HousePrecheckCheck an address

1138 Finch Ave WToronto · zoning, lot size and permit records

Employment · EH 1.0 (x45)240.5 × 319.8 m68,501 m²on Finch Ave Wcorner, also on Chesswood Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 23 220872 (A new automated slide gate valve will be installed inside manhole MH-01 on the 18" outl..., 2023, status Permit Issued); 09 185875 (Bridge to support piping between pump bay and load rack - Suncor, 2009, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 4 storeysNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
N50 m
240.5 m frontage319.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 building permits open, the oldest since 2009

    Needs a closer look

    Still open in the City's records: 23 220872 (A new automated slide gate valve will be installed inside manhole MH-01 on the 18" outl..., 2023, status Permit Issued); 09 185875 (Bridge to support piping between pump bay and load rack - Suncor, 2009, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 4 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit26 215584Closed

    Proposed installation of a pre-fabricated, non-occupied building that will house electrical equipment for the continued operation of the fuel distribution terminal.

    Sep 17, 2026 · 1138 FINCH AVE W
  • Zoning review26 154380 ZAPClosed
    May 4, 2026 · 1138 FINCH AVE W
  • Building permit23 220872Permit Issued

    A new automated slide gate valve will be installed inside manhole MH-01 on the 18" outlet drainage line on the stormwater system.

    Nov 24, 2023 · 1138 FINCH AVE W
  • Building permit09 188415Closed

    Revision to piping. (Modification to existing backflow preventer device piping)

    Nov 5, 2014 · 1138 FINCH AVE W
  • Building permit12 126697Closed

    To erect and display one double-sided, illuminated ground sign and one non-illuminated wall sign, in conjunction with an energy company. **Suncor**

    Apr 20, 2012 · 1138 FINCH AVE W
  • Building permit09 185875Inspection

    Bridge to support piping between pump bay and load rack - Suncor

    Dec 7, 2009 · 1138 FINCH AVE W
  • Building permit09 179134Closed - Dormant

    Installing man door to fire water pump house

    Nov 9, 2009 · 1138 FINCH AVE W
  • Building permit09 178955Closed - Dormant

    Install backflow prevention device

    Nov 9, 2009 · 1138 FINCH AVE W
Show 2 older records
  • Building permit09 170055Closed
    Sep 23, 2009 · 1138 FINCH AVE W
  • Building permit05 165234Closed

    2 trailers each 42 X 12'

    Nov 17, 2005 · 1138 FINCH AVE W

Check before you build

  • Site-specific exception 900.22.10(45)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.22.10(45)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625. © City of Toronto 1998-2026

By-law 569-2013, Chapter 900

Lot facts

Area
68,501 m²
Frontage
240.5 m
Depth
319.8 m
Street
Finch Ave W
Corner lot
Yes, also on Chesswood Dr319.8 m along it
Public lane
None
House footprint
1,626 m²roof up to 17.4 m
Back yard
191.7 mhouse to rear lot line
Side yards
29 m and 165.9 mhouse to side lot lines
Buildings on the lot
16house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone EH 1.0 (x45) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To operate as a cannabis infused bottling facility.

    155 MARTIN ROSS AVE · Jun 11, 2020 · 491 m away
  • Minor varianceApproved

    To construct a second floor addition above the existing one-storey building.

    79 BRISBANE RD · Apr 20, 2017 · 455 m away

Latest activity nearby

  • Minor variancePending

    To construct a four-storey self-storage facility. A Site Plan Control application (File No. 18 261350 NNY 08 SA) for the proposed development is currently under review.

    1125 FINCH AVE W · Nov 26, 2026 · 274 m away
  • Zoning review

    Not Started

    1125 FINCH AVE W · Nov 25, 2026 · 274 m away
  • Consent (lot split)Pending

    In Process

    1125 FINCH AVE W · Nov 20, 2026 · 274 m away
  • Consent (lot split)Pending

    Cancelled

    1125 FINCH AVE W · Nov 20, 2026 · 274 m away
  • Building permit

    Proposed installation of a pre-fabricated, non-occupied building that will house electrical equipment for the continued operation of the fuel distribution terminal.

    1138 FINCH AVE W · Sep 17, 2026 · 155 m away
  • Building permit

    Revision 01- Relocate barrier free washroom to ground floor with slight revision on the second floor.no other changes other than the relcation and minor revisions on the two washrooms.

    1111 A FINCH AVE W · Jun 15, 2026 · 283 m away
  • Development application

    The proposed development to build a Class A, 4-storey self-storage facility offering approximately 14.787 sq. m of GFA and approximately 1,450 climate-controlled storage units. The facility features 3 accessible loading docks, drive up units, 19 parking stalls.

    1125 FINCH AVE W · Jun 11, 2026 · 279 m away · City file
  • Zoning review

    Closed

    1138 FINCH AVE W · May 4, 2026 · 155 m away
  • Zoning review

    Closed

    1126 FINCH AVE W · Apr 14, 2026 · 159 m away
  • Zoning review

    Closed

    1110 FINCH AVE W · Mar 19, 2026 · 299 m away

Neighbourhood: York University Heights

About the area around the lot, not the lot itself.

Nearest station
Finch West Station18 min walk
Nearest TTC stop
Finch Ave West at Chesswood Dr West Side3 min walk
Nearest cycling route
Finch Corridor TrlMulti-Use Trail, 3 min walk
Nearest traffic count
11,080 vehicles in 8 hFinch Ave W / Chesswood Dr, 200 m away, Nov 18, 2023
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
G. Ross Lord Park15 min walk
Trca Lands ( 78)15 min walk

Schools within 1 km

  • NYGH OUTPATIENT AND COMMUNITY SERVICES CENTRE/URBAN INTERNATIONAL Private 8 min walk
  • BAIS CHAYA MUSHKA ELEMENTARY SCHOOL Private 14 min walk
  • BRIGHT START ACADEMY SCHOOL Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYork University HeightsMedian neighbourhood
Median household income (2020)$76,000$84,500
Households that own their home47%54%
Population (2021)28,25516,813
Homes built in 1960 or before14%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYork University HeightsCity median
Assault1274.1636.3
Robbery12869.5
Shootings11.910.5
Auto theft634.1192.6
Theft over $5,000178.646.1
Break and enter375.1172.8
Theft from vehicles312.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.