Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 115 Cottingham St
115 Cottingham St is on a 5.9 m by 31.2 m lot on Cottingham St in Yonge-St.Clair. The zoning is R. A site-specific exception, 900.2.10(745), changes some of the usual rules for this address.
The City has 3 records on this lot since 2013. That is more than at 81% of Toronto houses. In 2017, a building permit was filed: "Interior structural alterations on the main floor". Status: closed. In 2017, a building permit was filed: "Replace fixtures on 3rd floor w/c with laundry closet". Status: closed. In 2013, a building permit was filed: "Proposal to install back water valve in existing semi detached single family dwelling". Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Summerhill station is a 8-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Site-specific exception 900.2.10(745)Moderate
- No permit for a second unit on fileLowFree check
- 2 City trees in front of this lotLowFree check
- Yonge-St. Clair Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
City files on this lot
3 records on file, more than at 81% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2017-05-01 | Building permit17 150348 | Interior structural alterations on the main floor | Closed | |
| 2017-03-06 | Building permit17 124991 | replace fixtures on 3rd floor w/c with laundry closet | Closed | |
| 2013-08-21 | Building permit13 224250 | Proposal to install back water valve in existing semi detached single family dwelling. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(745)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(745)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Yonge-St. Clair Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(745)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Secondary suite: likely fits
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x745)
- Height limit
- 12 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 79 m²
- Back yard
- 6.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 4 development applications within 300 m in 10 years, none open
- In the Summerhill station area
- 9 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
- Break and enter: 2.2 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-St.Clair neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Summerhill StationNearest station8 min walk
- Avenue Rd at Cottingham StNearest TTC stop3 min walk
- Ramsden Park TrlNearest cycling route6 min walk
- Cottingham Jr Public SchoolSchool2 min walk
- De Lasalle College SchoolSchool5 min walk
- The Mabin SchoolSchool9 min walk
- The York School - Mdl and Sr CampusSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3270.8
- Robberycity median 69.525.8
- Auto theftcity median 192.664.5
- Theft over $5,000city median 46.132.2
- Break and entercity median 172.8374
- Theft from vehiclescity median 188.1116.1
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist