HousePrecheckCheck an address

110 Tenth StToronto · zoning, lot size and permit records

67.0 × 68.9 m4,615 m²on Tenth Stbacks onto Ln S Lake Shore E Eleventh

Not a home

St Josaphat Catholic Elementary School

The City's school locations place St Josaphat Catholic Elementary School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • 1 development application open within 300 m, up to 9 storeysNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
N20 m
67.0 m frontage68.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 9 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit25 124005Closed

    Proposal for altering he layout of Kindergarten 107 and Classroom 210 by adding walls and doors and creating new classroom with new corridor.

    May 12, 2025 · 110 TENTH ST
  • Building permit14 182436Closed

    Replace exsiting fire alarm system for St. Teresa Catholic School

    Jul 23, 2014 · 110 TENTH ST
  • Building permit12 225356Closed

    Installation of one backflow prevention device - St. Theresa Catholic School

    Oct 12, 2012 · 110 TENTH ST
  • Building permit04 107663Closed

    Installation of one window (security screen) in school office to St. Theresa Catholic School

    Feb 9, 2004 · 110 TENTH ST
  • Building permit96 085657Closed

    ''ST. TERESA SCHOOL'' INTERIOR ALTERATIONS

    Jul 17, 1996 · 110 TENTH ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,615 m²
Frontage
67 m
Depth
68.9 m
Street
Tenth St
Corner lot
No
Public lane
Ln S Lake Shore E Eleventh, 85.6 m along it
House footprint
1,111 m²roof up to 13.1 m
Back yard
4.7 mhouse to rear lot line
Side yards
1.9 m and 40 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: pine, austrian (26 cm), honey locust (12 cm), linden (11 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
89%33 of 37 decisions
Garden suite permits
3
Laneway suite permits
0
Multiplex permits
2
Development applications
1

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 37 variance decisions: more than at 71% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new fourplex, and a garden suite.

    7 SIXTEENTH ST · Sep 10, 2026 · 500 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0036/23EYK) approved variances related to floor space index and exterior main wall height.

    99 THIRTEENTH ST · Mar 26, 2026 · 203 m away
  • Minor varianceApproved

    To construct a one-storey rear addition and a new rear deck.

    73 TENTH ST · Jan 29, 2026 · 152 m away
  • Minor varianceApproved

    To enclose the existing front porch.

    16 EIGHTH ST · Nov 20, 2025 · 460 m away
  • Minor varianceApproved

    To legalize and to maintain an enclosed second storey front platform, to construct a second storey rear addition, and to convert the existing dwelling into a duplex.

    115 TENTH ST · Nov 20, 2025 · 80 m away

Latest activity nearby

  • Zoning review

    Closed

    3063-3065 LAKE SHORE BLVD W · Nov 24, 2026 · 105 m away
  • Building permit

    1 wall sign**BIG VAPE ENERGY**

    3063-3065 LAKE SHORE BLVD W · Nov 13, 2026 · 105 m away
  • Building permit

    Deferred Fees from folder 25 110984 (RSN-5575338) ZoningProcess RSN 80858278

    3049-3051 LAKE SHORE BLVD W · Nov 13, 2026 · 62 m away
  • Building permit

    Proposal fo interior alterations to an existing vacant unit on the ground floor for new dental clinic.Convenience address is 2955 Lake Shore Blvd W

    2953 LAKE SHORE BLVD W · Oct 22, 2026 · 292 m away
  • Building permit

    1 wall sign**BIG VAPE ENERGY**

    3063-3065 LAKE SHORE BLVD W · Oct 13, 2026 · 105 m away
  • Building permit

    Proposal for a new wood deck and new shed with attached carport.

    42 ELEVENTH ST · Oct 7, 2026 · 296 m away
  • Building permit

    Proposal to demolish garage and replace with mostly garden. No replacement garage.

    99 TWELFTH ST · Sep 10, 2026 · 102 m away
  • Building permit

    Demolish existing garage, tear out backyard asphalt and garage cement pad, remove patio stones and replace with a smaller area of interlocking brick, single car carport and large garden area

    99 TWELFTH ST · Aug 17, 2026 · 102 m away
  • Zoning review

    Notice Sent

    81 ELEVENTH ST · Aug 13, 2026 · 175 m away
  • Building permit

    Repair and extend current deck and add low level deck approx. 1ft above grade.

    99 B NINTH ST · Aug 12, 2026 · 167 m away

Neighbourhood: New Toronto

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station35 min walk
Nearest TTC stop
Lake Shore Blvd West at Tenth St1 min walk
Nearest cycling route
Colonel Sam Smith Park TrlMulti-Use Trail, 5 min walk
Nearest traffic count
7,847 vehicles in 8 hLake Shore Blvd W / Tenth St, 90 m away, Feb 19, 2014
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Lakeshore Village Park3 min walk
Colonel Samuel Smith Park4 min walk
Birmingham Street Parkette4 min walk

Schools within 1 km

  • ST JOSAPHAT CATHOLIC ELEMENTARY SCHOOL English Separate 1 min walk
  • CHILDREN'S URBAN ENRICHMENT STUDIO Private 3 min walk
  • SEVENTH STREET JR SCHOOL English Public 6 min walk
  • THE HOLY TRINITY SCHOOL English Separate 12 min walk
  • FATHER JOHN REDMOND CATHOLIC SECONDARY SCHOOL English Separate 12 min walk
  • LAKESHORE COLLEGIATE INSTITUTE English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNew TorontoMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home44%54%
Population (2021)11,34516,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNew TorontoCity median
Assault903.2636.3
Robbery76.569.5
Shootings15.310.5
Auto theft145.4192.6
Theft over $5,00091.946.1
Break and enter183.7172.8
Theft from vehicles244.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.