HousePrecheckCheck an address

12 Goldfinch CrtToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (f30.0; a1375; d1.5) (x139)≈ 214.7 × 107.2 m12,568 m²on Goldfinch Crt

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 12 storeys, 143 rental units, built 1969More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 20 142318 (Construction of a above ground shelter system for an underground garage ramp, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 open by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 258180 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 233200 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 96 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 214.7 m frontage≈ 107.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (25% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (19% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 2 open by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 258180 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 233200 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 building permits open, the oldest since 2009

    Needs a closer look

    Still open in the City's records: 14 150870 (brick and concrete repairs to balconies, 2014, status Permit Issued); 09 162692 (Convert salon and office into two new apt units - unit 105 and 106, 2009, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (34% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 37 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 258192 PRS 00 IR (Property Standards, 2026); 26 231975 PRS 00 IR (Property Standards, 2026); 26 222742 PRS 00 IR (Property Standards, 2026); and 34 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 20 142318 (Construction of a above ground shelter system for an underground garage ramp, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • Rental building evaluation: 96 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (12 storeys, 143 units, built 1969).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

59 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 258192 PRS 00 IRClosed

    Property Standards

    Oct 21, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 258180 PRS 00 IRRescheduled

    Property Standards

    Oct 21, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 233200 PRS 00 IRRescheduled

    Property Standards

    Sep 6, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 231975 PRS 00 IRClosed

    Property Standards

    Sep 3, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 222742 PRS 00 IRClosed

    Property Standards

    Aug 19, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 203958 PRS 00 IRClosed

    Property Standards

    Jul 17, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 194364 WST 00 IRClosed

    Waste

    Jun 30, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 188794 PRS 00 IRClosed

    Property Standards

    Jun 22, 2026 · 12 GOLDFINCH CRT
Show 51 older records
  • By-law investigation26 173371 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 173370 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 123653 PRS 00 IRClosed

    Property Standards

    Mar 2, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 115131 HEA 00 IRClosed

    Adequate Heat

    Feb 9, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 120837 WST 00 IVClosed

    Notice Issued Waste

    Jan 8, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 102181 WST 00 IRClosed

    Waste

    Jan 8, 2026 · 12 GOLDFINCH CRT
  • By-law investigation26 100597 PRS 00 IRClosed

    Property Standards

    Jan 4, 2026 · 12 GOLDFINCH CRT
  • By-law investigation25 270087 PRS 00 IRClosed

    Property Standards

    Dec 28, 2025 · 12 GOLDFINCH CRT
  • By-law investigation26 114217 PRS 00 IVClosed

    Order Issued Property Standards: Adequate ventilation has not been provided.; Interior door is not a good fit in its frame.; The supplied facility in or on the property is not constructed, installed and/or maintained so that it will function safely and effectively.; The ventilation system or unit is not kept in good repair and maintained in good working condition at all times.; Vanity is not maintained in a satisfactory condition.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.

    Dec 16, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 267043 PRS 00 IRClosed

    Property Standards

    Dec 16, 2025 · 12 GOLDFINCH CRT
  • By-law investigation26 104393 PRS 00 IVClosed

    Order Issued Property Standards: Floor and/or floor covering not kept free from holes, stains, rubbish and debris.; Interior door(s), frames(s), glass pane(s), and/or hardware not maintained in good repair.; The supplied facility in or on the property is not constructed, installed and/or maintained so that it will function safely and effectively.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.

    Dec 15, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 266444 PRS 00 IRClosed

    Property Standards

    Dec 15, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 270352 PRS 00 IVClosed

    Order Issued Property Standards: Exterior door missing.

    Dec 2, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 261451 PRS 00 IRClosed

    Property Standards

    Dec 2, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 261385 PRS 00 IRClosed

    Property Standards

    Dec 2, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 261376 PRS 00 IRClosed

    Property Standards

    Dec 2, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 259228 PRS 00 IRClosed

    Property Standards

    Nov 27, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 256081 PRS 00 IRClosed

    Property Standards

    Nov 19, 2025 · 12 GOLDFINCH CRT
  • Building permit20 142318Permit Issued

    Construction of a above ground shelter system for an underground garage ramp.

    Nov 14, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 250299 PRS 00 IVClosed

    Order Issued Property Standards: The ventilation system or unit is not kept in good repair and maintained in good working condition at all times.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.

    Oct 28, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 246064 PRS 00 IRClosed

    Property Standards

    Oct 28, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 237003 PRS 00 IRClosed

    Property Standards

    Oct 8, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 218021 PRS 00 IVClosed

    Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.; The supplied facility in or on the property is not constructed, installed and/or maintained so that it will function safely and effectively.

    Aug 29, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 217947 PRS 00 IRClosed

    Property Standards

    Aug 29, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 217141 PRS 00 IVClosed

    Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.; The supplied facility in or on the property is not kept in a satisfactory working condition.

    Aug 4, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 204768 PRS 00 IRClosed

    Property Standards

    Aug 4, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 199205 WST 00 IRClosed

    Waste

    Jul 24, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 216146 PRS 00 IVClosed

    Order Issued Property Standards: The supplied appliance(s) is not maintained in good repair and good working order. Namely:

    Jul 22, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 198147 PRS 00 IRClosed

    Property Standards

    Jul 22, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 196558 PRS 00 IRClosed

    Property Standards

    Jul 19, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 198963 PRS 00 IVClosed

    Order Issued Property Standards: Area where equipment or utensils are intended to be cleaned is not equipped to provide illumination to a level of not less than 500 lux measured at the floor le; Area where food is intended to be processed, prepared or manufactured is not equipped to provide illumination to a level of not less than 500 lux measured at th; Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.; Ch. 629- LIGHTING(Interior-Bldgs more than 3 storeys or 600 sq m); Corridor serving classrooms is not equipped to provide illumination to an average level of not less than 50 lux at all points such as angles and intersections a; Corridor serving classrooms is not equipped to provide illumination to an average level of not less than 50 lux at floor or tread level.; Corridor serving patients or residents is not equipped to provide illumination to an average level of not less than 50 lux at all points such as angles and inte; Corridor serving patients or residents is not equipped to provide illumination to an average level of not less than 50 lux at floor or tread level.; Electrical equipment room is not equipped to provide illumination to an average level of not less than 50 lux at floor or tread level.; Elevator machine room is not equipped to provide illumination to an average level of not less than 100 lux at floor level.; Emergency lighting in a service space in which facilities are included to permit a person to enter and to undertake maintenance and other operations is not prov; Emergency lighting in corridors serving classrooms provided at less than an average of 10 lux at floor or tread level..; Emergency lighting in floor area or part of floor area in day care centres where persons are cared for provided at less than an average of 10 lux at floor or tr; Emergency lighting in floor area or part of floor area where the public may congregate in assembly occupancies intended for the production and viewing of the pe; Emergency lighting in food preparation areas in commercial kitchens provided at less than an average of 10 lux at floor or tread level.; Emergency lighting in internal corridor or aisle serving as principal routes to exits in a business and personal services occupancy, a mercantile occupancy or a; Emergency lighting in principal route providing access to exit in a floor area that is not subdivided into rooms or suites of rooms served by corridors in a bus; Emergency lighting in principal routes providing access to exit in a service room of building provided at less than an average of 10 lux at floor or tread level; Emergency lighting in public corridor of building provided at less than an average of 10 lux at floor or tread level..; Emergency lighting in underground walkway of building provided at less than an average of 10 lux at floor or tread level..; Emergency lighting is not provided in a service space in which facilities are included to permit a person to enter and to undertake maintenance and other operat; Emergency lighting is not provided on a shelf and rack storage system, which includes walkways, platforms, unenclosed egress stairs and exits providing means of; Emergency lighting on a shelf and rack storage system, which includes walkways, platforms, unenclosed egress stairs and exits providing means of egress is not p; Exit, public corridor or corridor is not equipped to provide illumination to an average level of not less than 50 lux at all points such as angles and intersect; Exit, public corridor or corridor is not equipped to provide illumination to an average level of not less than 50 lux at floor or tread level.; Hoistway pit is not equipped to provide illumination to an average level of not less than 50 lux at floor or tread level.; Incandescent lighting in a camp for housing of workers hallway, corridor, stairwway or sleeping area is provided at less than 10 watts per m² of floor area. Na; Incandescent lighting in a camp for housing of workers kitchen is provided at less than 50 watts per m² of floor area.; Incandescent lighting in a camp for housing of workers room is provided at less than 25 watts per m² of floor area. Namely;; Incandescent lighting in a garage is provided at less than 5 watts per m² of floor area.; Incandescent lighting in a laundry room is provided at less than 20 watts per m² of floor area.; Incandescent lighting in a public water closet room is provided at less than 10 watts per m² of floor area.; Incandescent lighting in a recreational camp hallway, corridor, stairwway or sleeping area is provided at less than 10 watts per m² of floor area. Namely;; Incandescent lighting in a recreational camp kitchen is provided at less than 50 watts per m² of floor area.; Incandescent lighting in a recreational camp room is provided at less than 25 watts per m² of floor area. Namely;; Incandescent lighting in a recreation room is provided at less than 10 watts per m² of floor area.; Incandescent lighting in a service hallway is provided at less than 5 watts per m² of floor area.; Incandescent lighting in a service room is provided at less than 20 watts per m² of floor area.; Incandescent lighting in a service stairway is provided at less than 5 watts per m² of floor area.; Incandescent lighting in a storage room is provided at less than 5 watts per m² of floor area.; Interior lighting fixtures or lamps are not maintained.; Lighting in a camp for housing of workers hallway, corridor, stairwway or sleeping area is provided at less than 100 lux. Namely;; Lighting in a camp for housing of workers kitchen is provided at less than 500 lux.; Lighting in a camp for housing of workers room is provided at less than 250 lux. Namely;; Lighting in a garage is provided at less than 50 lux.; Lighting in a laundry room is provided at less than 200 lux.; Lighting in a public water closet room is provided at less than 100 lux.; Lighting in a recreational camp hallway, corridor, stairwway or sleeping area is provided at less than 100 lux. Namely;; Lighting in a recreational camp kitchen is provided at less than 500 lux.; Lighting in a recreational camp room is provided at less than 250 lux. Namely;; Lighting in a recreation room is provided at less than 100 lux.; Lighting in a service hallway is provided at less than 50 lux.; Lighting in a service room is provided at less than 200 lux.; Lighting in a service stairway is provided at less than 50 lux.; Lighting in a storage room is provided at less than 50 lux.; Motion sensor controlled switch controls an area greater than 240 square metres; Motion sensor controlled switch does not activate all lighting between vertical particians in a space that is an access to exit from a residential area; Motion sensor controlled switch does not activate within two seconds of any movement with or directly related to the area controlled by the motion controlled sw; Motion sensor controlled switch fails to maintain an average level of illumination of 10 lux at all times for an access to exit; Motion sensor controlled switch fails to maintain illumination for at least 15 minutes after the activity that caused the lighting to activate has stopped or le; Motion sensor controlled switch is of a type, the operation of which is impaired by the presence of smoke; Place of assembly is not equipped to provide an average level of illumination at floor level in the aisles of not less than two lux during viewing of motion pic; Provide coverage to all of the space so that there are no null zones; Required emergency lighting is provided at less than the minimum value of 1 lux.; Room or space used by public in building does not have lighting outlets with fixtures controlled by a wall switch or panel. Namely;; Storage room, dressing room, sanitary facility, service area or corridor serving an area where food is intended to be processed, prepared or manufactured is not; Transformer vault is not equipped to provide illumination to an average level of not less than 50 lux at floor or tread level.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.

    Jul 11, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 192100 PRS 00 IRClosed

    Property Standards

    Jul 11, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 197406 WST 00 IVClosed

    Notice Issued Waste

    Jun 23, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 181893 WST 00 IRClosed

    Waste

    Jun 23, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 179284 PRS 00 IVClosed

    Order Issued Property Standards: Adequate ventilation has not been provided.; Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.

    Apr 29, 2025 · 12 GOLDFINCH CRT
  • By-law investigation25 150980 PRS 00 IRClosed

    Property Standards

    Apr 29, 2025 · 12 GOLDFINCH CRT
  • Zoning review25 142064 LPRClosed
    Apr 9, 2025 · 12 GOLDFINCH CRT
  • By-law investigation24 253665 PRS 00 IRClosed

    Property Standards

    Dec 26, 2024 · 12 GOLDFINCH CRT
  • By-law investigation24 250526 WST 00 IRClosed

    Waste

    Dec 15, 2024 · 12 GOLDFINCH CRT
  • By-law investigation24 244647 PRS 00 IRClosed

    Property Standards

    Nov 28, 2024 · 12 GOLDFINCH CRT
  • Building permit23 200840Closed

    Proposal for balcony repairs

    Oct 17, 2023 · 12 GOLDFINCH CRT
  • Building permit21 215693Closed

    Proposal for the repair of underground parking garage.

    Oct 20, 2021 · 12 GOLDFINCH CRT
  • Building permit15 137530Closed

    Proposal to install a new Fire Alarm Control Panel in the electrical room in the parking garage of the existing apartment building.

    May 7, 2015 · 12 GOLDFINCH CRT
  • Building permit14 150870Permit Issued

    brick and concrete repairs to balconies

    May 8, 2014 · 12 GOLDFINCH CRT
  • Zoning review12 219118 LTOClosed
    Jul 26, 2012 · 12 GOLDFINCH CRT
  • Building permit10 293797Closed - Dormant

    Install backflow prevention device

    Nov 23, 2010 · 12 GOLDFINCH CRT
  • Building permit09 162692Inspection

    Convert salon and office into two new apt units - unit 105 and 106

    Nov 26, 2009 · 12 GOLDFINCH CRT
  • Zoning review07 106786 ZPUClosed
    Feb 5, 2007 · 12 GOLDFINCH CRT
  • Building permit06 151090Closed

    Repairs of 66 balconys front of building.

    Aug 2, 2006 · 12 GOLDFINCH CRT
  • Building permit06 124512Closed

    Repair of the parking garage.

    Apr 25, 2006 · 12 GOLDFINCH CRT
  • Building permit96 090038Closed

    FIRE ALARM RETROFIT

    Mar 2, 1998 · 12 GOLDFINCH CRT

Check before you build

  • Site-specific exception 900.8.10(139)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(139)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of North York By-law No. 20634.

By-law 569-2013, Chapter 900

Lot facts

Area
12,568 m²
Frontage
214.7 mestimated, irregular lot
Depth
107.2 mestimated, irregular lot
Street
Goldfinch Crt
Corner lot
No
Public lane
None
House footprint
1,567 m²roof up to 43.1 m
Back yard
38.3 mhouse to rear lot line
Side yards
58.2 m and 71.6 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Minimum frontage 30 m. Frontage is about 214.7 m (estimated, irregular lot): meets the zone minimum. Source
  • Minimum lot area 1375 m². Lot area is 12,568 m²: meets the minimum. Source
  • Zone RAC (f30.0; a1375; d1.5) (x139) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: maple, silver (37 cm), maple, silver (30 cm), maple, silver (29 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
3
Laneway suite permits
0
Multiplex permits
2
Development applications
2

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Under Review

    580 FINCH AVE W · Oct 8, 2026 · 270 m away
  • Building permit

    Construction of a above ground shelter system for an underground garage ramp.

    4 GOLDFINCH CRT · May 15, 2026 · 160 m away
  • Building permit

    Proposal for new canopy above existing drive way ramp to underground parking.

    601 FINCH AVE W · May 12, 2026 · 66 m away
  • Building permit

    Construction of a above ground shelter system for an underground garage ramp.

    12 GOLDFINCH CRT · Nov 14, 2025 · 12 m away
  • Building permitgarden suite

    Proposal to construct a one-storey garden suite complete with a basement.

    560 FINCH AVE W · Sep 17, 2025 · 298 m away
  • Building permitgarden suite

    Proposal for removal of existing shed and construction of new detached rear yard garden suite in existing rear yard

    4 VIRGILWOOD DR · Sep 16, 2025 · 298 m away
  • Building permitmultiplex

    Proposal for interior alterations to existing semi-detached dwelling and a second storey addition to create two (2) additional dwelling units - total of three (3) dwelling units.

    4 VIRGILWOOD DR · Jul 7, 2025 · 298 m away
  • Building permit

    Proposal to Concrete Repair for exterior walls and slabs

    625 FINCH AVE W · Jul 3, 2025 · 278 m away
  • Building permitmultiplex

    Proposal for interior alterations to existing semi-detached dwelling and a second storey addition to create two additional dwelling units. (Triplex)

    560 FINCH AVE W · Jul 2, 2025 · 298 m away
  • Building permit

    Proposal to concrete repaird for garage roof slab expansion joint and ramp replacement

    623 FINCH AVE W · May 20, 2025 · 225 m away

Neighbourhood: Westminster-Branson

About the area around the lot, not the lot itself.

Nearest station
Opposite 1042 Sheppard Ave West- Sheppard West Station40 min walk
Nearest TTC stop
Finch Ave West at Goldfinch Crt East Side2 min walk
Nearest cycling route
Finch Corridor TrlMulti-Use Trail, 7 min walk
Nearest traffic count
17,314 vehicles in 8 hFinch Ave W / Torresdale Ave / Goldfinch Crt, 140 m away, Nov 22, 2023
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
West Don Parkland1 min walk
Robert Hicks Park3 min walk
Hearthstone Valley Greenbelt5 min walk

Schools within 1 km

  • FOREST VALLEY OUTDOOR EDUCATION CENTRE English Public 7 min walk
  • NORTHVIEW HEIGHTS SECONDARY SCHOOL English Public 8 min walk
  • CRAWFORD ADVENTIST ACADEMY HIGH SCHOOL Private 8 min walk
  • CHARLES H BEST MDL SCHOOL English Public 12 min walk
  • WILMINGTON ELEMENTARY SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWestminster-BransonMedian neighbourhood
Median household income (2020)$76,000$84,500
Households that own their home40%54%
Population (2021)25,70516,813
Homes built in 1960 or before11%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWestminster-BransonCity median
Assault512.3636.3
Robbery31.469.5
Auto theft188.2192.6
Theft over $5,00024.446.1
Break and enter59.2172.8
Theft from vehicles122188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.