HousePrecheckCheck an address

1134 Queen St EToronto · zoning, lot size and permit records

15.2 × 31.0 m466 m²on Queen St E

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 25 195069 (Proposed new construction on vacant lot new 3 storey building with no underground level..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
N10 m
15.2 m frontage31.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 195069 (Proposed new construction on vacant lot new 3 storey building with no underground level..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 3 Committee of Adjustment files on this lot

    Good to know

    1 approved. A0905/14TEY (2014); A0690/10TEY (To construct a three-storey mixed-use building on the vacant lot, 2010); A0418/08TEY (CLOSED FILE - JULY 3, 2009 - ISSUED REFUND FEE LESS$100 NO NOTICE MAILED - NO INSTRUCTI..., 2008).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

22 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 195069Inspectionnew building

    Proposed new construction on vacant lot new 3 storey building with no underground level, commercial on the ground floor and a total of 10 residential units on 2 &3.

    Jan 26, 2026 · 1134 QUEEN ST E
  • By-law investigation25 167648 GRA 00 IRClosed

    Graffiti

    May 29, 2025 · 1134 QUEEN ST E
  • Zoning review25 152175 ZAPClosed
    May 1, 2025 · 1134 QUEEN ST E
  • By-law investigation25 141529 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to bags, wood, metal, household wast

    Apr 2, 2025 · 1134 QUEEN ST E
  • By-law investigation25 138160 WST 00 IRClosed

    Waste

    Apr 2, 2025 · 1134 QUEEN ST E
  • Development application25 127570 STE 14 OZClosed

    Zoning By-Law Amendment - Lifting of the H Symbol for a 6-storey mixed use building of 29 dwelling units. The building will contain approximately 1,996 square metres of gross floor area including 274 square metres. of non-residential uses approved in application 23 198001 STE 14 OZ.

    Mar 11, 2025 · 1134 QUEEN ST E · City file
  • Zoning review23 235802 LPRClosed
    Dec 14, 2023 · 1134 QUEEN ST E
  • Zoning review23 198007 PSPClosed
    Sep 11, 2023 · 1134 QUEEN ST E
Show 14 older records
  • Zoning review23 198001 PRZClosed
    Sep 11, 2023 · 1134 QUEEN ST E
  • Development application23 198001 STE 14 OZClosed

    Proposed 6-storey mixed use building of 29 dwelling units. The building will contain approximately 1,996 square metres of gross floor area including 274 square metres. of non-residential uses.

    Sep 5, 2023 · 1134 QUEEN ST E · City file
  • Zoning review19 153872 ZPRClosed
    May 14, 2019 · 1134 QUEEN ST E
  • Minor varianceA0905/14TEYPending
    Nov 19, 2014 · 1134 QUEEN ST E
  • Zoning review14 136312 ZPRClosed
    Apr 1, 2014 · 1134 QUEEN ST E
  • Building permit12 111250Cancellednew building

    Proposal to construct a 3 sty building with 14 residential (rental) units and future restaurant on ground floor. See COA, Site Plan, and PPR.

    Jan 24, 2012 · 1134 QUEEN ST E
  • Minor varianceA0690/10TEYApproved

    To construct a three-storey mixed-use building on the vacant lot.

    Nov 3, 2010 · 1134 QUEEN ST E
  • Zoning review08 206982 PSPClosed
    Sep 25, 2008 · 1134 QUEEN ST E
  • Development application08 201298 STE 30 SAClosed

    Site Plan Approval for a new three-storey mixed use building containing 14 residential units and retail at grade.

    Sep 8, 2008 · 1134 QUEEN ST E
  • Minor varianceA0418/08TEYPending

    CLOSED FILE - JULY 3, 2009 - ISSUED REFUND FEE LESS$100 NO NOTICE MAILED - NO INSTRUCTION FROM APPLICANT WAS Pending revisions to plans based on first round of SPA comments. DO NOT schedule. Oct 29/08 EC J. Kimont (Comm Planning) is assigned SPA planner.

    Feb 15, 2008 · 1134 QUEEN ST E
  • Zoning review07 111091 LPRClosed
    Feb 22, 2007 · 1134 QUEEN ST E
  • Zoning review06 194371 ZPRClosed
    Nov 27, 2006 · 1134 QUEEN ST E
  • Zoning review04 120121 LTOClosed
    Mar 29, 2004 · 1134 QUEEN ST E
  • Zoning review88 030776 LTOClosed
    Nov 1, 1988 · 1134 QUEEN ST E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
466 m²
Frontage
15.2 m
Depth
31 m
Street
Queen St E
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: pear chanticleer (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
94%68 of 72 decisions
Garden suite permits
1
Laneway suite permits
12
Multiplex permits
7
Development applications
4

Within 300 m, last 10 years. 20 suite and multiplex permits: more than at 88% of Toronto houses (median 3). 72 variance decisions: more than at 97% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition, and a rear three-storey addition with a front covered porch, a rear basement walkout, a rear ground floor deck with stairs, and two rear juliet balconies. Also, to construct a new rear one-storey ancillary building (one-car garage), abutting Dundas Street East. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first, second, and third levels).

    99 DAGMAR AVE · Oct 7, 2026 · 439 m away
  • Minor varianceApproved

    To legalize and to maintain the structural framing that was constructed beyond the limits of the authorized building permit (Permit No. 23 237183 BLD 01 SR). Minor Variance Decision A1132/22TEY approved a three-storey side addition, a two-storey rear addition, a complete third storey addition with a rear balcony, a new front porch and walkway, a new rear deck and stairs, and a rear basement walkout. Also, to demolish the existing one-storey ancillary building (detached garage), in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot (one unit within the basement, and one unit to occupy the first, second, and third floors).

    68 CAROLINE AVE · Sep 9, 2026 · 194 m away
  • Minor varianceApproved

    To construct a new detached four-storey apartment building (containing seven residential dwelling units) with a front entrance with stairs, a side (north) covered entrance with stairs, a rear ground floor entrance with stairs and a partially enclosed waste storage in the front yard. Also, to construct a rear detached two-storey ancillary building (containing one laneway suite) with a rear (west) covered entrance and one visitor parking space, abutting the laneway. Further, to construct a rear one-storey detached ancillary building (containing 12 bicycle parking spaces). There will be a total of eight residential dwelling units (seven units within the main dwelling and one unit within the laneway suite) on this lot.

    58 JONES AVE · Sep 9, 2026 · 190 m away
  • Minor varianceApproved

    To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.

    12 AUDLEY AVE · Aug 5, 2026 · 428 m away
  • Minor varianceApproved

    To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).

    64 BROOKLYN AVE · Jul 15, 2026 · 245 m away

Latest activity nearby

  • Minor variancePending

    To construct a new one-storey detached ancillary building (containing a one-car garage), in the rear yard, abutting the laneway.

    111 CAROLINE AVE · Dec 2, 2026 · 84 m away
  • Minor variancePending

    To construct a new two-storey detached ancillary building (containing a one-car garage, and an exterior staircase that will lead to a rooftop deck), in the rear yard, abutting the laneway.

    27 BROOKLYN AVE · Nov 25, 2026 · 142 m away
  • Building permit

    Proposal for exterior main line backwater valve

    64 COADY AVE · Nov 23, 2026 · 206 m away
  • Building permitsecondary suite

    rev 01: Rear Addition: Depth increased from 13' to approximately 13'-7" as-built, resulting in a 2.0 SQ.M GFA increase for the main and second floors. North Setback Encroachment: Addition projects approximately 3" into the North side setback, resulting in a total GFA increase of 1.0 SQ.M across the main, second, and third floors. Proposal for 3 storey rear addition, 3rd storey addition, basement secondary suite and interior alterations

    68 CAROLINE AVE · Oct 26, 2026 · 194 m away
  • Building permit

    Supply and install main sanitary back water valve

    25 WINNIFRED AVE · Oct 23, 2026 · 277 m away
  • Building permit

    Structural fire damage restoration - to the interior and roof

    41 RUSHBROOKE AVE · Oct 20, 2026 · 294 m away
  • Building permit

    Proposed interior alterations to convert an existing Garage Repair (Group F2) to a Restaurant (Group E).

    1001 QUEEN ST E · Oct 14, 2026 · 298 m away
  • Zoning review

    Notice Sent

    45 JONES AVE · Oct 13, 2026 · 191 m away
  • Building permit

    Proposed party wall admin permit related to 14 Blong Ave

    16 BLONG AVE · Oct 6, 2026 · 261 m away
  • Building permit

    1 Wall Sign*****Scotia Bank*****

    1046 QUEEN ST E · Sep 23, 2026 · 279 m away

Neighbourhood: South Riverdale

About the area around the lot, not the lot itself.

Nearest station
Pape Station34 min walk
Nearest TTC stop
Queen St East at Caroline Ave1 min walk
Nearest cycling route
Jones AveBike Lane, 2 min walk
Nearest traffic count
6,777 vehicles in 8 hQueen St E / Larchmount Ave, 30 m away, Sep 3, 2014
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 0 with cyclists
Parks
Leslie Grove Park1 min walk
58 Curzon Street Park5 min walk
Hideaway Park5 min walk

Schools within 1 km

  • BRUCE JR PUBLIC SCHOOL English Public 3 min walk
  • ST JOSEPH CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • MORSE STREET JR PUBLIC SCHOOL English Public 8 min walk
  • LESLIEVILLE JR PUBLIC SCHOOL English Public 9 min walk
  • RIVERDALE COLLEGIATE INSTITUTE English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth RiverdaleMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)27,81516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth RiverdaleCity median
Assault828.7636.3
Robbery69.369.5
Shootings3.210.5
Auto theft217.4192.6
Theft over $5,00088.246.1
Break and enter264.7172.8
Theft from vehicles349.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.