HousePrecheckCheck an address

117 Sinnott RdToronto · zoning, lot size and permit records

Employment · E 1.049.0 × 120.3 m5,855 m²on Sinnott Rdcorner, also on Sherry Rd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: Birchmount (Eglinton)The City plans more homes around the station: good for transit, and more building over time.
N50 m
49.0 m frontage120.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    3 records on file: more than at 81% of Toronto houses (median 0).

    • Building permit16 130397Closed

      To install 1 Backflow Prevention Devices (Water only).

      Mar 29, 2016 · 117 SINNOTT RD
    • Building permit02 193715Closed

      NEW 120 FEET 10" WATER MAIN CONNCECTION TO EXISTING SPRINKLER SYSTEM

      Dec 4, 2002 · 117 SINNOTT RD
    • Building permit02 182274Closed

      pump room

      Nov 25, 2002 · 117 SINNOTT RD

    Lot facts

    Area
    5,855 m²
    Frontage
    49 m
    Depth
    120.3 m
    Street
    Sinnott Rd
    Corner lot
    Yes, also on Sherry Rd120.3 m along it
    Public lane
    None
    House footprint
    3,487 m²roof up to 10.4 m
    Back yard
    17.8 mhouse to rear lot line
    Side yards
    1.8 m and 8.7 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Major Transit Station Area: Birchmount (Eglinton). The lot is inside the Birchmount (Eglinton) Major Transit Station Area approved by the Province (Site and Area Specific Policy 669). Source
    • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
    • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: ginkgo (4 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%2 of 2 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To use the existing parking area as vehicle storage for vehicles to be repaired.

      112 SINNOTT RD · Jul 25, 2019 · 196 m away
    • Minor varianceApproved

      The applicant is seeking relief from the provisions of the Zoning By-law to maintain the open storage area located in the street yard for the existing recycling facility in Unit 6A (Bestway Metal Recycling), which warehouse, processes and ships recyclable materials. The Committee of Adjustment approved the variances (A204/14SC) in 2014 for a period of 5 years. The applicant would like to get a permanent approval.

      123 MANVILLE RD · Mar 21, 2019 · 341 m away
    • Minor varianceApproved

      The owners of the property are requesting variances for the existing office building and vehicle service and repair shops.

      116 MANVILLE RD · Jan 21, 2016 · 389 m away
    • Minor varianceApproved

      The applicant is seeking relief from the provisions of the Zoning By-law to maintain the open storage area located in the street yard for the existing recycling facility in Unit 6A (Bestway Metal Recycling), which warehouse, processes and ships recyclable materials.

      123 MANVILLE RD · Nov 20, 2014 · 341 m away

    Latest activity nearby

    • Building permit

      Addition of 1 maglock on the fist floor and addition of 2 maglocks on the second floor.

      888 BIRCHMOUNT RD · Oct 30, 2026 · 284 m away
    • Minor variancePending

      Accepted

      2 CHELWOOD RD · Oct 22, 2026 · 209 m away
    • Building permit

      Proposal for the installation of a spray paint booth

      111 SINNOTT RD · Sep 4, 2026 · 53 m away
    • Zoning review

      Notice Sent

      2 CHELWOOD RD · Sep 2, 2026 · 209 m away
    • Zoning review

      Closed

      780 BIRCHMOUNT RD · Jul 7, 2026 · 174 m away
    • Zoning review

      Cancelled

      126 SINNOTT RD · May 14, 2026 · 278 m away
    • Building permit

      Proposal for interior alteration to vacant unit for fitout of new tenant.

      888 BIRCHMOUNT RD · May 4, 2026 · 284 m away
    • Zoning review

      Notice Sent

      733 BIRCHMOUNT RD · Apr 10, 2026 · 290 m away
    • Zoning review

      Closed

      76 SHERRY RD · Mar 3, 2026 · 185 m away
    • Zoning review

      Closed

      126 SINNOTT RD · Nov 13, 2025 · 278 m away

    Neighbourhood: Clairlea-Birchmount

    About the area around the lot, not the lot itself.

    Nearest station
    Birchmount Station9 min walk
    Nearest TTC stop
    Birchmount Rd at Chelwood Rd3 min walk
    Nearest cycling route
    Eglinton Ave EBike Lane, 8 min walk
    Nearest traffic count
    12,892 vehicles in 14 hChelwood Rd / Birchmount Rd, 200 m away, Oct 19, 2024
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Maywood Tot Lot9 min walk
    Eglinton Ravine Park11 min walk
    Geco Park12 min walk

    Schools within 1 km

    • KHAIRUL UMMAH SCHOOL Private 8 min walk
    • GENERAL BROCK PUBLIC SCHOOL English Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureClairlea-BirchmountMedian neighbourhood
    Median household income (2020)$90,000$84,500
    Households that own their home64%54%
    Population (2021)26,84016,813
    Homes built in 1960 or before39%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleClairlea-BirchmountCity median
    Assault1303.8636.3
    Robbery4969.5
    Shootings9.810.5
    Auto theft287.6192.6
    Theft over $5,0008546.1
    Break and enter189.5172.8
    Theft from vehicles290.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.