HousePrecheckCheck an address

11 River StToronto · zoning, lot size and permit records

46.1 × 76.9 m3,501 m²on River Stcorner, also on Queen St Ebacks onto Old Brewery Lane

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 12 144138 (This is for interior alterations to the ground floor and a stair at the ground floor le..., 2012, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 9 development applications open within 300 m, up to 46 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N20 m
46.1 m frontage76.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (69% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Building permit open since 2012

    Needs a closer look

    Still open in the City's records: 12 144138 (This is for interior alterations to the ground floor and a stair at the ground floor le..., 2012, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (60% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 9 development applications open within 300 m

    Good to know

    9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit24 115860Closed

    1 WALL SIGN1/4 thick acrylic letters, flush mounted to exterior brick wall

    Feb 22, 2024 · 11 RIVER ST
  • Building permit20 154003Closed

    To erect and display a non-illuminated wall sign displaying static copy. Erected on the first storey of the west wall of the property. **Toronto Humane Society**

    Jan 13, 2022 · 11 RIVER ST
  • Zoning review21 217892 ZSVClosed
    Sep 27, 2021 · 11 RIVER ST
  • Zoning review21 201783 ZPRClosed
    Aug 20, 2021 · 11 RIVER ST
  • Building permit12 144138Inspection

    This is for interior alterations to the ground floor and a stair at the ground floor leading to the exterior of the building. This is for the "TORONTO HUMANE SOCIETY" and will include plumbing and HVAC.

    Apr 23, 2012 · 11 RIVER ST
  • Building permit09 163095Closed

    permit for 2 back flow valves for Toronto Humaine Society

    Sep 9, 2009 · 11 RIVER ST
  • Building permit05 165813Closed

    Plumbing - Second storey addition to the Toronto Humane Society - Addition(s)

    Jan 10, 2006 · 11 RIVER ST
  • Zoning review05 158592 ZPRClosed
    Jul 12, 2005 · 11 RIVER ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,501 m²
Frontage
46.1 m
Depth
76.9 m
Street
River St
Corner lot
Yes, also on Queen St E76.9 m along it
Public lane
Old Brewery Lane, 133.2 m along it
House footprint
3,018 m²roof up to 15 m
Back yard
0.2 mhouse to rear lot line
Side yards
0 m and 2.6 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 8 City trees in front of this lot. The City's street tree inventory lists 8 trees at this address: elm (10 cm), elm, american (10 cm), elm (10 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%15 of 15 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
18

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 82 m away
  • Minor varianceRefused

    To permit a vehicle dealership use and vehicle service use (Downtown Automatic Group Cadillac) within the existing ground floor commercial unit of the mixed-use building.

    45 BASEBALL PL · May 13, 2026 · 396 m away
  • Minor varianceApproved

    To alter the development standards for the 34-storey mixed-use building (approved under Site Specific Zoning By-Law 839-2021), by increasing the height and number of storeys (from 34-storeys to 40-storeys (including a 6-storey podium)), gross floor area, number of dwelling units, and permitted projections to accommodate the garbage vent chute and mechanical penthouse. Also, to reduce the percentage of the required two or three bedroom dwelling units or larger, building setbacks, resident parking spaces, bicycle parking spaces, and the width of stacked bicycle parking spaces. There will be a total of 527 residential dwelling units on this lot and modify the building setbacks. A related Site Plan Control Application (File Number 20 208677 STE 13 SA) is approved with conditions.

    111 RIVER ST · Jan 28, 2026 · 352 m away
  • Minor varianceApproved

    To alter the existing one-storey detached building by permitting a vehicle service shop use on this lot.

    131 RIVER ST · Oct 29, 2025 · 428 m away
  • Minor varianceApproved

    To construct a new rooftop stair enclosure (vestibule and storage area) for Unit 701, within this existing seven-storey detached building. The existing private rooftop elevator enclosure will be demolished.

    90 SUMACH ST · Jan 8, 2025 · 315 m away

Latest activity nearby

  • Zoning review

    Not Started

    9 DAVIES AVE · Nov 23, 2026 · 234 m away
  • Building permit

    PROPOSED NEW DETACHED GARAGE

    60 WASCANA AVE · Nov 23, 2026 · 82 m away
  • Zoning review

    Not Started

    480 SHUTER ST · Nov 19, 2026 · 288 m away
  • Building permit

    PROPOSED ALTERATIONS TO SECOND FLOOR

    491 QUEEN ST E · Nov 17, 2026 · 206 m away
  • Zoning review

    Not Started

    7 LABATT AVE · Oct 21, 2026 · 208 m away
  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 82 m away
  • Zoning review

    Notice Sent

    534 QUEEN ST E · Oct 13, 2026 · 156 m away
  • Development application

    Official Plan and Zoning By-law Amendment application for two 46-storey residential buildings containing approximately 1,170 dwelling units and a 2-storey non-residential building containing 1,111 square metres of non-residential space.

    7 LABATT AVE · Sep 30, 2026 · 207 m away · City file
  • Building permit

    HVAC permit required to close out Plumbing Permit.Related 26-155352 BLD 00 BA

    632 QUEEN ST E · Sep 25, 2026 · 273 m away
  • Building permit

    Proposal to replace deteriorating brick facade of existing dwelling

    6 WASCANA AVE · Aug 19, 2026 · 215 m away

Neighbourhood: Regent Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station32 min walk
Nearest TTC stop
Queen St East at River St1 min walk
Nearest cycling route
River StCycle Track, 1 min walk
Nearest traffic count
12,563 vehicles in 14 hQueen St E / River St, 60 m away, Jun 25, 2025
Serious collisions within 500 m
52021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 2 with cyclists
Parks
King/Queen Triangle1 min walk
Corktown Common1 min walk
Louis March Park3 min walk

Schools within 1 km

  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 6 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 8 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • QUEEN ALEXANDRA MDL SCHOOL English Public 11 min walk
  • SEED ALTERNATIVE SCHOOL English Public 11 min walk
  • LIBERTY PREP SCHOOL Private 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRegent ParkMedian neighbourhood
Median household income (2020)$65,500$84,500
Households that own their home30%54%
Population (2021)12,75016,813
Homes built in 1960 or before13%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRegent ParkCity median
Assault947.8636.3
Robbery83.569.5
Shootings610.5
Auto theft95.4192.6
Theft over $5,00011.946.1
Break and enter166.9172.8
Theft from vehicles125.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.