HousePrecheckCheck an address

110 Marlee AveToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (d2.5)48.9 × 80.4 m3,841 m²on Marlee Avecorner, also on Hopewell Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 7 storeys, 110 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 24 132453 (Balcony Repairs, 2024, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
  • City upkeep score: 95 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Eglinton WestThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
48.9 m frontage80.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 132453 (Balcony Repairs, 2024, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 101601 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 95 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (7 storeys, 110 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation25 148676 GRA 00 IVClosed

    Notice Issued Graffiti

    Apr 17, 2025 · 110 MARLEE AVE
  • By-law investigation25 146314 GRA 00 IRClosed

    Graffiti

    Apr 17, 2025 · 110 MARLEE AVE
  • By-law investigation25 102392 WST 00 IVClosed

    Notice Issued Waste

    Jan 8, 2025 · 110 MARLEE AVE
  • By-law investigation25 102249 WST 00 IRClosed

    Waste

    Jan 8, 2025 · 110 MARLEE AVE
  • By-law investigation25 101601 PRS 00 IRClosed

    Property Standards

    Jan 6, 2025 · 110 MARLEE AVE
  • Building permit24 132453Permit Issued

    Balcony Repairs

    May 14, 2024 · 110 MARLEE AVE
  • Zoning review24 134199 LPRClosed
    Apr 9, 2024 · 110 MARLEE AVE
  • Building permit15 206470Closed

    Install 3" backflow prevention device.

    Aug 17, 2015 · 110 MARLEE AVE

Lot facts

Area
3,841 m²
Frontage
48.9 m
Depth
80.4 m
Street
Marlee Ave
Corner lot
Yes, also on Hopewell Ave80.4 m along it
Public lane
None
House footprint
1,475 m²roof up to 28 m
Back yard
6.8 mhouse to rear lot line
Side yards
2.9 m and 9.3 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
24 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Eglinton West. The lot is inside the Eglinton West Major Transit Station Area approved by the Province (Site and Area Specific Policy 716). Source
  • Zone RAC (d2.5) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source

Around this lot

Minor variances approved
93%27 of 29 decisions
Garden suite permits
7
Laneway suite permits
0
Multiplex permits
11
Development applications
5

Within 300 m, last 10 years. 18 suite and multiplex permits: more than at 86% of Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To add two new apartments on second floor that are currently occupied by unused storage / staff space to create a total of 255 units.

    855 ROSELAWN AVE · Apr 1, 2021 · 76 m away

Latest activity nearby

  • Building permitgarden suite

    REV01: Proposed revision to existing permit 25 216635 BLD 00 SRPROPOSED NEW GARDEN SUITE (38.626m2 ABOVE GRADE, 38.626m2 BELOW GRADE)

    69 MARLEE AVE · Nov 20, 2026 · 154 m away
  • Building permit

    SECOND FLOOR ADDITION OVER EXISTING BUNGALOW AND ATTACHED GARAGE & REAR DECK

    57 FAIRLEIGH CRES · Nov 4, 2026 · 184 m away
  • Zoning review

    Application On Hold

    980 ROSELAWN AVE · Oct 30, 2026 · 274 m away
  • Zoning review

    Closed

    978 ROSELAWN AVE · Oct 5, 2026 · 265 m away
  • Building permitnew building, new house

    Revision to add the 3rd floor.Proposal to construct a two storey dwelling.

    385 WHITMORE AVE · Oct 5, 2026 · 281 m away
  • Building permit

    To upgrade water service line from property to City's portion

    367 HOPEWELL AVE · Oct 1, 2026 · 204 m away
  • Zoning review

    Notice Sent

    22 BELGRAVIA AVE · Sep 25, 2026 · 186 m away
  • Consent (lot split)Pending

    To obtain consent to sever the property into two residential properties. These lands were subject to a previous consent application (B070/13NY) however as the conditions were not satisfied within the required one year time period, the consent lapsed.

    26 DANESBURY AVE · Sep 18, 2026 · 300 m away
  • Minor varianceApproved

    To alter the existing one-storey detached dwelling by constructing a second storey addition.

    57 FAIRLEIGH CRES · Aug 6, 2026 · 184 m away
  • Zoning review

    Closed

    978 ROSELAWN AVE · Jul 28, 2026 · 265 m away

Neighbourhood: Briar Hill-Belgravia

About the area around the lot, not the lot itself.

Nearest station
Oakwood Station7 min walk
Nearest TTC stop
Marlee Ave at Roselawn Ave2 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail, 1 min walk
Nearest traffic count
9,280 vehicles in 14 hMarlee Ave / Hopewell Ave, 60 m away, Oct 21, 2026
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Kay Gardner Beltline Park1 min walk
Walter Saunders Memorial Park6 min walk
Newgate Parkette7 min walk

Schools within 1 km

  • STS COSMAS AND DAMIAN CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • ST THOMAS AQUINAS CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • WEST PREPARATORY JR PUBLIC SCHOOL English Public 11 min walk
  • J R WILCOX COMMUNITY SCHOOL English Public 13 min walk
  • THE VILLAGE SHUL SYNAGOGUE & SUPPLMENTARY SCHOOL Private 13 min walk
  • FAIRBANK PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBriar Hill-BelgraviaMedian neighbourhood
Median household income (2020)$81,000$84,500
Households that own their home48%54%
Population (2021)14,57516,813
Homes built in 1960 or before37%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBriar Hill-BelgraviaCity median
Assault684.5636.3
Robbery73.369.5
Shootings12.210.5
Auto theft262.8192.6
Theft over $5,00048.946.1
Break and enter207.8172.8
Theft from vehicles146.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.