Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 open by-law investigation
Needs a closer lookNot resolved in the City's records: 26 160976 PRS 00 IR (Property Standards, 2026, status Rescheduled).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations3 building permits open, the oldest since 2011
Needs a closer lookStill open in the City's records: 20 138298 (Proposed installation of new metal cladding at 25 & 37 Eden Place, 2020, status Permit Issued); 11 302641 (Proposal to upgrade existing fire alarm system in rowhouses and apartment building of c..., 2011, status Inspection); 11 194495 (Proposal to upgrade existing fire alarm system in rowhousing and apartment building of..., 2011, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 26 218248 (Proposal for Underground Parking Garage Repair and Front entrance stair replacement, 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications5 development applications open within 300 m
Good to know5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
10 records on file: more than at 99% of Toronto houses (median 0).
- Building permit26 218248Permit Issued
Proposal for Underground Parking Garage Repair and Front entrance stair replacement.
Sep 11, 2026 · 11 EDEN PL - By-law investigation26 181153 LGW 00 IVClosed
Notice Issued Long Grass
May 15, 2026 · 35 EDEN PL - By-law investigation26 161632 WST 00 IRRescheduled
Waste
May 15, 2026 · 35 EDEN PL - By-law investigation26 161629 LGW 00 IRClosed
Long Grass and Weeds
May 15, 2026 · 35 EDEN PL - By-law investigation26 160976 PRS 00 IRRescheduled
Property Standards
May 14, 2026 · 33 EDEN PL - Zoning review25 226184 ZAPCancelledSep 16, 2025 · 11 EDEN PL
- Building permit20 138298Permit Issued
Proposed installation of new metal cladding at 25 & 37 Eden Place
May 7, 2020 · 11 EDEN PL - Building permit11 302641Inspection
Proposal to upgrade existing fire alarm system in rowhouses and apartment building of co-op (4 levels effected in total).Convenience address: 25 Eden place
Nov 29, 2011 · 11 EDEN PL
Show 2 older records
- Building permit11 194495Inspection
Proposal to upgrade existing fire alarm system in rowhousing and apartment building of co-op.Convenience address is 15 Eden place.
Jun 10, 2011 · 11 EDEN PL - Building permit99 108316Closed
CONSTRUCT WIRE MESH ENCLOSURE AT ENTRANCEWAY IN UNDERGROUND PARKING GARAGE. N. B. CONVENIENCE ADDRESSES: 17 AND 25 EDEN PLACE. EDC
Jan 5, 2000 · 11-37 EDEN PL
Check before you build
Site-specific exception 900.2.10(853)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The lands must comply with exception 900.2.10(4)
- Older by-law A
Section 12(2) 208 of former City of Toronto By-law 438-86
5 parts for other addresses
- B On 25 Augusta Ave.: (i) a religious residence may be combined with other permitted uses on the lot ; (ii) a rooming house with no more than 16 rooms providing …
- B On 91 Augusta Ave., former City of Toronto by-law 60-67
- C On 165 Grange Ave., former City of Toronto by-law 164-71
- D On 77 Ryerson Ave., former City of Toronto by-law 163-71
- E On 20 Vanauley St., former City of Toronto by-law 680-83.
Lot facts
- Area
- 3,836 m²
- Frontage
- 65.3 m
- Depth
- 61.2 m
- Street
- Eden Pl
- Corner lot
- No
- Public lane
- Linda Griffiths Lane, 129.4 m along it
- House footprint
- 613 m²roof up to 13.8 m
- Back yard
- 26.3 mhouse to rear lot line
- Side yards
- 7.5 m and 13.8 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- 13 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: King-Bathurst. The lot is inside the King-Bathurst Major Transit Station Area approved by the Province (Site and Area Specific Policy 761). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone R (d1.0) (x853) (Residential). Chapter 10, section 10.10 of the by-law. Source
Around this lot
- Minor variances approved
- 86%25 of 29 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 9
- Multiplex permits
- 10
- Development applications
- 12
Within 300 m, last 10 years. 20 suite and multiplex permits: more than at 88% of Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.
42 CARR ST · Nov 4, 2026 · 112 m away - Minor varianceRefused
To construct a new three-storey detached apartment building with front (east), rear (west) and side yard (south) basement walkouts, a below-grade patio on the side yard (south), front and rear porches with stairs, a side yard (south) ground floor entrance with stairs, front, rear and side (south) second storey and third storey balconies, and roof access (for mechanical equipment).Also, to construct a new rear two-storey detached ancillary building (laneway suite) containing three dwelling units, a basement, and roof access (for mechanical equipment). There will be waste storage located in the basement and two-short-term bicycle parking spaces in the front yard. Also, there will be a total of twelve residential dwelling units on this lot (nine units within the main dwelling and three units in the ancillary building).
74 MARKHAM ST · Oct 14, 2026 · 236 m away - Minor varianceApproved
To construct a new rear two-storey detached ancillary building (containing two laneway suites, each occupying the basement, first, and second levels) with a side (west) cantilever second storey. There will be a total of three residential dwelling units on this lot (one unit occupying the main dwelling, and two units occupying the ancillary building).
129 PALMERSTON AVE · Sep 9, 2026 · 386 m away - Minor varianceApproved
To alter the existing two-storey townhouse dwelling by constructing a new partial rear two-storey addition (to replace the existing partial rear two-storey addition) and a rear stone patio. The existing rear one-storey detached ancillary building (garage) will be demolished.
157 WOLSELEY ST · Jul 15, 2026 · 288 m away - Minor varianceApproved
To legalize and to maintain the canopy (along the south side and east rear side of the dwelling), which was constructed without an authorized building permit.
123 PALMERSTON AVE · Apr 15, 2026 · 373 m away
Latest activity nearby
- Zoning review
Not Started
632 QUEEN ST W · Nov 10, 2026 · 274 m away - Zoning review
Closed
474 QUEEN ST W · Nov 9, 2026 · 286 m away - Building permit
1 Wall Sign*****Mark Health Network*****
575 QUEEN ST W · Nov 5, 2026 · 256 m away - Minor varianceApproved
To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.
42 CARR ST · Nov 4, 2026 · 112 m away - Building permit
Proposal for interior alteration of existing office for new model suite.
555 RICHMOND ST W · Nov 3, 2026 · 290 m away - Building permit
INTERIOR ALTERATION OF EXISTING OFFICE FOR NEW MODEL SUITE.
555 RICHMOND ST W · Nov 2, 2026 · 290 m away - Zoning review
Closed
588 RICHMOND ST W · Oct 29, 2026 · 242 m away - Building permit
Interior Alterations involving chanage of use from retail to fitness studio, installing male/female change rooms, a universal WC, one new studio room, minor HVAC/Electrical work.
610 QUEEN ST W · Oct 23, 2026 · 211 m away - Building permit
REV01: Revising the roof parapet and guard.Proposal for fire damage repairs on roof wooden deck on top of the steel frame roof - Roof parapet to be repaired to match pre-loss conditions. Interior Finishes (Second and Third Floors):Localized removal and replacement of smoke/water-damaged finishes. All finishes - Second-floor ceiling below the wooden deck to be rebuilt - Remove and replace the fire-damaged exterior door within the residential unit (leading to the roof deck), matching pre-loss design and function.
14 MARKHAM ST · Oct 23, 2026 · 219 m away - Building permit
Repair of the existing detached wood-frame garage at the rear of the lot (32 Augusta Avenue), replacing deteriorated wall studs, plates, roof joists, roof deck, roofing, cladding and lane doors in kind. No addition, no demolition, no change of use, no change to the footprint or height.
32 AUGUSTA AVE · Oct 19, 2026 · 269 m away
Neighbourhood: Kensington-Chinatown
About the area around the lot, not the lot itself.
- Nearest station
- Osgoode Station22 min walk
- Nearest TTC stop
- Bathurst St at Carr St1 min walk
- Nearest cycling route
- Denison AveBike Lane - Contraflow, 3 min walk
- Nearest traffic count
- 12,323 vehicles in 14 hBathurst St / Robinson St, 80 m away, Jul 30, 2026
- Serious collisions within 500 m
- 92021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 1 with cyclists
- Parks
- Alexandra Park2 min walk
- Randy Padmore Park3 min walk
- ALEX WILSON COMMUNITY GARDEN - Open Green Space5 min walk
Schools within 1 km
- RYERSON COMMUNITY SCHOOL & DOWNTOWN VOCAL MUSIC ACADEMY English Public 5 min walk
- ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
- CHARLES G FRASER JR PUBLIC SCHOOL English Public 8 min walk
- ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 9 min walk
- NIAGARA STREET JR PUBLIC SCHOOL English Public 11 min walk
- OGDEN JR PUBLIC SCHOOL English Public 11 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Kensington-Chinatown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $62,000 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 18,120 | 16,813 |
| Homes built in 1960 or before | 26% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Kensington-Chinatown | City median |
|---|---|---|
| Assault | 2017.5 | 636.3 |
| Robbery | 193 | 69.5 |
| Shootings | 21.9 | 10.5 |
| Auto theft | 118.4 | 192.6 |
| Theft over $5,000 | 219.3 | 46.1 |
| Break and enter | 443 | 172.8 |
| Theft from vehicles | 850.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.