HousePrecheckCheck an address

1130 Dupont StToronto · zoning, lot size and permit records

Also 1132 Dupont St

Employment · EL 2.0 (x36)32.5 × 47.4 m1,493 m²on Dupont Stcorner, also on Gladstone Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 17 235090 (Proposal to install a backflow prevention device in an existing public hall/community c..., 2017, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 13 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
N20 m
32.5 m frontage47.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2017

    Needs a closer look

    Still open in the City's records: 17 235090 (Proposal to install a backflow prevention device in an existing public hall/community c..., 2017, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 13 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit17 235090Permit Issued

    Proposal to install a backflow prevention device in an existing public hall/community centre.

    Sep 27, 2017 · 1130 DUPONT ST
  • Zoning review01 035215 ZSVClosed
    Sep 12, 2001 · 1130 DUPONT ST
  • Building permit98 015888Closed

    INSTALL KITCHEN EXHAUST SYSTEM . BP

    May 13, 1998 · 1130 DUPONT ST
  • Building permit98 015500Closed - Dormant

    EXTEND 4"SANITARY DRAINS. INSTALL 1ST FLOOR:1GREASE INTERCEPTOR 1-3 COMPT SINK, 2 WB, 2-2 COMPT KS,1 DISHWASHER, 4 FD

    Apr 21, 1998 · 1130 DUPONT ST
  • Zoning review98 026006 LTOClosed
    Apr 20, 1998 · 1130 DUPONT ST
  • Building permit97 025064Closed

    MAKE INTERIOR ALTERTIONS TO CHANGE USE OF BUILDING. SEE COMMITTEE OF ADJUSTMENT DECISION. FINAL AND BINDING. EDC

    Jan 29, 1998 · 1130 DUPONT ST
  • Zoning review97 027222 LTOClosed
    Dec 31, 1997 · 1130 DUPONT ST

Check before you build

  • Site-specific exception 900.21.10(36)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.21.10(36)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands municipally known as 1130 and 1136 Dupont St. in 1981, a place of assembly that is a union hall, a medical office that is used for dentists, and a financial institution that is a credit union are permitted if these uses were in existence on the lands on March 12, 1981. [TO: 438-86; 12 (1) 150] Prevailing By-laws and Prevailing Sections: (None Apply)

  2. Older by-law A

    On the lands municipally known as 1130 and 1136 Dupont St. in 1981, a place of assembly that is a union hall, a medical office that is used for dentists, and a financial institution that is a credit union are permitted if these uses were in existence on the lands on March 12, 1981. [TO: 438-86; 12 (1) 150] Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
1,493 m²
Frontage
32.5 m
Depth
47.4 m
Street
Dupont St
Corner lot
Yes, also on Gladstone Ave47.4 m along it
Public lane
None
House footprint
1,231 m²roof up to 17.9 m
Back yard
4.2 mhouse to rear lot line
Side yards
0.2 m and 1.7 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone EL 2.0 (x36) (Employment Light Industrial). Chapter 60, section 60.10 of the by-law. Source

Around this lot

Minor variances approved
97%32 of 33 decisions
Garden suite permits
7
Laneway suite permits
3
Multiplex permits
11
Development applications
9

Within 300 m, last 10 years. 21 suite and multiplex permits: more than at 89% of Toronto houses (median 3). 33 variance decisions: more than at 67% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a personal service shop within the existing one-storey commercial building, and to reduce the required parking count.

    1250 DUPONT ST · Jul 28, 2021 · 360 m away
  • Minor varianceApproved

    To establish a vehicle dealership use on the property (Zoom Rentals).

    1286 DUPONT ST · Jul 17, 2019 · 490 m away
  • Minor varianceApproved

    To continue the use of the lower level of the subject lands as a sales or hire garage/ vehicle dealership for an interim period of time not exceeding two years.

    1110 DUPONT ST · Apr 26, 2017 · 60 m away
  • Minor varianceRefused

    To construct a 6-storey self-storage warehouse building.

    1120 DUPONT ST · Sep 9, 2015 · 37 m away

Latest activity nearby

  • Zoning review

    Closed

    1220-1226 DUPONT ST · Nov 19, 2026 · 285 m away
  • Zoning review

    Not Started

    209 GEARY AVE · Nov 12, 2026 · 68 m away
  • Minor variancePending

    To permit the existing restaurant use (eating establisment) and nightclub use within the existing one-storey commercial building with a mezzanine level. Also, to permit an outdoor patio in the front yard.

    209 GEARY AVE · Nov 2, 2026 · 68 m away
  • Zoning review

    Notice Sent

    165 GEARY AVE · Oct 26, 2026 · 154 m away
  • Zoning review

    Closed

    220 GEARY AVE · Oct 5, 2026 · 127 m away
  • Development application

    Under Review

    259 GEARY AVE · Sep 25, 2026 · 263 m away
  • Building permit

    Conditional Permit - Drain - Proposal to construct a new 8 storey self storage building with ground floor retail units and drive thru access

    259 GEARY AVE · Sep 1, 2026 · 247 m away
  • Building permit

    1 Overhanging Structure Sign2 Wall Sign*****Rexall*****

    1152 DUPONT ST · Aug 20, 2026 · 94 m away
  • Building permit

    1 Overhanging Structure Sign2 Wall Sign*****Rexall*****

    1152 DUPONT ST · Aug 5, 2026 · 94 m away
  • Building permit

    Proposal for interior alterations - Rexall

    1152 DUPONT ST · Jul 28, 2026 · 94 m away

Neighbourhood: Dovercourt Village

About the area around the lot, not the lot itself.

Nearest station
Dufferin Station15 min walk
Nearest TTC stop
Dupont St at Bartlett Ave1 min walk
Nearest cycling route
Bartlett AveBike Lane - Contraflow, 2 min walk
Nearest traffic count
12,398 vehicles in 8 hDupont St / Gladstone Ave, 40 m away, Jun 9, 2003
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Bristol Avenue Parkette East2 min walk
Bartlett Parkette2 min walk
Bristol Avenue Parkette West3 min walk

Schools within 1 km

  • DOVERCOURT JR PUBLIC SCHOOL English Public 5 min walk
  • ST MARY OF THE ANGELS CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • UCHENNA ACADEMY Private 8 min walk
  • REGAL ROAD JR PUBLIC SCHOOL English Public 9 min walk
  • ST ANTHONY CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • ST SEBASTIAN CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDovercourt VillageMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home55%54%
Population (2021)12,38016,813
Homes built in 1960 or before70%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDovercourt VillageCity median
Assault974.9636.3
Robbery68.669.5
Auto theft129.5192.6
Theft over $5,00022.946.1
Break and enter236.1172.8
Theft from vehicles144.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.