Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register13 development applications open within 300 m
Good to know13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
2 records on file: more than at 72% of Toronto houses (median 0).
- Building permit20 123271Closed
Proposal for a temporary greenhouse is being erected in the park. It has been adapted to house a sculptural artwork. The greenhouse is not inhabited and is not open to the public - it is locked and is experienced visually from the outside. Erected from May 12 to Sept 18, 2020
Apr 14, 2020 · 115 KING ST E - Building permit19 147203Cancelled
Proposal for a temporary greenhouse is being erected in the park. It has been adapted to house a sculptural artwork. The greenhouse is not inhabited and is not open to the public - it is locked and is experienced visually from the outside.
Apr 30, 2019 · 115 KING ST E
Check before you build
Site-specific exception 900.40.10(197)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
On 115 King St. E., former City of Toronto by-law 70-90.
Lot facts
- Area
- 688 m²
- Frontage
- 23.9 m
- Depth
- 29.3 m
- Street
- King St E
- Corner lot
- No
- Public lane
- Oak Hall Lane, 23.6 m along it
- House footprint
- 49 m²roof up to 11.6 m
- Back yard
- 7.9 mhouse to rear lot line
- Side yards
- 0.1 m and 19.6 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 23 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone O (x197) (Open Space). Chapter 90, section 90.10 of the by-law. Source
- 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust (36 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 89%8 of 9 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 24
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Zoning review
Application On Hold
91 FRONT ST E · Nov 24, 2026 · 166 m away - Building permit
Proposal for interior alteration to existing office suites 208, 216, 230 and 306
56 THE ESPLANADE · Nov 23, 2026 · 294 m away - Building permit
Revision No.1: New Fire Shutter Window
30 ADELAIDE ST E · Nov 20, 2026 · 290 m away - Building permit
Proposal for additions and interior alterations to existing Nightclub at 17-19 Toronto St.
19 TORONTO ST · Nov 16, 2026 · 208 m away - Building permit
Revision 01 - due site conditions and landlord repairsProposed interior alterations and repairs due to fire damage.
47 COLBORNE ST · Nov 9, 2026 · 141 m away - Zoning review
Not Started
100 LOMBARD ST · Nov 6, 2026 · 282 m away - Building permit
UNIT 301 INTERIOR NON-STRUCTURAL PARTITION DEMOLITION
47 COLBORNE ST · Nov 6, 2026 · 141 m away - Building permit
REV 01: Revision to permit to combine the two existing all gender washrooms into oneProposal for interior alterations for tenant fit out to existing unit. Unit 300
41 FRONT ST E · Nov 6, 2026 · 231 m away - Building permit
REVISION- 03Rev 02 - Scope clarified and simplified for future tenant (Back to Base project with plumbing rough-ins). Build out of future space by others (under separate future permit).REVISION 01:Interior alterations - back to base building - group A occupancy
71 FRONT ST E · Nov 5, 2026 · 148 m away - Building permit
Proposal for iInterior alterations to a group D office building - UNIT 400
47 COLBORNE ST · Nov 4, 2026 · 141 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- King Station6 min walk
- Nearest TTC stop
- King St East at Church St East Side1 min walk
- Nearest cycling route
- Adelaide St ECycle Track, 3 min walk
- Nearest traffic count
- 6,090 vehicles in 8 hKing St E / Church St, 60 m away, Jun 29, 2023
- Serious collisions within 500 m
- 122021–2026, killed or seriously injured: 2 fatal, 7 with pedestrians, 2 with cyclists
- Parks
- Toronto Sculpture Garden1 min walk
- St. James Park1 min walk
- Market Lane Park1 min walk
Schools within 1 km
- KEYSTONE INTERNATIONAL SCHOOLS Private 3 min walk
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 5 min walk
- VICTORIA STREET LINC English Public 6 min walk
- DOWNTOWN ALTERNATIVE SCHOOL English Public 6 min walk
- ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 6 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 11 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.