sink, 1-2 compartment sink, 1 dishwasher on 6th floor 2-1 compartment sinks, 1-2 compartment sink on 7th floor Cost included in bp 01-116151

    Jun 28, 2001 · 120 BLOOR ST E
  • Building permit01 141631Closed

    Alter existing h.v.a.c. system on portion of the ground floor. Tenant: I.B.M. cost incl. 01 - 141627

    Jun 12, 2001 · 120 BLOOR ST E
  • Building permit01 141627Closed

    Install partitions on portion of the ground floor. Tenant: I.B.M.

    May 31, 2001 · 120 BLOOR ST E
  • Building permit01 116151Closed

    Interior alterations (partitions) to entire 6th and 7th floors

    May 29, 2001 · 120 BLOOR ST E
  • Building permit01 132986Closed

    4 maglocks on 6th and 7th floors( 1 on 6th and 3 on 7th )

    May 3, 2001 · 120 BLOOR ST E
  • Building permit01 115900Closed

    Make interior alterations on main floor for new retail store. Tenant: International News(CRU #104) (old w.23/new 27) Note: sign not in this permit.

    Mar 9, 2001 · 120 BLOOR ST E
  • Zoning review01 012314 LTOClosed
    Mar 6, 2001 · 120 BLOOR ST E
  • Building permit01 111514Closed

    interior alterations - install partitions on B1 level tenant: bank of montreal

    Feb 26, 2001 · 120 BLOOR ST E
  • Building permit01 113041Closed

    Install electro-magnetic locking devices (2) on the 7th floor.

    Feb 23, 2001 · 120 BLOOR ST E
  • Zoning review01 035467 ZSVClosed
    Feb 1, 2001 · 120 BLOOR ST E
  • Zoning review01 105361 000Closed
    Jan 24, 2001 · 120 BLOOR ST E
  • Building permit01 103995Closed

    Install fixtures: 1st floor: 2 w.c., 2 w.b., 1 hand sink, 1 bar sink, 2 kitchen sinks, 1 2-compt. sink, 1 dishwasher, 1 mop sink, 1 h.w.t., 2 v.f.d., 1 grease interceptor cost incl. 00 - 354946

    Jan 23, 2001 · 120 BLOOR ST E
  • Building permit01 100885Closed

    Alter existing h.v.a.c. system and install 2 additional air conditioning units on portion of the 7th floor office (computer room). Tenant: Aim Funds Mgmt. Ltd.

    Jan 18, 2001 · 120 BLOOR ST E
  • Zoning review01 102684 000Closed
    Jan 12, 2001 · 120 BLOOR ST E
  • Building permit01 101027Closed

    Install fixtures on 7th floor: 2 v.f.d. Tenant: Aim Funds Mgmt. Ltd. cost incl. 01 - 100878

    Jan 11, 2001 · 120 BLOOR ST E
  • Building permit01 100878Closed

    Install partitions on portion of the 7th floor office. Tenant: Aim Funds Mgmt. Ltd.

    Jan 10, 2001 · 120 BLOOR ST E
  • Zoning review01 012009 LTOClosed
    Jan 3, 2001 · 120 BLOOR ST E
  • Building permit00 354946Closed

    Interior alterations for restaurant use. HOLD FOR HEALTH DEPT APPROVAL Tenant: Ichiriki

    Dec 20, 2000 · 120 BLOOR ST E
  • Building permit00 340721Closed

    Install fix. ground floor : 2 kit. sink, 2 dishwashers -cost incl. under file #00-340708 tenant: ibm canada ltd.

    Nov 14, 2000 · 120 BLOOR ST E
  • Building permit00 342219Closed

    alter existing h.v.a.c. system on portions of the ground floor office.--cost incl. under file #00-340708 Tenant: ibm canada ltd.

    Oct 13, 2000 · 120 BLOOR ST E
  • Building permit00 340708Closed

    Install partitions on portions of the ground floor office. Tenant: ibm canada ltd.

    Oct 10, 2000 · 120 BLOOR ST E
  • Zoning review00 013011 LTOClosed
    Sep 27, 2000 · 120 BLOOR ST E
  • Building permit00 167942Closed

    supply and install h.v.a.c system on portion of 1st floor. 'CoCoBerrys Cafe'

    Sep 25, 2000 · 120 BLOOR ST E
  • Building permit00 170907Closed

    Alter existing h.v.a.c. system on the 3rd and 4th floor office. cost incl. 00 - 161159 and 00 - 164451

    Sep 22, 2000 · 120 BLOOR ST E
  • Building permit00 167933Closed

    make interior alterations to portion of 1st floor for restaurant. ( 50 Seats) hold for health dept. approval 'CoCoBerrys Cafe'

    Sep 7, 2000 · 120 BLOOR ST E
  • Building permit00 175541Closed

    install hvac ductwork and diffusers on all of 6th & 7th floors for office purposes. Tenant: Aims Funds Management. (w23) cost included in bp00175533 For plans see p. 175533.

    Aug 23, 2000 · 120 BLOOR ST E
  • Building permit00 174223Closed

    alter h.v.a.c o n5th floor. see bp# 168019 tenant: Bank Of Montreal

    Aug 22, 2000 · 120 BLOOR ST E
  • Building permit00 174225Closed

    install fixtures on 5th floor- 2 k.s., 2 h.w.t. see bp# 00-168019 tenant: Bank Of Montreal

    Aug 4, 2000 · 120 BLOOR ST E
  • Building permit00 324831Closed

    Install 2 Mag Locks for single tenany 3rd Floor

    Aug 3, 2000 · 120 BLOOR ST E
  • Building permit00 324818Closed

    Install 8 Mag Locks for single tenany 6th Floor

    Aug 3, 2000 · 120 BLOOR ST E
  • Building permit00 175545Closed

    install fixtures - 1 kitchen sink with hot water tank, 1-2 comp. kit.sink with hot water tank on all of 6th & 7th floors for office purposes. Tenant: Aims Funds Management. (w23) cost included in bp00175533

    Aug 1, 2000 · 120 BLOOR ST E
  • Building permit00 175533Closed

    install partitions on all of 6th & 7th floors for office purposes. Tenant: Aims Funds Management. (w23)

    Jul 31, 2000 · 120 BLOOR ST E
  • Building permit00 170985Closed

    Install partitions on portions of the 2nd floor office. Tenant: Bank of Montreal

    Jul 17, 2000 · 120 BLOOR ST E
  • Building permit00 170896Closed

    Install fixtures: 2nd fl: 1 kitchen sink, 1 h.w.t.; 3rd & 4th fl.: (each floor): 2 kitchen sinks, 2 h.w.t. cost incl. 00 - 161159 and 00 - 164451

    Jul 12, 2000 · 120 BLOOR ST E
  • Building permit00 168019Closed

    install partitions on 5th floor. tenant: Bank Of Montreal

    Jul 6, 2000 · 120 BLOOR ST E
  • Building permit00 164451Closed

    INSTALL PARTITIONS ON 4TH FLOOR. TENANT: BANK OF MONTREAL EXISTING- OFFICE BUILDING PROPOSED- SAME

    Jun 26, 2000 · 120 BLOOR ST E
  • Building permit00 161170Closed

    INSTALL PARTITIONS ON PORTION OF LEVEL P1 TENANT: BANK OF MONTREAL EXISTING- OFFICE BUILINDG PROPOSED- SAME

    Jun 19, 2000 · 120 BLOOR ST E
  • Building permit00 161159Closed

    INSTALL PARTITIONS ON PORTION OF 3RD FLOOR. TENANT: BANK OF MONTREAL EXISTING- OFFICE BUILINDG PROPOSED- SAME

    Jun 19, 2000 · 120 BLOOR ST E
  • Building permit99 020783Closed

    INSTALL 24 MAG-LOCK 6TH 7TH AND BASEMENT FLOOR LEVELS TENANT: AIM FUNDS MANAGEMENT INC JNB

    Sep 13, 1999 · 120 BLOOR ST E
  • Building permit99 020033Closed

    RELOCATION OF DUCTS AND DIFFUSERS ON 6TH, 7TH AND PORTION OF BASEMENT REFER TO APPLICATION NUMBER: 429244

    Aug 19, 1999 · 120 BLOOR ST E
  • Building permit99 020032Closed

    ERECT PARTITIONS ON 6TH, 7TH AND PORTION OF BASEMENT FOR OFFICE PURPOSES TENANT: AIM FUNDS JNB

    Aug 17, 1999 · 120 BLOOR ST E
  • Building permit98 025070Closed

    SUPPLY AND INSTALL SPRINKLER SHOP DRAWINGS IN REGARDS TO APPLI. # 417106 JNB

    Mar 10, 1999 · 120 BLOOR ST E
  • Building permit98 021795Closed

    NEW DUCTWORK, V.A.V. BOXES, DIFFUSERS, CONTROLS FOR OFFICE FLOORS, REPLACEMENT OF SOME AIR HANDLEING UNIT COILS, NEW STEAM BOILER FOR HUMIDIFACATION, NEW DIESEL GENERATOR VENTILATION & COOLING. SEE BP# 417106

    Jan 18, 1999 · 120 BLOOR ST E
  • Building permit98 021504Closed

    MAKE INTERIOR UPGRADES TO WHOLE BUILDING & CONSTRUCT AN ENTRANCE CANOPY ON THE SOUTH ELEVATION & UNDER PERMIT APPL. #420682 INSTALL A NEW SPRINKLER SYSTEM. COST OF H.V.A.C. & SPRINKLERS INCLUDED. (W23)/SP

    Jan 18, 1999 · 120 BLOOR ST E
  • Building permit98 016509Closed

    MAKE PARKING GARAGE REPAIRS. 2322.M\2 BP

    May 15, 1998 · 120 BLOOR ST E
  • Zoning review93 024754 LTOClosed
    Feb 16, 1993 · 120 BLOOR ST E

Check before you build

  • Site-specific exception 900.11.10(2480)

    Needs a closer look

    3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2480)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite regulation 40.10.20.100 (2), a Nightclub is not a permitted use. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 208 of former City of Toronto By-law 438-86

  3. Rule C

    On the even numbered addresses of 120-160 Bloor St. E., former City of Toronto by-laws 853-79, 317-80, and 657-89

  4. Older by-law A

    Despite regulation 40.10.20.100 (2), a Nightclub is not a permitted use. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86

  5. Older by-law B

    Section 12(2) 208 of former City of Toronto By-law 438-86

  6. Older by-law C

    On the even numbered addresses of 120-160 Bloor St. E., former City of Toronto by-laws 853-79, 317-80, and 657-89

4 parts for other addresses
  • D On the even numbered addresses of 278-278R Bloor St. E., former City of Toronto by-laws 787-79 and 881-79
  • E On 300 Bloor St. E., City of Toronto by-law 590-90.
  • D On the even numbered addresses of 278-278R Bloor St. E., former City of Toronto by-laws 787-79 and 881-79
  • E On 300 Bloor St. E., City of Toronto by-law 590-90.
By-law 569-2013, Chapter 900

Lot facts

Area
7,050 m²
Frontage
71.5 m
Depth
99.7 m
Street
Bloor St E
Corner lot
Yes, also on Park Rd99.7 m along it
Public lane
None
House footprint
3,485 m²roof up to 44.9 m
Back yard
40.3 mhouse to rear lot line
Side yards
0.2 m and 1.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
3house, garage, sheds
Max height
61 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 211, 225. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Bloor Street East, Church Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 6.0 (c4.5; r6.0) SS1 (x2480) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 22 City trees in front of this lot. The City's street tree inventory lists 22 trees at this address: ginkgo (14 cm), honey locust (14 cm), ginkgo (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
81%13 of 16 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
26

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.

    235 BLOOR ST E · Nov 4, 2026 · 244 m away
  • Minor varianceApproved

    To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.

    1235 BAY ST · Oct 14, 2026 · 466 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.

    874 YONGE ST · Aug 5, 2026 · 344 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.

    27-29 YORKVILLE AVE · Jul 15, 2026 · 397 m away
  • Minor varianceApproved

    To alter the development standards for the 50-storey residential building (approved under Site Specific Zoning By-Law 697-2021(OLT)), by increasing the permitted gross floor area, and the permitted encroachment of cladding and other similar façade treatments into the required minimum building setbacks.

    874 YONGE ST · May 28, 2025 · 344 m away

Latest activity nearby

  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies.

    40 ASQUITH AVE · Nov 20, 2026 · 116 m away
  • Building permit

    Proposed interior alterations to an existing office

    2 BLOOR ST E · Nov 18, 2026 · 155 m away
  • Building permit

    Proposal for interior alterations to an existing office.

    2 BLOOR ST E · Nov 17, 2026 · 155 m away
  • Building permit

    Proposal for interior alterations to an existing office space

    121 BLOOR ST E · Nov 10, 2026 · 101 m away
  • Building permit

    Proposal to install one (1) maglock.

    717 CHURCH ST · Nov 6, 2026 · 161 m away
  • Minor varianceRefused

    To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.

    235 BLOOR ST E · Nov 4, 2026 · 244 m away
  • Building permitsecondary suite

    Proposed interior alterations to create a second suite.HERITAGE REQUIRED

    123 COLLIER ST · Oct 30, 2026 · 116 m away
  • Building permit

    Proposal for interior structural alterations to create openings in the level 2 slab for new stair and elevator.

    820 YONGE ST · Oct 28, 2026 · 286 m away
  • Building permit

    Proposed interior alterations to existing office - Suite 2700

    2 BLOOR ST W · Oct 26, 2026 · 292 m away
  • Building permit

    Proposal to install two (2) electromagnetic door locks at elevator lobby.

    2 BLOOR ST E · Oct 20, 2026 · 155 m away

Neighbourhood: Rosedale-Moore Park

About the area around the lot, not the lot itself.

Nearest station
Yonge Station4 min walk
Nearest TTC stop
Bloor St East at Church St1 min walk
Nearest cycling route
Bloor St ECycle Track, 1 min walk
Nearest traffic count
2,815 vehicles in 8 hPark Rd / Asquith Ave / Asquith Green Park Trl, 70 m away, Nov 15, 2018
Serious collisions within 500 m
92021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 4 with cyclists
Parks
Asquith Green Park1 min walk
Milner Parkette1 min walk
Rosedale Ravine Lands2 min walk

Schools within 1 km

  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 3 min walk
  • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 8 min walk
  • THE ABELARD CENTRE FOR EDUCATION Private 8 min walk
  • BRANKSOME HALL GIRLS SCHOOL Private 8 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 9 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRosedale-Moore ParkMedian neighbourhood
Median household income (2020)$122,000$84,500
Households that own their home58%54%
Population (2021)20,08016,813
Homes built in 1960 or before46%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRosedale-Moore ParkCity median
Assault1080.4636.3
Robbery86.869.5
Auto theft199.6192.6
Theft over $5,00065.146.1
Break and enter455.6172.8
Theft from vehicles182.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.