HousePrecheckCheck an address

112 Tyndall AveToronto · zoning, lot size and permit records

Residential · R (d2.0) (x811)18.3 × 61.3 m1,119 m²on Tyndall Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 27 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 2 development applications open within 300 m, up to 10 storeysNew buildings may go up around here in the next years. More change nearby than at 95% of Toronto houses.
  • City upkeep score: 82 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
18.3 m frontage61.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 25 268717 PRS 00 IR (Property Standards, 2025); 25 191361 PRS 00 IV (Order Issued Property Standards: Guard is less than 1,070 millimetres high.; Height of..., 2025); 25 191344 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 10 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 82 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (3 storeys, 27 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • By-law investigation25 268717 PRS 00 IRClosed

    Property Standards

    Dec 21, 2025 · 112 TYNDALL AVE
  • By-law investigation25 191361 PRS 00 IVClosed

    Order Issued Property Standards: Guard is less than 1,070 millimetres high.; Height of handrail on stairs or ramp is less than the minimum 800mm; The stair guard when measured vertically from the stair nosing is less than 900 millimetres high.

    Jul 10, 2025 · 112 TYNDALL AVE
  • By-law investigation25 191344 PRS 00 IRClosed

    Property Standards

    Jul 10, 2025 · 112 TYNDALL AVE

Check before you build

  • Site-specific exception 900.2.10(811)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(811)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(7).

7 parts for other addresses
  • A On 256 Dufferin St. former City of Toronto by-law 330-93
  • B On 1251 King St. W., former City of Toronto by-laws 145-68, 256-68, and 346-68
  • C On or between the odd numbered addresses of 63-63A Spencer Ave., City of Toronto by-law 717-02
  • D On 65 Spencer Ave., City of Toronto by-law 1045-01
  • E On 85 Spencer Ave., former City of Toronto by-law 271-70
  • F On 8 Temple Ave., City of Toronto by-law 518-06
  • G On 151 Tyndall Ave., City of Toronto by-law 1044-01.
By-law 569-2013, Chapter 900

Lot facts

Area
1,119 m²
Frontage
18.3 m
Depth
61.3 m
Street
Tyndall Ave
Corner lot
No
Public lane
None
House footprint
565 m²roof up to 17.4 m
Back yard
3.1 mhouse to rear lot line
Side yards
1.7 m and 2.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
23 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone R (d2.0) (x811) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: maple, norway (61 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%23 of 23 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
24
Development applications
10

Within 300 m, last 10 years. 25 suite and multiplex permits: more than at 92% of Toronto houses (median 3). 23 variance decisions: more than at 54% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling (houseplex containing two residential dwelling units) by constructing a partial rear third storey addition with a rear balcony, a rear one-storey addition with a second storey balcony above, a rear ground floor deck with stairs, and a side (south) basement walkout. The two existing residential dwelling units will be maintained.

    68 DUNN AVE · Oct 7, 2026 · 431 m away
  • Minor varianceApproved

    To legalize and maintain a front entrance uncovered accessible ramp which was constructed without an authorized building permit, attached to the front porch of the existing two-storey detached building (hostel/shelter).

    78 SPRINGHURST AVE · May 13, 2026 · 469 m away
  • Minor varianceRefused

    To legalize and to maintain the exterior stairs leading to the rooftop platform, as well as the perimeter guardrails (around the roof of the existing rear one-storey detached ancillary building (detached garage abutting the laneway)), that were constructed without an authorized building permit.

    191 COWAN AVE · Apr 15, 2026 · 458 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling (a rooming house containing 6 dwelling rooms and 1 dwelling unit) by constructing a rear three-storey addition (containing 11 dwelling (studio) units). Also, to construct a one-storey ancillary structure (to contain waste storage and 5 long-term bicycle parking spaces) in the rear yard. There will be a total of 12 dwelling units and 6 dwelling rooms (for a total of 18) on this lot.

    72 MELBOURNE AVE · Apr 23, 2025 · 407 m away
  • Minor varianceApproved

    To alter the existing 23-storey apartment building by converting the existing ground floor storage space into habitable space (one one-bedroom unit). There will be a total of 294 residential dwelling units and 300 parking spaces (264 underground spaces and 36 surface (at-grade) spaces) on this lot.

    22 CLOSE AVE · Nov 20, 2024 · 484 m away

Latest activity nearby

  • Building permit

    New life-saftey generator on grade in the front yard (no existing generator), new transfer switch in a new 2 hour fire rated closet in the basement, including electrical and slab for generator.

    122 TYNDALL AVE · Nov 17, 2026 · 55 m away
  • Building permit

    Proposal to install back water valve.

    28 GWYNNE AVE · Oct 22, 2026 · 293 m away
  • Building permit

    REVISION-01: walkout on side of dwellingProposal for basement underpinning and finish the basement

    108 COWAN AVE · Oct 21, 2026 · 225 m away
  • Building permitdemolition

    The proposal involves the demolition of both the existing building known as Shalom House at 1339 King Street West, which contains 10 existing residential rental units, and the single¿detached dwelling located at 1337 King Street West. The 10 existing residential units at 1339 King Street West will be replaced as part of the proposed development, which consists of a new 10¿storey infill residential apartment building containing 92 affordable rental units. The dwelling unit at 1337 King St W is vacant.

    1337 KING ST W · Oct 16, 2026 · 279 m away
  • Building permit

    Rev 01 - Interior alteration in the basement, relocating ex. approved below grade staircase in the unit 2, scope of work highlighted with revision cloud.Proposal to construct front and rear basement walkouts and interior alterations to add 2 additional units in the basement of an existing 5 unit dwelling.

    159 DUNN AVE · Oct 14, 2026 · 286 m away
  • Building permit

    Interior cosmetic upgrades including in-suite laundry addition for Unit 309.No changes to existing HVAC - no HVA permit required.

    99 TYNDALL AVE · Oct 9, 2026 · 129 m away
  • Building permit

    Proposed removal of an existing obsolete fire alarm pull station and associated surface components within an apartment unit. No structural work is proposed

    159 DUNN AVE · Oct 8, 2026 · 286 m away
  • Minor variancePending

    Cancelled

    1337 KING ST W · Oct 5, 2026 · 279 m away
  • Zoning review

    Closed

    219 DUFFERIN ST · Sep 18, 2026 · 237 m away
  • Building permitsecondary suite

    Proposed alterative solution for sanitary drainage serving the rear basement unit to run within the front basement unit, with clearnouts at 6 ft (1.8m) intervals along its full length.

    159 DUNN AVE · Sep 15, 2026 · 286 m away

Neighbourhood: South Parkdale

About the area around the lot, not the lot itself.

Nearest station
Exhibition GO Station14 min walk
Nearest TTC stop
Dufferin St at Liberty St3 min walk
Nearest cycling route
Dufferin StSharrows, 8 min walk
Nearest traffic count
5,564 vehicles in 8 hKing St W / Tyndall Ave, 170 m away, Mar 30, 2022
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 0 with cyclists
Parks
Spencer - Cowan Parkette2 min walk
Dufferin - King Park2 min walk
Melbourne Avenue Parkette5 min walk

Schools within 1 km

  • HOLY FAMILY CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • DR RITA COX - KINA MINAGOK PUBLIC SCHOOL English Public 8 min walk
  • PARKDALE COLLEGIATE INSTITUTE English Public 10 min walk
  • PARKDALE JR & SR PUBLIC SCHOOL English Public 15 min walk
  • ALEXANDER MUIR GLADSTONE AVE & THE GROVE English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth ParkdaleMedian neighbourhood
Median household income (2020)$57,200$84,500
Households that own their home15%54%
Population (2021)20,49516,813
Homes built in 1960 or before37%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth ParkdaleCity median
Assault1140.3636.3
Robbery68.669.5
Homicide3.85.3
Shootings7.610.5
Auto theft72.5192.6
Theft over $5,00045.846.1
Break and enter240.3172.8
Theft from vehicles205.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.