HousePrecheckCheck an address

115 Eighth StToronto · zoning, lot size and permit records

Residential multiple · RM (u4; d0.6) (x23)15.2 × 38.1 m580 m²on Eighth St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 10 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 1 development application open within 300 m, up to 9 storeysNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
  • City upkeep score: 85 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N10 m
15.2 m frontage38.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 171953 000 00 IR (Adequate Heat, 2026); 26 171952 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 9 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 85 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (3 storeys, 10 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • By-law investigation26 263141 WST 00 IRClosed

    Waste

    Oct 31, 2026 · 115 EIGHTH ST
  • By-law investigation26 171953 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 115 EIGHTH ST
  • By-law investigation26 171952 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 115 EIGHTH ST

Check before you build

  • Site-specific exception 900.6.10(23)

    Needs a closer look

    4 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(23)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum lot area is: (i) 230 square metres for a detached house ; (ii) 460 square metres for a semi-detached house ; (iii) 555 square metres for a duplex ; and (iv) 610 square metres for a triplex

  2. Rule B

    The minimum lot frontage is: (i) 7.5 metres for a detached house ; (ii) 15.0 metres for a semi-detached house or duplex ; and (iii) 16.5 metres for a triplex

  3. Rule C

    The maximum building height is 9.5 metres for a detached house

  4. Rule D

    The minimum side yard setback is: (i) 0.6 metres for a detached house , (ii) 1.2 metres for a semi-detached house , duplex , or triplex ; and (iii) 1.5 metres from a side lot line abutting a street for a detached house , semi-detached house , duplex , or triplex on a corner lot .

By-law 569-2013, Chapter 900

Lot facts

Area
580 m²
Frontage
15.2 m
Depth
38.1 m
Street
Eighth St
Corner lot
No
Public lane
None
House footprint
267 m²roof up to 17.9 m
Back yard
10.1 mhouse to rear lot line
Side yards
0.5 m and 3.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone RM (u4; d0.6) (x23) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source

Around this lot

Minor variances approved
90%38 of 42 decisions
Garden suite permits
4
Laneway suite permits
3
Multiplex permits
6
Development applications
1

Within 300 m, last 10 years. 13 suite and multiplex permits: more than at 80% of Toronto houses (median 3). 42 variance decisions: more than at 77% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0036/23EYK) approved variances related to floor space index and exterior main wall height.

    99 THIRTEENTH ST · Mar 26, 2026 · 465 m away
  • Minor varianceApproved

    To legalize and to maintain an enclosed second storey front platform, to construct a second storey rear addition, and to convert the existing dwelling into a duplex.

    115 TENTH ST · Nov 20, 2025 · 194 m away
  • Minor varianceApproved

    To enclose the existing front porch.

    16 EIGHTH ST · Nov 20, 2025 · 393 m away
  • Minor varianceRefused

    To construct a new duplex with an attached garage.

    62 SEVENTH ST · Jun 12, 2025 · 256 m away
  • Minor varianceApproved

    To construct a new duplex with an attached garage.

    38 THIRD ST · May 1, 2025 · 429 m away

Latest activity nearby

  • Zoning review

    Notice Sent

    94 FIFTH ST · Nov 3, 2026 · 253 m away
  • Building permit

    Proposal fo interior alterations to an existing vacant unit on the ground floor for new dental clinic.Convenience address is 2955 Lake Shore Blvd W

    2953 LAKE SHORE BLVD W · Oct 22, 2026 · 81 m away
  • Building permit

    Proposal to repair front porch

    125 SIXTH ST · Oct 9, 2026 · 182 m away
  • Building permit

    REV01: Proposal for enlarged basement underpinning. Proposed interior alteration to create new basement commercial unit (personal service shop) #2884B and front entrance. Proposed small addition at rear.Proposal for basement underpinning of commercial unit basement.

    2884 LAKE SHORE BLVD W · Oct 5, 2026 · 233 m away
  • Building permit

    Replace existing mudroom/back entry with one slightly larger to include a small main floor powder room and walk-in closet.

    112 FIFTH ST · Sep 3, 2026 · 234 m away
  • Building permit

    Repair and extend current deck and add low level deck approx. 1ft above grade.

    99 B NINTH ST · Aug 12, 2026 · 117 m away
  • Building permit

    Enlarged basement underpinning. Creation of new basement commercial office unit #2884B and front entrance.

    2884 LAKE SHORE BLVD W · Jun 18, 2026 · 233 m away
  • Building permit

    Proposed new accessible elevator and elevator lobby addition to the existing place of worship.

    100 TENTH ST · May 29, 2026 · 254 m away
  • Building permit

    Proposal to construct a second and third storey addition atop existing dwelling.

    84 TENTH ST · May 27, 2026 · 255 m away
  • Building permitlaneway suite

    To construct a rear laneway suite behind the existing apartment building of 8 units.

    149 SIXTH ST · May 13, 2026 · 290 m away

Neighbourhood: New Toronto

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station32 min walk
Nearest TTC stop
Lake Shore Blvd West at Seventh St2 min walk
Nearest cycling route
Birmingham StCycle Track, 6 min walk
Nearest traffic count
15,763 vehicles in 14 hIslington Ave / Lake Shore Blvd W / Seventh St, 120 m away, Jun 19, 2024
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Lakeshore Village Park5 min walk
Jordon Carter Memorial Park5 min walk
Lamp Ground6 min walk

Schools within 1 km

  • SEVENTH STREET JR SCHOOL English Public 2 min walk
  • CHILDREN'S URBAN ENRICHMENT STUDIO Private 3 min walk
  • ST JOSAPHAT CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • SECOND STREET JR MDL SCHOOL English Public 10 min walk
  • THE HOLY TRINITY SCHOOL English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNew TorontoMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home44%54%
Population (2021)11,34516,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNew TorontoCity median
Assault903.2636.3
Robbery76.569.5
Shootings15.310.5
Auto theft145.4192.6
Theft over $5,00091.946.1
Break and enter183.7172.8
Theft from vehicles244.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.