HousePrecheckCheck an address

115 Roosevelt RdToronto · zoning, lot size and permit records

Also 523 Cosburn Ave, 525 Cosburn Ave

Open space · OR121.7 × 84.2 m10,228 m²on Roosevelt Rd

Not a home

Toronto East Health Network Parking Lot

The City of Toronto's real estate inventory lists Toronto East Health Network Parking Lot here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
121.7 m frontage84.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    10,228 m²
    Frontage
    121.7 m
    Depth
    84.2 m
    Street
    Roosevelt Rd
    Corner lot
    No
    Public lane
    None
    House footprint
    174 m²roof up to 9.9 m
    Back yard
    16.3 mhouse to rear lot line
    Side yards
    40.7 m and 71.8 mhouse to side lot lines
    Buildings on the lot
    3house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

    Around this lot

    Minor variances approved
    87%47 of 54 decisions
    Garden suite permits
    2
    Laneway suite permits
    0
    Multiplex permits
    2
    Development applications
    0

    Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 54 variance decisions: more than at 88% of Toronto houses (median 19).

    Latest activity nearby

    • Minor variancePending

      To construct a new two-storey detached dwelling with a front integral garage (with a one-car parking space in the basement level), a front covered porch with stairs, a rear basement walkout, a rear covered ground floor deck with stairs and a rear second floor balcony.

      62 LANKIN BLVD · Dec 16, 2026 · 197 m away
    • Building permitdemolition

      Proposal to demolish existing 1-storey dwelling and to construct a new 2-storey single family dwelling

      47 LANKIN BLVD · Nov 25, 2026 · 183 m away
    • Zoning review

      Not Started

      478 COSBURN AVE · Nov 20, 2026 · 299 m away
    • Building permitnew building, new house

      Revision 01: Structural revision to building permit (permit no. 26 169652 BLD 00 NH)Proposal to construct a 2-storey with a basement walkout, rear deck, front porch and integral garage.

      47 LANKIN BLVD · Nov 17, 2026 · 183 m away
    • Building permit

      backwater valve installation

      122 ROOSEVELT RD · Sep 25, 2026 · 84 m away
    • Zoning review

      Application On Hold

      478 COSBURN AVE · Sep 18, 2026 · 299 m away
    • Building permit

      Backwater valve installation.

      122 ROOSEVELT RD · Sep 15, 2026 · 84 m away
    • Zoning review

      Notice Sent

      62 LANKIN BLVD · Sep 8, 2026 · 197 m away
    • Building permit

      Proposal for interior alterations to existing SFD detached.

      349 MONARCH PARK AVE · Sep 8, 2026 · 263 m away
    • Building permit

      BACK WATER VALVE INSTALL

      902 D COXWELL AVE · Aug 27, 2026 · 197 m away

    Neighbourhood: Danforth East York

    About the area around the lot, not the lot itself.

    Nearest station
    Coxwell Station18 min walk
    Nearest TTC stop
    Cosburn Ave at Roosevelt Rd East Side1 min walk
    Nearest cycling route
    Cosburn AveBike Lane, 1 min walk
    Nearest traffic count
    963 vehicles in 8 hMemorial Park Ave / Durant Ave, 140 m away, Sep 26, 2007
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Cosburn Park1 min walk
    True Davidson Park1 min walk
    Dieppe Park6 min walk

    Schools within 1 km

    • COSBURN MDL SCHOOL English Public 2 min walk
    • DIEFENBAKER ELEMENTARY SCHOOL English Public 4 min walk
    • EAST YORK COLLEGIATE INSTITUTE English Public 5 min walk
    • R H MCGREGOR ELEMENTARY SCHOOL English Public 7 min walk
    • EAST YORK ALTERNATIVE SECONDARY SCHOOL English Public 7 min walk
    • ECOLE ELEMENTAIRE LA MOSAIQUE French Public 10 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureDanforth East YorkMedian neighbourhood
    Median household income (2020)$101,000$84,500
    Households that own their home69%54%
    Population (2021)17,06516,813
    Homes built in 1960 or before69%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleDanforth East YorkCity median
    Assault434.5636.3
    Robbery10.969.5
    Shootings10.910.5
    Auto theft184.7192.6
    Theft over $5,00021.746.1
    Break and enter86.9172.8
    Theft from vehicles239188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.