HousePrecheckCheck an address

1150 Finch Ave WToronto · zoning, lot size and permit records

Employment · EH 1.0 (x45)267.9 × 438.2 m103,827 m²on Alexdon Rdcorner, also on Finch Ave W

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 10 302223 (Imperial Oil Esso Fire alarm replacement, 2011, status Permit Issued); 09 143310 (Proposed installation of 9 backflow prevention device, 2009, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
267.9 m frontage438.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2009

    Needs a closer look

    Still open in the City's records: 10 302223 (Imperial Oil Esso Fire alarm replacement, 2011, status Permit Issued); 09 143310 (Proposed installation of 9 backflow prevention device, 2009, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit17 213309Cancelled

    External fuel storage tank (120' * 48').

    Aug 9, 2017 · 1150 FINCH AVE W
  • Building permit15 102739Closed

    Replace existing and install Backflow Prevention Devices (Water only) there is just one bathroom

    Jan 15, 2015 · 1150 FINCH AVE W
  • Building permit14 131240Closed

    Interior Alterations to the kitchen and washroom renovation to Imperial Oil 45m2

    Mar 27, 2014 · 1150 FINCH AVE W
  • Zoning review11 212094 ZPUClosed
    Jun 7, 2011 · 1150 FINCH AVE W
  • Building permit11 197874Closed

    Backflow preventer for imperial oil limited.

    Jun 2, 2011 · 1150 FINCH AVE W
  • Building permit10 302223Permit Issued

    Imperial Oil Esso Fire alarm replacement

    Feb 15, 2011 · 1150 FINCH AVE W
  • Building permit09 143310Inspection

    Proposed installation of 9 backflow prevention device

    Jun 19, 2009 · 1150 FINCH AVE W
  • Building permit01 190392Closed

    REMOVE HALON FIRE SUPRESSION SYSTEM.

    Nov 20, 2001 · 1150 FINCH AVE W
Show 1 older records
  • Building permit01 190388Closed

    REMOVE HALON FIRE SUPRESSION SYSTEM AND INSTALL SPRINKLERS IN BASEMENT.

    Nov 20, 2001 · 1150 FINCH AVE W

Check before you build

  • Site-specific exception 900.22.10(45)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.22.10(45)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625. © City of Toronto 1998-2026

By-law 569-2013, Chapter 900

Lot facts

Area
103,827 m²
Frontage
267.9 m
Depth
438.2 m
Street
Alexdon Rd
Corner lot
Yes, also on Finch Ave W438.2 m along it
Public lane
None
House footprint
5,727 m²roof up to 8.9 m
Back yard
103.6 mhouse to rear lot line
Side yards
50 m and 95.5 mhouse to side lot lines
Buildings on the lot
18house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone EH 1.0 (x45) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: honey locust (10 cm), honey locust skyline (8 cm), honey locust skyline (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Closed

    1181 FINCH AVE W · Jul 21, 2026 · 277 m away
  • Building permit

    Proposed interior alteration adding partitions, new HVAC and change of use

    1181 FINCH AVE W · Apr 28, 2026 · 277 m away
  • Zoning review

    Closed

    1183 FINCH AVE W · Apr 29, 2024 · 218 m away
  • Zoning review

    Closed

    1181 FINCH AVE W · Feb 22, 2024 · 277 m away
  • Development application

    Site Plan application proposing a one-storey industrial building with a GFA of 3,321.2 square metres and 417 parking spaces.

    1133 FINCH AVE W · Feb 20, 2024 · 288 m away · City file
  • Building permit

    To erect and display a third party electronic ground sign displaying electronic static copy. The proposal contains a combination of third party electronic static copy on sign faces measuring 2.91 metres vertically by 5.79 metres horizontally with a total sign face area of 16.85 square metres; and, first party static copy on sign faces measuring 1.57 metres vertically by 3.57 metres horizontally with a total sign face area of 5.60 square metres. Maximum height of the sign would be 10 metres.***PATTISON OUTDOOR ADVERTISING***

    1221 FINCH AVE W · Jun 20, 2022 · 275 m away
  • Zoning review

    Closed

    1221 FINCH AVE W · May 31, 2021 · 275 m away
  • Zoning review

    Closed

    1183 FINCH AVE W · Nov 25, 2019 · 218 m away
  • Zoning review

    Closed

    1185 FINCH AVE W · Apr 30, 2019 · 228 m away
  • Zoning review

    Closed

    1183 A FINCH AVE W · Nov 20, 2017 · 275 m away

Neighbourhood: York University Heights

About the area around the lot, not the lot itself.

Nearest station
Finch West Station10 min walk
Nearest TTC stop
1150 Finch Ave West3 min walk
Nearest cycling route
Finch Ave WBike Lane - Buffered, 3 min walk
Nearest traffic count
14,142 vehicles in 8 hFinch Ave W: Chesswood Dr - Alexdon Rd, 170 m away, Nov 22, 2023
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Four Winds Allotment Gardens14 min walk
Jack Evelyn Wiggins Park16 min walk

Schools within 1 km

  • BAIS CHAYA MUSHKA ELEMENTARY SCHOOL Private 14 min walk
  • JAMES CARDINAL MCGUIGAN CATHOLIC HIGH SCHOOL English Separate 15 min walk
  • NYGH OUTPATIENT AND COMMUNITY SERVICES CENTRE/URBAN INTERNATIONAL Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYork University HeightsMedian neighbourhood
Median household income (2020)$76,000$84,500
Households that own their home47%54%
Population (2021)28,25516,813
Homes built in 1960 or before14%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYork University HeightsCity median
Assault1274.1636.3
Robbery12869.5
Shootings11.910.5
Auto theft634.1192.6
Theft over $5,000178.646.1
Break and enter375.1172.8
Theft from vehicles312.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.