HousePrecheckCheck an address

1165 Birchmount RdToronto · zoning, lot size and permit records

Residential apartment · RA (au99.0) (x751)24.9 × 78.0 m1,930 m²on Birchmount Rd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 20 rental units, built 1965More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 1 development application open within 300 m, up to 3 storeysNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
  • City upkeep score: 93 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
24.9 m frontage78.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 170506 000 00 IR (Adequate Heat, 2026); 26 170505 000 00 IR (Property Standards, 2026); 25 243601 HEA 00 IR (Adequate Heat, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 93 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 20 units, built 1965).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 231413 WST 00 IRClosed

    Waste

    Sep 2, 2026 · 1165 BIRCHMOUNT RD
  • By-law investigation26 170506 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 1165 BIRCHMOUNT RD
  • By-law investigation26 170505 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 1165 BIRCHMOUNT RD
  • By-law investigation25 243601 HEA 00 IRClosed

    Adequate Heat

    Oct 22, 2025 · 1165 BIRCHMOUNT RD
  • Building permit18 144755Closed

    Proposed installation of DCVA Backflow Preventer and Thermal Expansion Tank for premise isolation.

    May 9, 2018 · 1165 BIRCHMOUNT RD

Check before you build

  • Site-specific exception 900.7.10(751)

    Needs a closer look

    3 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(751)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback , measured from the original centre line of the street is 25.0 metres

  2. Rule B

    The minimum building setback from a side lot line is a distance equal to half the height of the building

  3. Rule C

    A maximum of 50 percent of the interior floor area of the first floor may be used for dwelling units .

By-law 569-2013, Chapter 900

Lot facts

Area
1,930 m²
Frontage
24.9 m
Depth
78 m
Street
Birchmount Rd
Corner lot
No
Public lane
None
House footprint
431 m²roof up to 17.6 m
Back yard
34.5 mhouse to rear lot line
Side yards
4.8 m and 6.2 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone RA (au99.0) (x751) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: honey locust shademaster (42 cm), maple, norway (23 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
83%10 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    New Recreational Baskeball Facility. Proposal for addition of a new ventilation (make up air system) and energy recovery unit, modification of interior diffusers and electrical life safety. Design includes for option heat pump units to provide auxiliary heat in lieu of existing gas power unit heaters.

    1160 BIRCHMOUNT RD · Sep 3, 2026 · 174 m away
  • Building permit

    Interior alterations to the existing kitchen layout and plumbing. to 13 units owned by Rainbow Investment Ltd. - Unit 406.

    1159 BIRCHMOUNT RD · Aug 17, 2026 · 48 m away
  • Building permit

    Interior alterations to the existing kitchen layout and plumbing to 13 units owned by Rainbow Investment Ltd. - Unit 404

    1159 BIRCHMOUNT RD · Aug 17, 2026 · 48 m away
  • Building permit

    Interior alterations to the existing kitchen layout and plumbing. to 13 units owned by Rainbow Investment Ltd. - Unit 403

    1159 BIRCHMOUNT RD · Aug 17, 2026 · 48 m away
  • Building permit

    Interior alterations to the existing kitchen layout and plumbing. to 13 units owned by Rainbow Investment Ltd. - Unit 402.

    1159 BIRCHMOUNT RD · Aug 17, 2026 · 48 m away
  • Building permit

    Interior alterations to the existing kitchen layout and plumbing. to 13 units owned by Rainbow Investment Ltd. - Unit 401.

    1159 BIRCHMOUNT RD · Aug 17, 2026 · 48 m away
  • Building permit

    Interior alterations to the existing kitchen layout and plumbing. to 13 units owned by Rainbow Investment Ltd. - Unit 306.

    1159 BIRCHMOUNT RD · Aug 17, 2026 · 48 m away
  • Building permit

    Interior alterations to the existing kitchen layout and plumbing. to 13 units owned by Rainbow Investment Ltd. - Unit 305

    1159 BIRCHMOUNT RD · Aug 17, 2026 · 48 m away
  • Building permit

    Interior alterations to the existing kitchen layout and plumbing. to 13 units owned by Rainbow Investment Ltd. - Unit 303

    1159 BIRCHMOUNT RD · Aug 17, 2026 · 48 m away
  • Building permit

    Interior alterations to the existing kitchen layout and plumbing. to 13 units owned by Rainbow Investment Ltd. - Unit 304

    1159 BIRCHMOUNT RD · Aug 17, 2026 · 48 m away

Neighbourhood: Dorset Park

About the area around the lot, not the lot itself.

Nearest station
Birchmount Station22 min walk
Nearest TTC stop
Birchmount Rd at Flora Dr1 min walk
Nearest cycling route
Gatineau Hydro Corridor TrlMulti-Use Trail, 5 min walk
Nearest traffic count
19,064 vehicles in 14 hBirchmount Rd / Flora Dr, 90 m away, Oct 19, 2024
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Givendale Garden Plots8 min walk
McGregor Park8 min walk
Ionview Park8 min walk

Schools within 1 km

  • DELTA ACADEMY INC SECONDARY SCHOOL Private 3 min walk
  • GENERAL CRERAR PUBLIC SCHOOL English Public 8 min walk
  • IONVIEW PUBLIC SCHOOL English Public 12 min walk
  • WINSTON CHURCHILL COLLEGIATE INSTITUTE English Public 12 min walk
  • ST LAWRENCE CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
  • DORSET PARK PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDorset ParkMedian neighbourhood
Median household income (2020)$79,000$84,500
Households that own their home60%54%
Population (2021)24,30516,813
Homes built in 1960 or before26%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDorset ParkCity median
Assault672636.3
Robbery112.669.5
Shootings18.210.5
Auto theft356192.6
Theft over $5,00072.646.1
Break and enter192.5172.8
Theft from vehicles334.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.