HousePrecheckCheck an address

1192A Gerrard St EToronto · zoning, lot size and permit records

Residential · R (d1.0) (x802)3.1 × 34.0 m104 m²on Gerrard St Ebacks onto Ln N Gerrard W Greenwood

Not a home

Vacant Land

The City of Toronto's real estate inventory lists Vacant Land here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • 3 development applications open within 300 m, up to 12 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N10 m
3.1 m frontage34.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Site-specific exception 900.2.10(802)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(802)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(7).

1 part for other addresses
  • A On 1117 Gerrard St. E., former City of Toronto by-law 640-91.
By-law 569-2013, Chapter 900

Lot facts

Area
104 m²
Frontage
3.1 m
Depth
34 m
Street
Gerrard St E
Corner lot
No
Public lane
Ln N Gerrard W Greenwood, 3.1 m along it
Max height
11 m
Max lot coverage
—
  • Zone R (d1.0) (x802) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
95%63 of 66 decisions
Garden suite permits
2
Laneway suite permits
14
Multiplex permits
13
Development applications
3

Within 300 m, last 10 years. 29 suite and multiplex permits: more than at 94% of Toronto houses (median 3). 66 variance decisions: more than at 95% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new six-storey apartment building (cantilevered at the northwest corner and rear (south) portions of the building) with a front covered porch, ground floor front and rear entrance landings with stairs (located at the west side of the building), front balconies on the second to fifth storeys, and a mechanical penthouse with equipment screening on the roof of the sixth storey. There will be one vehicular visitor parking space and seven long-term bicycle parking spaces provided in the rear yard (located below the cantilevered portion of the building abutting the laneway). There will be a total of seven residential dwelling units on this lot.

    1111 GERRARD ST E · Sep 9, 2026 · 303 m away
  • Minor varianceApproved

    To legalize and to maintain a one-storey detached ancillary building (containing one laneway suite) in the rear yard, abutting the laneway. This ancillary building was constructed without an authorized building permit.

    44 SANDFORD AVE · Jan 21, 2026 · 165 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition, which will be cantilevered at the rear of the building.

    2 PRUST AVE · Nov 12, 2025 · 52 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a third-storey addition, and a front yard parking pad.

    12 SANDFORD AVE · Nov 12, 2025 · 113 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch (for habitable space) as well as to construct a new porch with stairs anda rear ground floor deck with stairs.

    22 ATHLETIC AVE · Sep 17, 2025 · 328 m away

Latest activity nearby

  • Minor variancePending

    To alter the existing two-and-one-half-storey semi-detached dwelling by demolishing the existing front porch and constructing a new one-storey enclosed front porch addition (mudroom) with stairs.

    274 GREENWOOD AVE · Dec 16, 2026 · 294 m away
  • Minor variancePending

    In Process

    4 STANTON AVE · Nov 19, 2026 · 127 m away
  • Building permitsecondary suite

    Proposed work of second dwelling unit ( legal basement ), powder room at first floor, laundry at second floor and LVL at first floor.

    31 IVY AVE · Nov 6, 2026 · 269 m away
  • Zoning review

    Not Started

    254 GREENWOOD AVE · Nov 5, 2026 · 239 m away
  • Building permitmultiplex

    New deck landing and door for second entry to main floor

    254 GREENWOOD AVE · Nov 5, 2026 · 239 m away
  • Building permit

    Proposal for rear deck

    1292 GERRARD ST E · Oct 23, 2026 · 255 m away
  • Building permit

    Admin partywall permit in conjunction with 26 129221 BLD, 12 Sandford Ave.

    10 SANDFORD AVE · Oct 22, 2026 · 104 m away
  • Building permit

    PROPOSED REAR YARD DECK

    1292 GERRARD ST E · Oct 13, 2026 · 255 m away
  • Building permit

    install backwater valve

    1149 GERRARD ST E · Sep 2, 2026 · 137 m away
  • Building permit

    Proposed partial one story porch enclosure and third storey addition

    102 IVY AVE · Aug 31, 2026 · 295 m away

Neighbourhood: South Riverdale

About the area around the lot, not the lot itself.

Nearest station
Donlands Station21 min walk
Nearest TTC stop
Gerrard St East at Prust Ave1 min walk
Nearest cycling route
Greenwood AveBike Lane, 3 min walk
Nearest traffic count
16,910 vehicles in 14 hGerrard St E / Greenwood Ave, 200 m away, Oct 8, 2025
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 1 with cyclists
Parks
Greenwood Park1 min walk
58 Curzon Street Park10 min walk
The Pocket11 min walk

Schools within 1 km

  • RIVERDALE COLLEGIATE INSTITUTE English Public 6 min walk
  • LESLIEVILLE JR PUBLIC SCHOOL English Public 7 min walk
  • ST JOSEPH CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • BON BERGER CATHOLIC ELEMENTARY SCHOOL French Separate 9 min walk
  • BLAKE ST JR & EAST ALTERNATIVE English Public 11 min walk
  • KEW PARK MONTESSORI SCHOOL - HIAWATHA Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth RiverdaleMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)27,81516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth RiverdaleCity median
Assault828.7636.3
Robbery69.369.5
Shootings3.210.5
Auto theft217.4192.6
Theft over $5,00088.246.1
Break and enter264.7172.8
Theft from vehicles349.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.