Commercial residential · CR 8.0 (c5.0; r3.0) SS2 (x2511)≈ 92.5 × 180.9 m7,117 m²on Ferndale Avecorner, also on St Clair Ave Ebacks onto Tamblyn Lane

Not a home

St Clair Station

The City of Toronto's real estate inventory lists St Clair Station here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • Permits or applications open on this parcelRecent records on this lot: 23 225691 (Revision 01 - to reflect new davit arms and fall arrest anchors; new and updated detail..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 20 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: St ClairThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 92.5 m frontage≈ 180.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 6 building permits open, the oldest since 2014

    Needs a closer look

    Still open in the City's records: 22 122869 (Removal of existing conduits and wiring and replacement with new conduits and wiring at..., 2022, status Permit Issued); 22 121882 (Removal of existing conduits and wiring and replacement with new conduits and wiring at..., 2022, status Permit Issued); 16 132915 (Proposal for local concrete repairs and replacement of the streetcar platform, stair cu..., 2016, status Inspection); and 3 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 23 225691 (Revision 01 - to reflect new davit arms and fall arrest anchors; new and updated detail..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 20 development applications open within 300 m

    Good to know

    20 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

16 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit23 225691Revision Issued

    Revision 01 - to reflect new davit arms and fall arrest anchors; new and updated detailsReplacement of pit cover and construction of new pit ladders at various locations at TTC's St. Clair Station

    Oct 15, 2025 · 15 ST CLAIR AVE E
  • Building permit22 122869Permit Issued

    Removal of existing conduits and wiring and replacement with new conduits and wiring at new locations. HVAC ductwork and plumbing modifications as required to suit the new conduit and wiring installations.

    Apr 13, 2022 · 11 ST CLAIR AVE E
  • Building permit22 121882Permit Issued

    Removal of existing conduits and wiring and replacement with new conduits and wiring at new locations. HVAC ductwork and plumbing modifications as required to suit the new conduit and wiring installations.

    Apr 12, 2022 · 11 ST CLAIR AVE E
  • Building permit21 211763Closed

    New wall mounted guardrails at roof level of Toronto Transit Commission's Pleasant Substation

    Oct 13, 2021 · 11 ST CLAIR AVE E
  • Building permit17 279949Closed

    Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with Presto faregates - TTC Subway Station " St Clair Ave Station"

    Jan 25, 2018 · 15 ST CLAIR AVE E
  • Building permit16 132915Inspection

    Proposal for local concrete repairs and replacement of the streetcar platform, stair curbs and handrails; column repairs on the lower concourse bus platform and streetcar platform. Convenience address is 15 St Clair Ave E

    Apr 7, 2016 · 11 ST CLAIR AVE E
  • Building permit16 121199Permit Issued

    Proposal for re-roofing, installation of guard rails and stairs over the roof and the addiiton of 2 new roof drains at existing transit station. Convenience address is 15 St Clair Ave E.

    Mar 29, 2016 · 11 ST CLAIR AVE E
  • Building permit15 147282Permit Issued

    Proposal for concrete repair at existing transit station. Scope of work includes replacing underground drain lines.

    May 14, 2015 · 11 ST CLAIR AVE E
Show 8 older records
  • Building permit14 214286Inspection

    To upgrade fire alarm system and control on the street level and two sub levels of St Clair Subway Station.

    Sep 17, 2014 · 15 ST CLAIR AVE E
  • Zoning review11 277682 ZBACancelled
    Sep 19, 2011 · 11 ST CLAIR AVE E
  • Zoning review11 271186 LTOClosed
    Sep 8, 2011 · 11 ST CLAIR AVE E
  • Building permit05 126164Closed - Dormant

    HVAC - TTC Contract S45-5 - Easier access elevator renovations at St. Clair Station. - Interior Alterations

    Jan 5, 2006 · 11 ST CLAIR AVE E
  • Building permit04 121681Closed - Dormant

    HVAC - Interior alterations to offices within St Clair subway station - Interior Alterations

    May 27, 2004 · 11 ST CLAIR AVE E
  • Building permit98 013914Closed

    INSTALL NEW FIRE ALARM SYSTEM THROUGHOUT SUBWAY STATION. EDC (CONVENIENCE: 15 ST CLAIR AV E)

    Mar 19, 1998 · 11 ST CLAIR AVE E
  • Zoning review92 026284 LTOClosed
    Dec 7, 1992 · 11 ST CLAIR AVE E
  • Zoning review89 030338 LTOClosed
    Sep 7, 1989 · 15 ST CLAIR AVE E

Check before you build

  • Site-specific exception 900.11.10(2511)

    Needs a closer look

    6 site-specific rules and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2511)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, no window of a building facing Pleasant Boulevard is display goods or advertising; [TO: 438-86; 12 (2) 30]

  2. Rule B

    Despite regulation 40.10.20.100 (2), a Nightclub is not a permitted use

  3. Rule C

    In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 262 of former City of Toronto By-law 438-86; (B) Section 12(2) 263 of former City of Toronto By-law 438-86; (C) Section 12(2) 267 of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  5. Rule E

    On the lands municipally known as 11 St. Clair Ave. E. in 1988, Sections 12(2) 41 and 12(2) 42 of former City of Toronto By-law 438-86

  6. Rule F

    On 11 St. Clair Ave. E., former City of Toronto by-laws 21670, 21699, and 89-68.

  7. Older by-law A

    On the lands, no window of a building facing Pleasant Boulevard is display goods or advertising; [TO: 438-86; 12 (2) 30]

  8. Older by-law B

    Despite regulation 40.10.20.100 (2), a Nightclub is not a permitted use

  9. Older by-law C

    In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 262 of former City of Toronto By-law 438-86; (B) Section 12(2) 263 of former City of Toronto By-law 438-86; (C) Section 12(2) 267 of former City of Toronto By-law 438-86

  10. Older by-law D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  11. Older by-law E

    On the lands municipally known as 11 St. Clair Ave. E. in 1988, Sections 12(2) 41 and 12(2) 42 of former City of Toronto By-law 438-86

  12. Older by-law F

    On 11 St. Clair Ave. E., former City of Toronto by-laws 21670, 21699, and 89-68.

By-law 569-2013, Chapter 900

Lot facts

Area
7,117 m²
Frontage
92.5 mestimated, irregular lot
Depth
180.9 mestimated, irregular lot
Street
Ferndale Ave
Corner lot
Yes, also on St Clair Ave E180.9 m along it
Public lane
Tamblyn Lane, 80.5 m along it
House footprint
1,348 m²
Back yard
51.3 mhouse to rear lot line
Side yards
20.7 m and 58.1 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
57 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: St Clair. The lot is inside the St Clair Major Transit Station Area approved by the Province (Site and Area Specific Policy 721). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 8.0 (c5.0; r3.0) SS2 (x2511) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
81%17 of 21 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
3
Development applications
28

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 21 variance decisions: more than at 52% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new three-storey non-residential building (including a mezzanine level), with various uses such as: adaptable spaces for community-oriented and commercial uses, a convertible auditorium space, an atrium gathering area, workshops, studios, meeting rooms, café, entertainment places of assembly, eating/take-out establishment(s), and recreation. There will be greenroof areas, an outdoor rooftop terrace, and the rooftop mechanical penthouse will be enclosed (above the second storey).

    1560 YONGE ST · May 27, 2026 · 339 m away
  • Minor varianceApproved

    To permit additional commercial use types on the ground floor of the 44-storey mixed-use building (currently under construction).

    1 DELISLE AVE · Feb 18, 2026 · 274 m away
  • Minor varianceApproved

    To permit a commercial school use (fitness studio occupying Units 106 and 109) on the first storey of the existing 21-storey non-residential building.

    2 ST CLAIR AVE W · Jan 28, 2026 · 241 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1032-2022) for a mixed-use development comprised of a 13-storey building (Building 1) and three towers (Tower 1 with 44-storeys, Tower 2 with 38-storeys and Tower 3 with 25-storeys) connected by a shared podium on the lot by reallocating a proportion of residential density from Building 1 to Tower 1, increasing the building height of Tower 1 from 44-storeys (144 m) to 46-storeys (161.2 m), decreasing the height of Building 1 from 13-storeys (53.5 m) to four-storeys (25 m), increasing the height and projections of the mechanical penthouse and architectural crowning elements associated with Tower 1, modifying setbacks and separation distance by relocating Tower 2 (north toward Building 1) and by altering the podium element below Tower 3.

    1 HEATH ST E · Dec 10, 2025 · 317 m away
  • Minor varianceApproved

    To redescribe the lands as a result of the conveyance of the rear portion of the lot for parkland dedication.

    30 ST CLAIR AVE W · Oct 29, 2025 · 295 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    30 ST CLAIR AVE W · Oct 28, 2027 · 295 m away
  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    1 DELISLE AVE · Aug 10, 2027 · 274 m away
  • Building permit

    Proposal to install 1 maglocks in existing office space - UNIT 400

    1 ST CLAIR AVE E · Nov 13, 2026 · 152 m away
  • Building permit

    Proposal for maglock installation.

    2 ST CLAIR AVE W · Nov 10, 2026 · 241 m away
  • Building permit

    Proposal for localized concrete repairs and replacing the guards at the northwest exterior garage stairwell.

    44 JACKES AVE · Nov 4, 2026 · 241 m away
  • Building permit

    Proposed interior alterations of existing men and women common floor washrooms

    22 ST CLAIR AVE E · Oct 28, 2026 · 125 m away
  • Building permit

    Proposal for interior alterations for an existing office.

    1 ST CLAIR AVE E · Oct 26, 2026 · 152 m away
  • Building permit

    Proposal for interior alterations of existing suites 201 and 1100.

    21 ST CLAIR AVE E · Oct 21, 2026 · 92 m away
  • Building permit

    Proposal for PHASE 1: Stock room for future Dollarama retail store: Interior renovation (Fit-up)

    2 ST CLAIR AVE E · Oct 14, 2026 · 181 m away
  • Building permit

    Proposed interior alterations of existing Group D offices - UNIT 800 & 900

    2 ST CLAIR AVE W · Oct 14, 2026 · 241 m away

Neighbourhood: Rosedale-Moore Park

About the area around the lot, not the lot itself.

Nearest station
St Clair Station1 min walk
Nearest TTC stop
St Clair Station1 min walk
Nearest cycling route
Rosehill AveSigned Route (No Pavement Markings), 2 min walk
Nearest traffic count
13,667 vehicles in 14 hSt Clair Ave E / Ferndale Ave, 80 m away, Oct 18, 2025
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
Parks
David A. Balfour Park3 min walk
54 Jackes Ave Park4 min walk
Yorkminster Park Baptist Church Park5 min walk

Schools within 1 km

  • THE LINDEN SCHOOL Private 3 min walk
  • DEER PARK JR & SR PUBLIC SCHOOL English Public 3 min walk
  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 6 min walk
  • THE YORK SCHOOL - JR CAMPUS Private 8 min walk
  • OUR LADY OF PERPETUAL HELP CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • DE LASALLE COLLEGE SCHOOL Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRosedale-Moore ParkMedian neighbourhood
Median household income (2020)$122,000$84,500
Households that own their home58%54%
Population (2021)20,08016,813
Homes built in 1960 or before46%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRosedale-Moore ParkCity median
Assault1080.4636.3
Robbery86.869.5
Auto theft199.6192.6
Theft over $5,00065.146.1
Break and enter455.6172.8
Theft from vehicles182.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.