HousePrecheckCheck an address

1120 Bathurst StToronto · zoning, lot size and permit records

19.2 × 36.8 m696 m²on Bathurst Stbacks onto Ln W Bathurst N Dupont

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
N10 m
19.2 m frontage36.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Check before you build

    • Zoning not in By-law 569-2013

      Needs a closer look

      This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

      Zoning By-law 569-2013

    Lot facts

    Area
    696 m²
    Frontage
    19.2 m
    Depth
    36.8 m
    Street
    Bathurst St
    Corner lot
    No
    Public lane
    Ln W Bathurst N Dupont, 26.1 m along it
    Max height
    —
    Max lot coverage
    —

      Around this lot

      Minor variances approved
      89%17 of 19 decisions
      Garden suite permits
      0
      Laneway suite permits
      4
      Multiplex permits
      11
      Development applications
      5

      Within 300 m, last 10 years. 15 suite and multiplex permits: more than at 83% of Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).

      Recent variance decisions in the same zone

      • Minor varianceRefused

        To construct a new rear two-storey detached ancillary building (containing a garden suite) with a new rear walkway and two bicycle parking spaces in the rear yard. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit in the ancillary building). The existing two-storey ancillary building (shed) will be demolished.

        179 HOWLAND AVE · Oct 21, 2026 · 407 m away
      • Minor varianceRefused

        To alter the existing rear one-storey detached ancillary building (garage, abutting the laneway) by constructing an east side ground floor addition (including an access staircase) and a complete second storey addition. Also, to legalize and to maintain the concrete foundation walls which were constructed beyond an authorized building permit. This ancillary building will contain a two-car garage on the ground level, and one laneway suite on the second level. There will be a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building).

        908 MANNING AVE · Sep 2, 2026 · 433 m away
      • Minor varianceApproved

        To alter the existing two-storey townhouse dwelling by constructing a rear second storey addition (above the rear one-storey portion of the dwelling).

        871 PALMERSTON AVE · Jul 15, 2026 · 194 m away
      • Minor varianceApproved

        To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with stairs. The existing rear ground level deck will be demolished.

        60 OLIVE AVE · Jul 8, 2026 · 436 m away
      • Minor varianceRefused

        To alter the existing rear one-storey ancillary building (semi-detached garage, abutting the laneway) by constructing a complete second storey addition, and a two-storey addition at the east portion of the building, including a basement addition below. This ancillary building will contain a two-car garage on the ground level, and one laneway suite of the second level. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).

        908 MANNING AVE · Apr 1, 2026 · 433 m away

      Latest activity nearby

      • Minor variancePending

        To construct a new three-storey detached building (houseplex) with front and rear basement walkouts, front and rear ground floor porches with stairs, side (east) yard entrances on the ground floor, and front and rear second and third storey balconies. The second storey will be cantilevered at the east side of the main building. Also, to construct a new rear two-storey detached ancillary building containing one laneway suite with a basement level (storage), and a cantilevered second storey (south) with one surface parking space below, abutting the laneway. There will be a total of seven residential dwelling units on this lot (two units within the basement, two units on the ground floor, and two units occupying the second and third storeys of the main building and one unit within the ancillary building containing a laneway suite).

        541 DUPONT ST · Dec 16, 2026 · 278 m away
      • Building permit

        Commercial vehicle impact repairs

        468 DUPONT ST · Nov 20, 2026 · 82 m away
      • Zoning review

        Not Started

        843 PALMERSTON AVE · Nov 10, 2026 · 251 m away
      • Building permit

        Proposal for structural impact damage restoration.

        472 DUPONT ST · Nov 3, 2026 · 67 m away
      • Building permit

        Party wall admin permit related to 25-119818 BLD 00 SR.

        552 DUPONT ST · Oct 23, 2026 · 239 m away
      • Zoning review

        Cancelled

        420 DUPONT ST · Oct 19, 2026 · 209 m away
      • Zoning review

        Closed

        430 DUPONT ST · Oct 6, 2026 · 196 m away
      • Building permit

        Proposal for Party Wall Admin related to 871 Palmerston Ave.

        869 PALMERSTON AVE · Sep 28, 2026 · 205 m away
      • Building permit

        Proposal for a second floor addition and interior alterations

        871 PALMERSTON AVE · Sep 28, 2026 · 194 m away
      • Minor variancePending

        Cancelled

        541 DUPONT ST · Sep 25, 2026 · 278 m away

      Neighbourhood: Annex

      About the area around the lot, not the lot itself.

      Nearest station
      Dupont Station11 min walk
      Nearest TTC stop
      Bathurst St at Dupont St1 min walk
      Nearest cycling route
      Palmerston AveSharrows, 3 min walk
      Nearest traffic count
      35,280 vehicles in 14 hDupont St / Bathurst St, 70 m away, Jul 3, 2025
      Serious collisions within 500 m
      42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
      Parks
      Vermont Square Park3 min walk
      Cawthra Playground4 min walk
      The Tollkeeper's Park6 min walk

      Schools within 1 km

      • GEORGE BROWN COLLEGE - CASA LOMA CAMPUS College 7 min walk
      • ROYAL ST GEORGES COLLEGE SCHOOL - ADVANCEMENT Private 9 min walk
      • ROYAL ST GEORGE'S COLLEGE SCHOOL - JR SCHOOL Private 9 min walk
      • ROYAL ST GEORGES COLLEGE SCHOOL - MAIN ADDRESS Private 10 min walk
      • ROYAL ST GEORGES COLLEGE SCHOOL - SEE HOUSE Private 10 min walk
      • PALMERSTON AVENUE JR PUBLIC SCHOOL English Public 10 min walk

      Being near a school does not mean the lot is in its catchment; check with the board.

      2021 Census

      FigureAnnexMedian neighbourhood
      Median household income (2020)$85,000$84,500
      Households that own their home41%54%
      Population (2021)29,30016,813
      Homes built in 1960 or before40%29%
      Homes needing major repairs6%7%

      Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

      Police-reported crime, 2025

      Per 100,000 peopleAnnexCity median
      Assault1080.9636.3
      Robbery80.569.5
      Homicide5.25.3
      Shootings5.210.5
      Auto theft116.9192.6
      Theft over $5,000114.346.1
      Break and enter387.1172.8
      Theft from vehicles220.9188.1

      Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

      Something here not right?

      Sources

      • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
      • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
      • Development applications: Rezoning, site plan, subdivision and condominium applications.
      • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
      • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
      • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
      • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
      • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
      • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
      • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
      • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
      • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
      • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
      • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
      • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
      • Address points: loaded Nov 22, 2026, published Nov 20, 2026
      • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
      • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
      • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
      • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
      • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
      • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
      • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
      • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
      • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
      • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
      • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
      • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
      • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
      • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
      • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
      • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
      • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
      • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
      • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
      • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
      • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
      • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
      • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
      • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
      • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
      • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
      • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
      • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
      • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
      • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
      • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
      • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
      • School locations: loaded Oct 14, 2026, published May 27, 2026
      • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
      • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
      • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
      • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
      • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
      • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
      • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
      • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
      • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

      Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

      Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

      Flag an error

      What is not right?

      The problem

      The records come from the City's open data; we check each flag against them. Your email is used only to answer this.