HousePrecheckCheck an address

110 Bond StToronto · zoning, lot size and permit records

Commercial residential · CR 4.0 (c0.5; r4.0) SS1 (x2201)8.8 × 35.9 m316 m²on Bond Stbacks onto Victoria Street Lane

Not a home

Land without a building

A demolition permit (26 104039, 2026) is on file and no permit for a new building: the land is probably empty or used for parking. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 26 104039 (Demolition of existing 3 Storey commercial building, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 12 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: CollegeThe City plans more homes around the station: good for transit, and more building over time.
N10 m
8.8 m frontage35.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 104039 (Demolition of existing 3 Storey commercial building, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 104039Permit Issueddemolition

    Demolition of existing 3 Storey commercial building

    Jan 30, 2026 · 110 BOND ST
  • Development application22 242103 STE 13 OZClosed

    This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.

    Dec 23, 2022 · 110 BOND ST · City file
  • Building permit18 109003Closed

    REV02: changes as per bubbled drawingsRevision # 01 - Changes to interior layout and added washroomsREV 01: changes to new shaft wall and fire rated assembly as per bubbled drawingsProposal for interior alterations for new windows, roof assembly and construction of new academic program in existing 3 storey university building (Phase 3).

    Jan 8, 2019 · 110 BOND ST
  • Building permit18 243842Closed

    Proposal to install 3 maglocks ( 1 each on levels 1, 2 & 3)

    Oct 22, 2018 · 110 BOND ST
  • Building permit18 238144Closed

    Proposal to upgrade fire alarm system to basement, ground floor, second floor, and third floor in relation to permit under file #18-109003 for Ryerson University.

    Oct 22, 2018 · 110 BOND ST
  • Building permit17 252655Closed

    Rev 01: changes include new shaft walls, changes to fire rated assembly as per bubbled drawings.Proposal for interior alterations for structural upgrades including an elevator in an existing 3 storey university building (Phase 2).See also related permit 17 210859 BLD for interior demolition.

    Sep 19, 2018 · 110 BOND ST
  • Building permit18 209698Closed

    Proposal to install new sprinkler system

    Sep 5, 2018 · 110 BOND ST
  • Building permit17 210859Closed

    Proposal for interior demolition to all floors of an existing 3 storey university building. HVAC & PLB to be removed. See also 17 179256 ZPR.

    Sep 25, 2017 · 110 BOND ST
Show 7 older records
  • Zoning review17 179256 ZPRClosed
    Jun 13, 2017 · 110 BOND ST
  • Building permit16 251139Closed

    Proposal to install a backflow prevention device in an existing mixed use, commercial building.

    Dec 2, 2016 · 110 BOND ST
  • Building permit08 223694Closed

    Proposal for a new fire alarm in the existing building.

    Dec 8, 2008 · 110 BOND ST
  • Building permit08 223674Closed

    Proposal for a new sprinkler system in the existing basement of the building.

    Dec 8, 2008 · 110 BOND ST
  • Building permit08 189177Closed

    Interior alterations to rear portion of ground floor for new bike storage area.

    Sep 11, 2008 · 110 BOND ST
  • Zoning review04 154107 ZPUClosed
    Jul 7, 2004 · 110 BOND ST
  • Building permit02 174382Closed

    make interior altertions to ground floor for new duplicating shop. also install new overhead doors at rear of property for loading facilities.

    Oct 30, 2002 · 110 BOND ST

Check before you build

  • Site-specific exception 900.11.10(2201)

    Needs a closer look

    5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2201)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 397 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 216 of former City of Toronto By-law 438-86

  4. Older by-law D

    Former City of Toronto By-law 97-0194

  5. Older by-law E

    Regulations (A) to (D) above do not apply to the lands municipally known as 104 Bond Street and 110 Bond Street in 2023.

By-law 569-2013, Chapter 900

Lot facts

Area
316 m²
Frontage
8.8 m
Depth
35.9 m
Street
Bond St
Corner lot
No
Public lane
Victoria Street Lane, 8.8 m along it
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c0.5; r4.0) SS1 (x2201) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: honey locust ruby lace (34 cm), honey locust ruby lace (31 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%13 of 14 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
30

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 242 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 453 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 488 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 350 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 361 m away

Latest activity nearby

  • Zoning review

    Closed

    335 YONGE ST · Nov 23, 2026 · 183 m away
  • Zoning review

    Not Started

    21 DUNDAS SQ · Nov 6, 2026 · 125 m away
  • Building permit

    Installation of a seasonal decorative Christmas wreath (designated structure) attached to the exterior wall of a retail store, Le Maison Simons, for the Christmas season.

    260 YONGE ST · Nov 6, 2026 · 274 m away
  • Building permit

    Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.

    1 DUNDAS ST W · Nov 5, 2026 · 237 m away
  • Building permit

    Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.

    332 YONGE ST · Nov 5, 2026 · 242 m away
  • Zoning review

    Closed

    78 MUTUAL ST · Oct 28, 2026 · 287 m away
  • Building permit

    1 overhanging structure sign**SIMONS CHRISTMAS WREATH**

    260 YONGE ST · Oct 27, 2026 · 274 m away
  • Zoning review

    Closed

    1 DUNDAS ST E · Oct 26, 2026 · 141 m away
  • Building permit

    FS - Sprinkler Shop Drawing - Interior alterations - new office suite fit-out (tenant Improvements)

    20 DUNDAS ST W · Oct 23, 2026 · 225 m away
  • Building permit

    FS - Sprinkler Shop Drawing - Proposal for interior alterations for existing vacant space for new office - ESDC SERVICE CANADA CENTRE

    28 EDWARD ST · Oct 20, 2026 · 295 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
TMU Station3 min walk
Nearest TTC stop
Dundas St East at Church St2 min walk
Nearest cycling route
Shuter StBike Lane, 4 min walk
Nearest traffic count
11,168 vehicles in 14 hDundas St E / Bond St, 70 m away, Aug 20, 2024
Serious collisions within 500 m
182021–2026, killed or seriously injured: 1 fatal, 11 with pedestrians, 4 with cyclists
Parks
Toronto Metropolitan University Square1 min walk
Arena Gardens4 min walk
Trinity Square4 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 1 min walk
  • TMU - HEASLIP HOUSE University 1 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 2 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 2 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 3 min walk
  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 3 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.