HousePrecheckCheck an address

12 Queen Magdalene PlToronto · zoning, lot size and permit records

15.2 × 40.7 m613 m²on Queen Magdalene Pl

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelStill open in the City's records: 16 238658 (Construct new two storey SFD-Detached (378.26m2) - Model "Borden" - Elevation "A"Rev 02..., 2020, status Revision Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N10 m
15.2 m frontage40.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2020

    Needs a closer look

    Still open in the City's records: 16 238658 (Construct new two storey SFD-Detached (378.26m2) - Model "Borden" - Elevation "A"Rev 02..., 2020, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Building permit16 238658Revision Issuednew building, new house

    Construct new two storey SFD-Detached (378.26m2) - Model "Borden" - Elevation "A"Rev 02: changes as per drawings

    Jul 10, 2020 · 12 QUEEN MAGDALENE PL
  • Development application13 120931 NNY 24 OZClosed

    22 lots consisting of 2-storey single family dwellings. Prelim Report deferred by Councillor (May 2013)

    Feb 15, 2013 · 12 QUEEN MAGDALENE PL

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
613 m²
Frontage
15.2 m
Depth
40.7 m
Street
Queen Magdalene Pl
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%5 of 5 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    3
    Development applications
    0

    Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new detached dwelling with an integral garage and front porch. Please note, this application was previously deferred by the Committee of Adjustment on January 22, 2026.

      18 RESOLUTION CRES · Mar 5, 2026 · 249 m away
    • Minor varianceApproved

      To construct a new accessory structure (pool enclosure) in the rear yard of the subject property.

      24 BRADENTON DR · May 25, 2023 · 326 m away
    • Minor varianceApproved

      To construct a new dwelling.

      23 CRESTHAVEN DR · Sep 2, 2021 · 200 m away
    • Minor varianceApproved

      To construct a one-storey rear addition.

      154 MCNICOLL AVE · Jul 16, 2020 · 154 m away
    • Minor varianceApproved

      To convert the existing carport into a garage.

      16 A RESOLUTION CRES · May 31, 2018 · 218 m away

    Latest activity nearby

    • Minor variancePending

      To legalize and maintain the existng front yard deck.

      2 QUEEN MAGDALENE PL · Nov 3, 2026 · 70 m away
    • Zoning review

      Closed

      16 A RESOLUTION CRES · Apr 20, 2026 · 218 m away
    • Minor varianceApproved

      To construct a new detached dwelling with an integral garage and front porch. Please note, this application was previously deferred by the Committee of Adjustment on January 22, 2026.

      18 RESOLUTION CRES · Mar 5, 2026 · 249 m away
    • Building permitmultiplex

      Proposal for interior alterations to convert existing Single Family Dwelling to Triplex.

      150 MCNICOLL AVE · Jan 12, 2026 · 136 m away
    • Zoning review

      Closed

      18 RESOLUTION CRES · Oct 3, 2025 · 249 m away
    • Building permit

      Proposal for interior alterations to the basement of an existing 1 storey SFD-detached dwelling.

      24 RESOLUTION CRES · Aug 28, 2025 · 293 m away
    • Building permitmultiplex

      Proposal to convert single family dwelling into a triplex.

      150 MCNICOLL AVE · Aug 27, 2025 · 136 m away
    • Building permit

      Proposla to demolish existing boilers and install new boilers c/w piping, ductwork, and accessories in an existing secondary school.

      155 MCNICOLL AVE · Jun 3, 2025 · 145 m away
    • Building permit

      REV 01:Construction of a Barrier Free Washroom instead of a Universal Washroom.Proposal for interior alterations to the washroom in an existing elementary school.

      155 MCNICOLL AVE · May 9, 2025 · 145 m away
    • Building permit

      Proposal to install a backflow prevention device in an existing elementary school - McNicoll Avenue School

      155 MCNICOLL AVE · Apr 8, 2025 · 145 m away

    Neighbourhood: Hillcrest Village

    About the area around the lot, not the lot itself.

    Nearest station
    Old Cummer GO Station21 min walk
    Nearest TTC stop
    McNicoll Ave at Brahms Ave2 min walk
    Nearest cycling route
    Brahms AveSharrows, 1 min walk
    Nearest traffic count
    10,308 vehicles in 8 hDon Mills Rd / Premier Davis Blvd, 420 m away, Feb 28, 2023
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Clara Will Park1 min walk
    Cresthaven Park3 min walk
    Gideon Parkette4 min walk

    Schools within 1 km

    • MCNICOLL AVENUE SCHOOL BLDG English Public 2 min walk
    • CRESTHAVEN PUBLIC SCHOOL English Public 5 min walk
    • HILLMOUNT PUBLIC SCHOOL English Public 12 min walk
    • CLIFFWOOD PUBLIC SCHOOL English Public 14 min walk
    • SENECA COLLEGE (NEWNHAM CAMPUS) College 15 min walk
    • ZION HEIGHTS JR HIGH SCHOOL English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHillcrest VillageMedian neighbourhood
    Median household income (2020)$86,000$84,500
    Households that own their home72%54%
    Population (2021)16,34516,813
    Homes built in 1960 or before7%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHillcrest VillageCity median
    Assault467.3636.3
    Robbery166.969.5
    Shootings5.610.5
    Auto theft116.8192.6
    Theft over $5,00083.446.1
    Break and enter200.3172.8
    Theft from vehicles172.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.