HousePrecheckCheck an address

1174 Yonge StToronto · zoning, lot size and permit records

Residential · R (f5.0; d0.6) (x892)≈ 21.2 × 95.8 m694 m²on Yonge Stbacks onto Crown's Lane

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 15 130965 (Proposal for minor concrete repairs to 15 balconies in an existing apartment building, 2015, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 11 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: RosedaleThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 21.2 m frontage≈ 95.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2015

    Needs a closer look

    Still open in the City's records: 15 130965 (Proposal for minor concrete repairs to 15 balconies in an existing apartment building, 2015, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation26 196288 WST 00 IRClosed

    Waste

    Jul 6, 2026 · 1174 YONGE ST
  • Building permit15 130965Permit Issued

    Proposal for minor concrete repairs to 15 balconies in an existing apartment building.

    Apr 22, 2015 · 1174 YONGE ST
  • Building permit11 224734Closed

    Proposal to install one backflow prevention device for existing apartment building.

    Jun 28, 2011 · 1174 YONGE ST
  • Building permit05 136049Closed

    Install 3 maglocks in lobby area on 1st floor.

    May 26, 2005 · 1174 YONGE ST

Check before you build

  • Exception 900.2.10(892) does not apply to this address

    Good to know

    The exception covers this area, but each of its 3 parts names other addresses. The standard rules on this page apply.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(892)Does not apply

Every part of the exception names other addresses. The standard rules apply to this lot.

3 parts for other addresses
  • A On 10 Alex Mews, 10R Alex Mews, 12 Alex Mews, 12R Alex Mews, the even numbered addresses of 14-16 Alex Mews, 16R Alex Mews, 18 Alex Mews, 18R Alex Mews, 2 Alex …
  • B On the odd numbered addresses of 121-123 Marlborough Ave., former City of Toronto by-law 379-73
  • C On the lands known in 1995 as 20 Marlborough Ave., former City of Toronto by-law 96-0334 clause 5.(1) and (2).
By-law 569-2013, Chapter 900

Lot facts

Area
694 m²
Frontage
21.2 mestimated, irregular lot
Depth
95.8 mestimated, irregular lot
Street
Yonge St
Corner lot
No
Public lane
Crown's Lane, 5.9 m along it
Max height
13 m
Max lot coverage
—
  • Site and Area Specific Policy 209, 211. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Rosedale. The lot is inside the Rosedale Major Transit Station Area approved by the Province (Site and Area Specific Policy 719). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Minimum frontage 5 m. Frontage is about 21.2 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone R (f5.0; d0.6) (x892) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
96%44 of 46 decisions
Garden suite permits
2
Laneway suite permits
3
Multiplex permits
2
Development applications
24

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 46 variance decisions: more than at 81% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    6 GIBSON AVE · Oct 14, 2026 · 354 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a front covered porch with stairs.

    67 SUMMERHILL AVE · Sep 23, 2026 · 382 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition (cantilevered on the southeast side of the dwelling) with a rear covered balcony.

    89 MARLBOROUGH AVE · Jun 3, 2026 · 260 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a side (east) second storey addition (enclosing the existing partially covered porch and open patio into habitable space).

    81 R WOODLAWN AVE E · May 27, 2026 · 471 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear deck, a rear ground level deck with stairs, and a new front porch with stairs. The existing rear one-storey detached ancillary building (storage area) will be maintained and unaltered.

    38 WALKER AVE · Mar 4, 2026 · 314 m away

Latest activity nearby

  • Minor variancePending

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear ground floor addition (with a basement addition below, including a walkout), a rear second storey addition, and a rear third storey addition with a rear balcony (above the second storey roof).

    49 WALKER AVE · Dec 9, 2026 · 270 m away
  • Zoning review

    Not Started

    1208 YONGE ST · Nov 23, 2026 · 135 m away
  • Building permit

    Changes to basement level mechanical plan and roof mechanical plan

    1101 YONGE ST · Nov 23, 2026 · 96 m away
  • Building permit

    A proposal to erect and display sixOverhanging Structure Signs, two Projecting Signs and three wall signs all non- illuminated and displaying static copy.***GEE BEAUTY***

    8 PRICE ST · Nov 23, 2026 · 122 m away
  • Building permit

    Stand alone plumbing permit for the sump pump added due to existing site conditions

    1101 YONGE ST · Nov 16, 2026 · 96 m away
  • Building permit

    HVAC - One temporary structure for kitchen consisting of 3 shipping containers. Install date: December 1st.Removal date: December 31st

    44 PRICE ST · Nov 13, 2026 · 236 m away
  • Building permit

    Proposal to install backwater valve

    20 MACPHERSON AVE · Nov 13, 2026 · 155 m away
  • Minor variancePending

    Accepted

    5 SCRIVENER SQ · Nov 10, 2026 · 86 m away
  • Development application

    Application Received

    1088 YONGE ST · Nov 4, 2026 · 286 m away · City file
  • Zoning review

    Closed

    8 PRICE ST · Nov 2, 2026 · 122 m away

Neighbourhood: Annex

About the area around the lot, not the lot itself.

Nearest station
Summerhill Station3 min walk
Nearest TTC stop
Yonge St at MacPherson Ave3 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
7,888 vehicles in 8 hYonge St / Scrivener Sq, 50 m away, Jun 21, 2023
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 2 with cyclists
Parks
Lionel Conacher Park3 min walk
Pricefield Road Playground4 min walk
Marlborough Place Parkette4 min walk

Schools within 1 km

  • COTTINGHAM JR PUBLIC SCHOOL English Public 5 min walk
  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 8 min walk
  • DE LASALLE COLLEGE SCHOOL Private 9 min walk
  • THE LINDEN SCHOOL Private 11 min walk
  • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 12 min walk
  • JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAnnexMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home41%54%
Population (2021)29,30016,813
Homes built in 1960 or before40%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAnnexCity median
Assault1080.9636.3
Robbery80.569.5
Homicide5.25.3
Shootings5.210.5
Auto theft116.9192.6
Theft over $5,000114.346.1
Break and enter387.1172.8
Theft from vehicles220.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.