HousePrecheckCheck an address

1180 Eglinton Ave EToronto · zoning, lot size and permit records

10.8 × 11.2 m121 m²on Eglinton Ave E

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 5 development applications open within 300 m, up to 53 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
N5 m
10.8 m frontage11.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 53 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit24 102518Cancelled

    Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of CSS and overall approach to fire safety in rapid transit stations and the role played by the CSS, our position of this provision is that monitoring in this context is not exclusively limited to monitoring of the fire alarm system. Further, it is our position that the intent behind this sentence is to ensure that the CSS meets the high level of reliability that would be achieved by complying with CAN/ULC-S561, including the robust fire alarm, emergency power and security requirements contained within this standard.Based on the review described in the SenezCo report dated January 8 2024, accompanying this submission, the coordination of system response for different fire emergencies, will provide the level of protection intended by OBC Sentences 3.13.5.4.(1) and 3.13.5.6.(2) for communication to the central supervising station, including the use of a certified 3rd party monitoring company to relay signals from the station fire alarm panels.Further, the BOCC was designed and constructed in a manner that substantially meets or otherwise meets the intent of CAN/ULC S561, and the functions intended by the OBC definition of a central supervising station. On this basis, and with the implementation of the protocols described in the SenezCo report, the operation of the transit system from the BOCC by CTS affords the level of protection anticipated by the OBC for transit stations

    Jan 8, 2024 · 1180 EGLINTON AVE E
  • Building permit23 172604Approved

    Protection of Standpipe Systems at all Stations

    Jul 11, 2023 · 1180 EGLINTON AVE E
  • Building permit16 234974Closednew building

    Revision 02 - addition of platform edge bollards. Refer to typical design approvals in ADS 22 193328, 22 200930, 22 216439 and 22 216647Revision 01 - Bus terminal property line revision: refer to attached spreadsheet for all list of revisions. Include Alternative Solution 19-259678 ALTConstruction of the Science Centre Station of the Eglinton Crosstown LRT

    Apr 14, 2023 · 1180 EGLINTON AVE E
  • Building permit22 230574Closed

    installation of the future Presto Faregates to the transit subway station that has received occupany permit 22 191657 000 00 AO - Science centre

    Dec 14, 2022 · 1180 EGLINTON AVE E
  • Building permit22 200927Cancelled

    Require the installation of bollard barriers

    Sep 8, 2022 · 1180 EGLINTON AVE E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
121 m²
Frontage
10.8 m
Depth
11.2 m
Street
Eglinton Ave E
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%5 of 5 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    7

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit the roof overhang for the proposed Don Mills Community Recreation Center.

      844 DON MILLS RD · Aug 20, 2026 · 336 m away
    • Minor varianceApproved

      To propose operation of a temporary garden centre in association with the existing food store between April 1st and August 1st annually.

      825 DON MILLS RD · Mar 24, 2022 · 162 m away
    • Minor varianceApproved

      Proposal to permit all resident bicycle parking spaces to be located on the second level of the below grade parking structure.

      844 DON MILLS RD · Sep 2, 2021 · 336 m away
    • Minor varianceApproved

      To permit the location of bicycle parking spaces within levels one and two of the underground garage.

      844 DON MILLS RD · Jul 8, 2021 · 336 m away
    • Minor varianceApproved

      To enclose the front porch and create a new door in the front main wall.

      50 SETON PARK RD · Oct 7, 2020 · 414 m away

    Latest activity nearby

    • Building permit

      Proposal for the installation of a temporary fire-rated dust-tight hoarding within the ECLRT tunnel to separate the public from the Ontario Line construction area.Egress requirements, life safety systems, pedestrian circulation and ECLRT facilities operation will not be impacted. Pedestrian modeling and fire life safety documentation is provided as part of the permit application package.

      825 DON MILLS RD · Nov 25, 2026 · 162 m away
    • Zoning review

      Closed

      15 GERVAIS DR · Nov 23, 2026 · 224 m away
    • Building permit

      Proposed localized concrete repairs for parking garage tunnel and drainage system replacement.

      789 DON MILLS RD · Sep 16, 2026 · 273 m away
    • Zoning review

      Closed

      793 DON MILLS RD · Sep 8, 2026 · 227 m away
    • Building permit

      Proposed parking garage structural concrete repairs and podium deck leaking crack injection.

      789 DON MILLS RD · Sep 1, 2026 · 273 m away
    • Zoning review

      Closed

      1185 EGLINTON AVE E · Aug 6, 2026 · 169 m away
    • Zoning review

      Closed

      15 GERVAIS DR · Jul 28, 2026 · 224 m away
    • Building permit

      The proposed Site Services Permit is for temporary water connections for construction activitiesat Don Valley Station (previously known as Science Centre Station) at 825 Don Mills Road.

      825 DON MILLS RD · May 27, 2026 · 162 m away
    • Building permit

      Proposed Tent and Shade Structure for a temporary garden centre from June 15 to July 15, 2026.

      825 DON MILLS RD · May 6, 2026 · 162 m away
    • Development application

      OPA & Rezoning Application proposes the development of two 53-storey mixed-use buildings providing residential, and commercial use at grade. The buildings will provide a total of 1,424 residential units, being a mix of 1-bedroom, 1-bedroom + den, 2-bedroom, 2-bedroom + den and 3-bedroom units. The building will also provide retail units at grade. A paved access from Yeomans road along the southern property line will be provided, leading to 2 levels of below-grade parking, providing a total of 489 parking spaces; as well as 642 bicycle parking spaces. The proposed development provides a total GFA of 92,901 square metres and an FSI of 9.4. Additionally, the proposed development provides 3,992 square metres of indoor amenity space and 1,713 square metres of outdoor amenity space.

      15 GERVAIS DR · May 5, 2026 · 208 m away · City file

    Neighbourhood: Banbury-Don Mills

    About the area around the lot, not the lot itself.

    Nearest station
    Don Valley Station1 min walk
    Nearest TTC stop
    Don Valley Station1 min walk
    Nearest cycling route
    Eglinton Ave EBike Lane, 1 min walk
    Nearest traffic count
    54,528 vehicles in 14 hDon Mills Rd / Eglinton Ave E, 80 m away, Sep 15, 2026
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 1 with cyclists
    Parks
    E.T. Seton Park5 min walk
    Ferrand Drive Park6 min walk
    Big Bear Park7 min walk

    Schools within 1 km

    • GRENOBLE PUBLIC SCHOOL English Public 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureBanbury-Don MillsMedian neighbourhood
    Median household income (2020)$91,000$84,500
    Households that own their home60%54%
    Population (2021)27,15516,813
    Homes built in 1960 or before24%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleBanbury-Don MillsCity median
    Assault404.9636.3
    Robbery101.269.5
    Shootings9.210.5
    Auto theft220.9192.6
    Theft over $5,00067.546.1
    Break and enter248.5172.8
    Theft from vehicles211.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.