HousePrecheckCheck an address

110 Eglinton Ave WToronto · zoning, lot size and permit records

Commercial residential · CR SS2 (x2625)21.7 × 35.0 m755 m²on Eglinton Ave Wcorner, also on Henning Ave

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 15 257014 (Proposal for parking garage repair - slab reconstruction in existing multiple unit buil..., 2015, status Permit Issued); 15 167113 (Concrete repairs at the garage roof slab, 2015, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 14 development applications open within 300 m, up to 65 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • Major Transit Station Area: EglintonThe City plans more homes around the station: good for transit, and more building over time.
N20 m
21.7 m frontage35.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2015

    Needs a closer look

    Still open in the City's records: 15 257014 (Proposal for parking garage repair - slab reconstruction in existing multiple unit buil..., 2015, status Permit Issued); 15 167113 (Concrete repairs at the garage roof slab, 2015, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 14 development applications open within 300 m

    Good to know

    14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 65 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit20 152226Closed

    Proposed interior alterations to the office space of unit 500

    Aug 21, 2020 · 110 EGLINTON AVE W
  • Building permit19 186320Closed

    To erect and display one static illuminated wall sign.**JILANI**

    Aug 10, 2020 · 110 EGLINTON AVE W
  • Building permit16 248977Closed

    Install one new Backflow Prevention Devices (Water only)

    Nov 30, 2016 · 110 EGLINTON AVE W
  • Building permit15 257014Permit Issued

    Proposal for parking garage repair - slab reconstruction in existing multiple unit building.

    Dec 3, 2015 · 110 EGLINTON AVE W
  • Building permit15 167113Permit Issued

    Concrete repairs at the garage roof slab.

    Jun 26, 2015 · 110 EGLINTON AVE W
  • Building permit11 331582Closed

    Jilani Group - Ground floor public corridor alteration

    Jan 19, 2012 · 110 EGLINTON AVE W
  • Building permit11 290483Closed

    5th Floor - Ontario College of Psychologists of Ontario

    Oct 28, 2011 · 110 EGLINTON AVE W
  • Building permit11 135515Closed

    Air conditioning/chiller upgrade

    Apr 7, 2011 · 110 EGLINTON AVE W
Show 4 older records
  • Building permit10 317171Closed

    Interior alterations to office space on the 3rd floor. "College of Psychologists of Ontario".

    Jan 6, 2011 · 110 EGLINTON AVE W
  • Building permit10 239950Closed

    Fourth floor - Cancon Construction

    Aug 23, 2010 · 110 EGLINTON AVE W
  • Building permit07 272382Closed

    Int. alts. to existing office building on 4th floor - Unit 400

    Nov 6, 2007 · 110 EGLINTON AVE W
  • Building permit02 106966Closed

    install partitions on 5th floor--"THE COLLEGE OF PSYCOLOGISTS OF ONTARIO"

    Feb 7, 2002 · 110 EGLINTON AVE W

Check before you build

  • Site-specific exception 900.11.10(2625)

    Needs a closer look

    5 site-specific rules and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2625)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The maximum height of a building or structure is 22.5 metres

  2. Rule B

    Up to a height of 13.5 metres, at least 75% of the main wall of the building facing a lot line abutting Eglinton Avenue must be between 0 metres and 0.5 metres from the front lot line , and all of the main wall of the building facing a lot line abutting Eglinton Avenue must be between 0.0 metres and 5.5 metres from the front lot line

  3. Rule C

    Any part of a building located above the point, measured at 13.5 metres above the average elevation of the grade of the lot line abutting Eglinton Avenue, must have a step-back of at least 1.5 metres from the building setback of the highest storey of the building located below that point

  4. Rule D

    These premises must comply with Exception 900 11.10(2).

  5. Rule E

    Despite regulation 40.10.20.40(1), dwelling units are permitted in an apartment building and a mixed-use building . Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86; (B) Section 12(2) 119 of former City of Toronto By-law 438-86; (C) Section 12(2) 270(a) of former City of Toronto By-law 438-86

  6. Older by-law A

    The maximum height of a building or structure is 22.5 metres

  7. Older by-law B

    Up to a height of 13.5 metres, at least 75% of the main wall of the building facing a lot line abutting Eglinton Avenue must be between 0 metres and 0.5 metres from the front lot line , and all of the main wall of the building facing a lot line abutting Eglinton Avenue must be between 0.0 metres and 5.5 metres from the front lot line

  8. Older by-law C

    Any part of a building located above the point, measured at 13.5 metres above the average elevation of the grade of the lot line abutting Eglinton Avenue, must have a step-back of at least 1.5 metres from the building setback of the highest storey of the building located below that point

  9. Older by-law D

    These premises must comply with Exception 900 11.10(2).

  10. Older by-law E

    Despite regulation 40.10.20.40(1), dwelling units are permitted in an apartment building and a mixed-use building . Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86; (B) Section 12(2) 119 of former City of Toronto By-law 438-86; (C) Section 12(2) 270(a) of former City of Toronto By-law 438-86

By-law 569-2013, Chapter 900

Lot facts

Area
755 m²
Frontage
21.7 m
Depth
35 m
Street
Eglinton Ave W
Corner lot
Yes, also on Henning Ave35 m along it
Public lane
None
House footprint
711 m²roof up to 32 m
Back yard
1.1 mhouse to rear lot line
Side yards
0 m and 0.3 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
15 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Eglinton. The lot is inside the Eglinton Major Transit Station Area approved by the Province (Site and Area Specific Policy 723). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR SS2 (x2625) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
92%12 of 13 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
17

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the 38-storey mixed-use building (approved under Site Specific Zoning By-Law 153-2022(OLT)), to permit six obstructed parking spaces with a reduced width (located on parking levels P1 to P5).

    2161 YONGE ST · Aug 19, 2026 · 377 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 153-2022(OLT)) for a 38-storey mixed-use building by increasing the residential gross floor area (for a total of 380 residential dwelling units), reducing the commercial (office) gross floor area, and reducing the number of required parking spaces. Also, to permit a home occupation use (personal service shop) within the building, and to reduce the required width of 4 obstructed parking spaces.

    2161 YONGE ST · Aug 14, 2024 · 377 m away
  • Minor varianceApproved

    To remove the on-site office replacement per site-specific By-law 1236-2022(OLT) and associated parking and loading requirements. Related Planning applications; 22 190798 STE 12 OZ.

    50-60 EGLINTON AVE W · Oct 26, 2023 · 107 m away
  • Minor varianceApproved

    To alter Site Specific Zoning By-law 153-2022 (Ontario Land Tribunal (OLT)) to increase the mixed-use building height, increase the total maximum gross floor area, increase the total residential gross floor area, and reduce the minimum length of 26 parking spaces.

    2161 YONGE ST · Aug 9, 2023 · 377 m away
  • Minor varianceApproved

    To alter the 10-storey, 56-unit mixed-use development, approved under Site Specific By-law No. 1173-2015, by permitting two additional storeys, increasing the height of the retail level, converting a part of a residential unit on the second storey to amenity space, and converting two regular parking spaces on level P2 into one accessible parking space, for a total of 70 residential units.

    2112 YONGE ST · May 18, 2022 · 496 m away

Latest activity nearby

  • Building permit

    Revision #1 - Building renovation including interior demolition, core and shell commercial space, replacement of the east elevation façade and roof repair. Changes bubbled on plans and cover memo outline nature of changes.Proposed building renovation including interior demolition, core and shell commercial space, replacement of the east elevation façade and roof repair. No new floor area is proposed.

    2190 YONGE ST · Nov 23, 2026 · 261 m away
  • Building permitdemolition

    TO DEMOLISH EXISTING TWO-STOREY RESIDENTIAL BUILDING FOR FUTURE CITY PARKLAND AS PER APPROVED SETTLEMENT. CITY FILE NO. 23 176474 NNY 08 OZ & 24 135591 NNY 0Z

    41 HENNING AVE · Nov 18, 2026 · 102 m away
  • Building permitdemolition

    TO DEMOLISH EXISTING TWO-STOREY RESIDENTIAL BUILDING FOR FUTURE CITY PARKLAND AS PER APPROVED SETTLEMENT. CITY FILE NO. 23 176474 NNY 08 OZ & 24 135591 NNY 0Z

    39 HENNING AVE · Nov 18, 2026 · 96 m away
  • Building permitdemolition

    TO DEMOLISH EXISTING TWO-STOREY RESIDENTIAL BUILDING FOR FUTURE CITY PARKLAND AS PER APPROVED SETTLEMENT. CITY FILE NO. 23 176474 NNY 08 OZ & 24 135591 NNY 0Z

    37 HENNING AVE · Nov 18, 2026 · 89 m away
  • Building permitdemolition

    DEMOLITION OF EXISTING TWO STOREY BRICK DWELLING. PROPOSED 40-STOREY RESIDENTIAL BUILDING WITH TWO LEVELS OF UNDERGROUND PARKING LEVELS. CITY FILE NO.: 23 176474 NNY 08 OZ & 24 135591 NNY 08 OZ

    35 HENNING AVE · Nov 18, 2026 · 85 m away
  • Building permitdemolition

    DEMOLITION OF EXISTING TWO STOREY BRICK DWELLING.PROPOSED 40-STOREY RESIDENTIAL BUILDING WITH TWO LEVELS OF UNDERGROUND PARKING LEVELS. CITY FILE NO.: 23 176474 NNY 08 OZ & 24 135591 NNY 08 OZ

    33 HENNING AVE · Nov 18, 2026 · 80 m away
  • Building permit

    Proposal to remove the existing second floor guardrail and replace it with a parapet wall, and to create two roof penetrations in preparation for future HVAC installation

    174 EGLINTON AVE W · Nov 9, 2026 · 150 m away
  • Building permit

    Proposed basement underpinning and interior alterations

    159 COLIN AVE · Nov 9, 2026 · 201 m away
  • Building permit

    REV 01: RELOCATION OF SPRINKLERS IN LOBBY AREAProposal to add sprinkler system to lobby.

    30 EDITH DR · Nov 6, 2026 · 132 m away
  • Building permit

    Proposal to install a maglock in an existing retail store - LCBO #C019

    2300 YONGE ST · Nov 5, 2026 · 237 m away

Neighbourhood: Yonge-Eglinton

About the area around the lot, not the lot itself.

Nearest station
Eglinton Station3 min walk
Nearest TTC stop
Eglinton Ave West at Duplex Ave1 min walk
Nearest cycling route
Eglinton Ave WCycle Track, 1 min walk
Nearest traffic count
14,463 vehicles in 14 hEglinton Ave W / Colin Ave / Edith Dr, 90 m away, Apr 17, 2024
Serious collisions within 500 m
32021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 0 with cyclists
Parks
Eglinton Park2 min walk
233 Duplex Ave Park3 min walk
Montgomery Square Park6 min walk

Schools within 1 km

  • BIRMINGHAM INTERNATIONAL COLLEGIATE OF CANADA Private 1 min walk
  • CAESAR INTERNATIONAL ACADEMY Private 6 min walk
  • EGLINTON LINC AND ESL CENTRE English Separate 8 min walk
  • ST MONICA CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • NORTH TORONTO COLLEGIATE INSTITUTE English Public 9 min walk
  • CAREERQUEST Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-EglintonMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home37%54%
Population (2021)12,41016,813
Homes built in 1960 or before47%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-EglintonCity median
Assault713.8636.3
Robbery95.269.5
Auto theft115.6192.6
Theft over $5,00010246.1
Break and enter136172.8
Theft from vehicles54.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.