HousePrecheckCheck an address

1190 Yonge StToronto · zoning, lot size and permit records

Commercial residential · CR 2.0 (c2.0; r1.0) SS2 (x2428)≈ 11.6 × 17.5 m146 m²on Yonge Stcorner, also on Birch Ave

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 10 development applications open within 300 m, up to 49 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: SummerhillThe City plans more homes around the station: good for transit, and more building over time.
N5 m
≈ 11.6 m frontage≈ 17.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    0 approved. A0596/16TEY (To construct a new five-storey detached building containing office and retail use, 2016).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 10 development applications open within 300 m

    Good to know

    10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Minor varianceA0596/16TEYDeferred

    To construct a new five-storey detached building containing office and retail use.

    Oct 19, 2016 · 1190 YONGE ST
  • Zoning review16 180015 PSPClosed
    Jun 29, 2016 · 1190 YONGE ST
  • Development application16 180015 STE 22 SAClosed

    Site Plan Approval application to construct a new 5-storey commercial building.

    Jun 24, 2016 · 1190 YONGE ST
  • Zoning review16 159303 ZPRClosed
    May 20, 2016 · 1190 YONGE ST
  • Zoning review15 246681 ZPRClosed
    Nov 3, 2015 · 1190 YONGE ST
  • Building permit98 018418Closed

    BUILD ARTIST OR PHOTOGRAPHERS STUDIO AND PERSONAL GROOMING EST. BLD LG 'RAFFAELLO'

    Aug 18, 1998 · 1190 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2428)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2428)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 262 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  3. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 262 of former City of Toronto By-law 438-86

  4. Older by-law B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
146 m²
Frontage
11.6 mestimated, irregular lot
Depth
17.5 mestimated, irregular lot
Street
Yonge St
Corner lot
Yes, also on Birch Ave17.5 m along it
Public lane
None
Max height
12 m
Max lot coverage
—
  • Major Transit Station Area: Summerhill. The lot is inside the Summerhill Major Transit Station Area approved by the Province (Site and Area Specific Policy 720). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 2.0 (c2.0; r1.0) SS2 (x2428) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
94%44 of 47 decisions
Garden suite permits
2
Laneway suite permits
3
Multiplex permits
3
Development applications
22

Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 47 variance decisions: more than at 82% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. The existing two residential dwelling units (occupying the second and third levels) will be maintained and unaltered.

    1262 YONGE ST · Jun 3, 2026 · 255 m away
  • Minor varianceApproved

    To alter the development standards, as approved under Site Specific Zoning By-law 267-2021 (LPAT), for the 23-storey mixed-use building (currently under construction) by constructing a one-storey addition (enclosed solarium / patio) for the use of the eating establishment (restaurant), by increasing the total gross floor area, the horizontal patio projection, and building heights (the enclosed solarium/patio will have a height of 4.6 m). Also to reduce the north building setback from 5.9 m to 4.35 m, the south building separation distance from 5.5 m to 2.58 m, and to alter the location of the ground level vertical clearance area as depicted on Diagram 6. There will be a total of 127 residential dwelling units on this lot.

    5 SCRIVENER SQ · Apr 15, 2026 · 116 m away
  • Minor varianceApproved

    To alter the development standards, as approved under Site Specific Zoning By-law 1201-2022(OLT), for the 10-storey mixed-use building to increase the number of storeys to 13-storeys, the building height from 44.95 m to 59.14 m (including the mechanical penthouse), and gross floor area, as well as modifications to the building setbacks.This is currently under the review of Site Plan Control (File No. 21 250334 STE 11 SA). There will be a total of 99 residential dwelling units on this lot, with an eating establishment (restaurant) and an outdoor patio on the ground floor.

    1140 YONGE ST · Feb 25, 2026 · 196 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 761-2023), for a new 12-storey mixed-use building, by increasing the maximum permitted building height (from 44.9 m to 46.27 m), equipment/structure projection beyond the maximum building height, and to reduce the minimum building setbacks. There will be a total of 24 residential dwelling units on this lot.

    1080 YONGE ST · Oct 29, 2025 · 402 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the six-storey office building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1 and P2 will be maintained and unaltered. There will be a total of 47 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    1155 YONGE ST · Oct 22, 2025 · 116 m away

Latest activity nearby

  • Minor variancePending

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear ground floor addition (with a basement addition below, including a walkout), a rear second storey addition, and a rear third storey addition with a rear balcony (above the second storey roof).

    49 WALKER AVE · Dec 9, 2026 · 226 m away
  • Zoning review

    Not Started

    1208 YONGE ST · Nov 23, 2026 · 54 m away
  • Building permit

    Changes to basement level mechanical plan and roof mechanical plan

    1101 YONGE ST · Nov 23, 2026 · 145 m away
  • Building permit

    A proposal to erect and display sixOverhanging Structure Signs, two Projecting Signs and three wall signs all non- illuminated and displaying static copy.***GEE BEAUTY***

    8 PRICE ST · Nov 23, 2026 · 161 m away
  • Building permit

    Stand alone plumbing permit for the sump pump added due to existing site conditions

    1101 YONGE ST · Nov 16, 2026 · 145 m away
  • Building permit

    HVAC - One temporary structure for kitchen consisting of 3 shipping containers. Install date: December 1st.Removal date: December 31st

    44 PRICE ST · Nov 13, 2026 · 246 m away
  • Building permit

    Proposal to install backwater valve

    20 MACPHERSON AVE · Nov 13, 2026 · 237 m away
  • Minor variancePending

    Accepted

    5 SCRIVENER SQ · Nov 10, 2026 · 116 m away
  • Zoning review

    Closed

    8 PRICE ST · Nov 2, 2026 · 161 m away
  • Zoning review

    Not Started

    11 TACOMA AVE · Oct 28, 2026 · 267 m away

Neighbourhood: Yonge-St.Clair

About the area around the lot, not the lot itself.

Nearest station
Summerhill Station2 min walk
Nearest TTC stop
Yonge St at Alcorn Ave - Summerhill Station2 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
7,649 vehicles in 8 hYonge St / Birch Ave, 30 m away, Mar 29, 2022
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 2 with cyclists
Parks
Pricefield Road Playground3 min walk
Lionel Conacher Park3 min walk
Marlborough Place Parkette5 min walk

Schools within 1 km

  • COTTINGHAM JR PUBLIC SCHOOL English Public 6 min walk
  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 6 min walk
  • DE LASALLE COLLEGE SCHOOL Private 9 min walk
  • THE LINDEN SCHOOL Private 10 min walk
  • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 13 min walk
  • BROWN JR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-St.ClairMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home40%54%
Population (2021)12,90516,813
Homes built in 1960 or before45%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-St.ClairCity median
Assault270.8636.3
Robbery25.869.5
Auto theft64.5192.6
Theft over $5,00032.246.1
Break and enter374172.8
Theft from vehicles116.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.