Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 open by-law investigation
Needs a closer lookNot resolved in the City's records: 26 221213 PRS 00 IR (Property Standards, 2026, status Rescheduled).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsBuilding permit open since 2024
Needs a closer lookStill open in the City's records: 24 106449 (Proposal for waterproofing repairs on podium deck, landscaping repairs on podium deck,..., 2024, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)8 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 224831 HEA 00 IR (Adequate Heat, 2026); 26 172777 000 00 IR (Adequate Heat, 2026); 26 172776 000 00 IR (Property Standards, 2026); and 5 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 72 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 90 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (15 storeys, 144 units, built 1987).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
16 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 224831 HEA 00 IRClosed
Adequate Heat
Aug 24, 2026 · 111 CHESTNUT ST - By-law investigation26 221213 PRS 00 IRRescheduled
Property Standards
Aug 17, 2026 · 111 CHESTNUT ST - By-law investigation26 172777 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 111 CHESTNUT ST - By-law investigation26 172776 000 00 IRClosed
Property Standards
Jun 1, 2026 · 111 CHESTNUT ST - By-law investigation26 168716 PRS 00 IRClosed
Property Standards
May 27, 2026 · 111 CHESTNUT ST - By-law investigation26 168479 PRS 00 IRClosed
Property Standards
May 27, 2026 · 111 CHESTNUT ST - By-law investigation25 269946 PRS 00 IRClosed
Property Standards
Dec 26, 2025 · 111 CHESTNUT ST - By-law investigation25 208480 PRS 00 IRClosed
Property Standards
Aug 11, 2025 · 111 CHESTNUT ST
Show 8 older records
- By-law investigation25 103853 PRS 00 IRClosed
Property Standards
Jan 13, 2025 · 111 CHESTNUT ST - Building permit24 106449Permit Issued
Proposal for waterproofing repairs on podium deck, landscaping repairs on podium deck, waterproofing replacement in interior garage, localized concrete repairs, drain repairs, expansion joint repairs
Mar 5, 2024 · 111 CHESTNUT ST - Building permit20 160819Closed
Proposed replacement of make-up air unit.
Aug 19, 2020 · 111 CHESTNUT ST - Building permit19 196696Closed
Proposal to construct a new overhead door in the garbage compaction room at the ground floor to facilitate moving garbage bins in and out of the room.
Oct 23, 2019 · 111 CHESTNUT ST - Building permit16 193178Closed
Plumbing - Alterations to the laundry room, new electrical pane, new lighting, new plumbing and mechanical system
Aug 26, 2016 · 111 CHESTNUT ST - Building permit14 232379Closed
Proposal to install one 3" backflow preventor.
Nov 10, 2014 · 111 CHESTNUT ST - Zoning review94 025312 LTOClosedSep 7, 1994 · 111 CHESTNUT ST
- Zoning review92 026130 LTOClosedNov 2, 1992 · 111 CHESTNUT ST
Check before you build
Site-specific exception 900.11.10(2309)
Needs a closer look5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(5)(d) of former City of Toronto By-law 438-86
- Older by-law D
City of Toronto by-law 593-06
- Older by-law G
On 111 Chestnut St., former City of Toronto by-law 710-82
3 parts for other addresses
- E On 55 Centre Ave., former City of Toronto by-law 322-87
- F On 108 Chestnut St., former City of Toronto by-law 322-87
- H On 439 University Ave., former City of Toronto by-laws 270-81 and 697-82.
Lot facts
- Area
- 1,373 m²
- Frontage
- 58.2 m
- Depth
- 23.8 m
- Street
- Chestnut St
- Corner lot
- No
- Public lane
- None
- House footprint
- 1,259 m²roof up to 88.9 m
- Back yard
- 0 mhouse to rear lot line
- Side yards
- 0.1 m and 0.5 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 2house, garage, sheds
- Max height
- 61 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 7.8 (c4.5; r7.8) SS1 (x2309) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: kentucky coffeetree (11 cm), kentucky coffeetree (9 cm), kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 89%8 of 9 decisions
- Garden suite permits
- 2
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 23
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 417 m away - Minor varianceApproved
To alter the parking length standard for one residential parking space (Unit 11) on Parking Level 1 of the 32-storey mixed-use building, containing three levels of below grade parking.
292 DUNDAS ST W · Mar 4, 2026 · 452 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).
130 ELIZABETH ST · Jan 14, 2026 · 119 m away - Minor varianceApproved
To permit a place of amusement (arcade) use on this subject lot.
247 YONGE ST · Jan 8, 2025 · 448 m away - Minor varianceApproved
To construct a new 12-storey mixed-use building with a total of 30 residential dwelling units and two non-residential (commercial) units on this lot. The property owner will be undergoing a Site Plan Control application.
203 DUNDAS ST W · Oct 16, 2024 · 146 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever the property into two lots and to create new easements/rights-of-way.
123 EDWARD ST · Oct 2, 2027 · 138 m away - Building permit
Proposal for interior alterations to existing office suite. To include HVAC, sprinkler alterations.
393 UNIVERSITY AVE · Nov 23, 2026 · 162 m away - Building permit
Installation of two (2) temporary structures for Cavalcade of Lights 2026 (Event)30' x 30' Tent for Arts & Crafts Supplied by Gervais Tents20' x 16' x 5' Theatre Stage Extension Riser Supplied by PSIInstall 11/25/2026 / Removal 11/29/2026
100 QUEEN ST W · Nov 19, 2026 · 198 m away - Building permit
Proposed an interior alteration
595 BAY ST · Nov 19, 2026 · 239 m away - Building permit
Proposal for interior alterations for Suite 2105 &2103
180 DUNDAS ST W · Nov 18, 2026 · 104 m away - Building permit
Proposal for interior alterations including furniture & elevator refurbishment.
100 QUEEN ST W · Nov 18, 2026 · 198 m away - Building permit
Interior alteration to existing office space (Unit 2200)
400 UNIVERSITY AVE · Nov 18, 2026 · 269 m away - Building permit
INTERIOR ALTERATIONS AND CHANGE OF USE FROM YOGA STUDIO TO DANCE STUDIO
121 DUNDAS ST W · Nov 17, 2026 · 107 m away - Building permit
Tenant improvement to existing office suite located on the 8th floor of 375 University Avenue. No changes of use or exterior work proposed. No change to existing demising walls of suite.
375 UNIVERSITY AVE · Nov 17, 2026 · 186 m away - Building permit
Mechanical retrofit to improve building energy efficiency including working in various building Mechanical rooms and roofs. Work will be done on the chilled water, heating water and glycol piping networks. Equipment will be updated and replaced including rooftop air-source heat pumps, heat recovery chillers, updated air handling equipment, and steam network modifications.
124 EDWARD ST · Nov 9, 2026 · 181 m away
Neighbourhood: Yonge-Bay Corridor
About the area around the lot, not the lot itself.
- Nearest station
- St Patrick Station3 min walk
- Nearest TTC stop
- Dundas St West at Chestnut St1 min walk
- Nearest cycling route
- Bay StSharrows - Arterial, 3 min walk
- Nearest traffic count
- 16,719 vehicles in 14 hDundas St W / Chestnut St, 60 m away, Oct 15, 2025
- Serious collisions within 500 m
- 72021–2026, killed or seriously injured: 0 fatal, 5 with pedestrians, 1 with cyclists
- Parks
- Larry Sefton Park2 min walk
- Trinity Square3 min walk
- Gallery Park7 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 5 min walk
- OCAD UNIVERSITY - THE LEARNING ZONE University 7 min walk
- CONTACT ALTERNATIVE SCHOOL English Public 7 min walk
- OCAD UNIVERSITY - ANNEX BUILDING University 7 min walk
- OCAD UNIVERSITY - ROSALIE SHARP PAVILION University 8 min walk
- OCAD UNIVERSITY - STUDENT CENTRE University 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Yonge-Bay Corridor | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $68,500 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 12,645 | 16,813 |
| Homes built in 1960 or before | 2% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Yonge-Bay Corridor | City median |
|---|---|---|
| Assault | 3361.1 | 636.3 |
| Robbery | 300.1 | 69.5 |
| Homicide | 12 | 5.3 |
| Shootings | 12 | 10.5 |
| Auto theft | 162.1 | 192.6 |
| Theft over $5,000 | 210.1 | 46.1 |
| Break and enter | 552.2 | 172.8 |
| Theft from vehicles | 402.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.