HousePrecheckCheck an address

111 Cosburn AveToronto · zoning, lot size and permit records

Residential apartment · RA (d2.0)24.4 × 51.8 m1,263 m²on Cosburn Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 36 rental units, built 1955More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 268436 PRS 00 IV (Order Issued Property Standards: The property is not being kept free of pests, 2026, status Order Issued); 26 252191 PRS 00 IR (Property Standards, 2026, status Order Issued).
  • City upkeep score: 95 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: CosburnThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
24.4 m frontage51.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 268436 PRS 00 IV (Order Issued Property Standards: The property is not being kept free of pests, 2026, status Order Issued); 26 252191 PRS 00 IR (Property Standards, 2026, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 113710 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 95 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (3 storeys, 36 units, built 1955).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 268436 PRS 00 IVOrder Issued

    Order Issued Property Standards: The property is not being kept free of pests.

    Oct 9, 2026 · 111 COSBURN AVE
  • By-law investigation26 252191 PRS 00 IROrder Issued

    Property Standards

    Oct 9, 2026 · 111 COSBURN AVE
  • By-law investigation25 113710 PRS 00 IRClosed

    Property Standards

    Feb 6, 2025 · 111 COSBURN AVE
  • Building permit21 186813Closed

    Rev01 - Removal of Washer/Dryer from all the units and conversion as a Closet.Proposed Interior Alterations to a three storey residential building

    Jan 5, 2023 · 111 COSBURN AVE
  • Building permit18 177923Closed

    Proposal to install backflow prevention device.

    Jul 4, 2018 · 111 COSBURN AVE
  • Building permit91 207035Cancelled

    GALVANIZED TO COPPER PIPES

    Nov 15, 1991 · 111 COSBURN AVE

Lot facts

Area
1,263 m²
Frontage
24.4 m
Depth
51.8 m
Street
Cosburn Ave
Corner lot
No
Public lane
None
House footprint
600 m²roof up to 13 m
Back yard
7.9 mhouse to rear lot line
Side yards
2.5 m and 3.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
75%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Cosburn. The lot is inside the Cosburn Major Transit Station Area approved by the Province (Site and Area Specific Policy 766). Source
  • Zone RA (d2.0) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
73%16 of 22 decisions
Garden suite permits
7
Laneway suite permits
0
Multiplex permits
4
Development applications
2

Within 300 m, last 10 years. 11 suite and multiplex permits: more than at 77% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing four-storey apartment building (containing 33 residential dwelling units) by converting the existing integral garage, laundry, and storage areas into four additional residential dwelling units (located within the basement level). There will be a total of 37 residential dwelling units and 16 lawful parking spaces on this lot.

    210 COSBURN AVE · Jan 21, 2026 · 333 m away
  • Minor varianceRefused

    To permit the extension of the legal non-conforming detached dwelling by installing a front yard parking pad and to reduce the front yard soft landscaping area.

    113 A COSBURN AVE · Nov 23, 2022 · 19 m away
  • Minor varianceApproved

    To alter the existing 12-storey apartment building by converting existing ground floor storage area (east side) into two new dwelling units.

    205 COSBURN AVE · Nov 7, 2018 · 346 m away
  • Minor varianceApproved

    To alter the existing seven-storey residential apartment building containing 93 dwelling units by converting ground floor lobby area into two new residential dwelling units, for a total of 95 dwelling units.

    225-227 COSBURN AVE · Oct 26, 2016 · 411 m away
  • Minor varianceApproved

    To alter the existing six-storey apartment building by converting existing ground floor storage space (garage) into two dwelling units, resulting in a total of 94 dwelling units within the building. Minor Variance A0179/15TEY approved a dwelling unit increase from 90 to 93 dwelling units however an error in the actual total number of existing dwelling units in the building was made. To correctly identify the total number of existing dwelling units as 91 units, and to recognize an additional dwelling unit issued under building permit #15 249550, a further minor variance application is required.

    95 GAMBLE AVE · Jul 27, 2016 · 163 m away

Latest activity nearby

  • Zoning review

    Not Started

    139 FLOYD AVE · Nov 18, 2026 · 284 m away
  • Zoning review

    Not Started

    139 FLOYD AVE · Nov 18, 2026 · 284 m away
  • Building permit

    Proposal for new walk-out stair and basement underpinning.

    215 GOWAN AVE · Nov 16, 2026 · 146 m away
  • Consent (lot split)Pending

    To obtain consent to sever the property into two residential lots and to create various easements/rights-of-way.

    139 FLOYD AVE · Nov 13, 2026 · 284 m away
  • Minor variancePending

    To construct a new three-storey building (houseplex) with front and rear basement walkouts, front and rear covered porches with stairs, a front second storey balcony, and front and rear third storey balconies. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, one unit occupying the second level, and one unit occupying the third level).

    139 FLOYD AVE · Nov 13, 2026 · 284 m away
  • Minor variancePending

    To construct a new three-storey building (houseplex) with front and rear basement walkouts, front and rear covered porches with stairs, a front second storey balcony, and front and rear third storey balconies. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, one unit occupying the second level, and one unit occupying the third level).

    139 FLOYD AVE · Nov 13, 2026 · 284 m away
  • Zoning review

    Closed

    1029 PAPE AVE · Nov 11, 2026 · 58 m away
  • Consent (lot split)Refused

    To obtain consent to sever the property into three undersized residential lots.

    139 FLOYD AVE · Oct 14, 2026 · 284 m away
  • Minor varianceRefused

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    139 FLOYD AVE · Oct 14, 2026 · 284 m away
  • Minor varianceRefused

    To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).

    139 FLOYD AVE · Oct 14, 2026 · 284 m away

Neighbourhood: Danforth East York

About the area around the lot, not the lot itself.

Nearest station
Pape Station18 min walk
Nearest TTC stop
Pape Ave at Cosburn Ave1 min walk
Nearest cycling route
Cosburn AveBike Lane, 1 min walk
Nearest traffic count
17,612 vehicles in 14 hPape Ave / Cosburn Ave, 60 m away, Nov 6, 2024
Serious collisions within 500 m
82021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 2 with cyclists
Parks
Gamble Playground3 min walk
Agnes Macphail Square7 min walk
Westwood Park7 min walk

Schools within 1 km

  • WILLIAM BURGESS ELEMENTARY SCHOOL English Public 5 min walk
  • CHESTER ELEMENTARY SCHOOL English Public 6 min walk
  • WESTWOOD MDL SCHOOL English Public 6 min walk
  • CENTENNIAL COLLEGE SCHOOL - CARLAW CAMPUS College 8 min walk
  • HOLY CROSS CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • THE THREE HIERARCHS ACADEMY Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDanforth East YorkMedian neighbourhood
Median household income (2020)$101,000$84,500
Households that own their home69%54%
Population (2021)17,06516,813
Homes built in 1960 or before69%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDanforth East YorkCity median
Assault434.5636.3
Robbery10.969.5
Shootings10.910.5
Auto theft184.7192.6
Theft over $5,00021.746.1
Break and enter86.9172.8
Theft from vehicles239188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.