HousePrecheckCheck an address

11 Dockside DrToronto · zoning, lot size and permit records

≈ 43.0 × 116.2 m4,170 m²on Dockside Dr

Not a home

Sugar Beach Park

The City of Toronto's real estate inventory lists Sugar Beach Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 6 development applications open within 300 m, up to 22 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N50 m
≈ 43.0 m frontage≈ 116.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (7% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Natural Heritage System (31% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 22 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit23 154704Closed

    Temporary stage truss structure being built for a 2 day concert at Sugar Beach during Pride weekend. This is an LGBTQ+ event. . Frontier Sound and Light to build a temporary stage. Stage will be located on the cement and not on the beach. The stage will be set up on June 22 and 23. The event runs June 24 and 25. Load out on June 26. The stage deck is 19ft w x 17'1" = 323 square' = 30meterssquared. The front of the stage will have video wings which make the stage in total 62 square meters however there is no decking behind the wings

    Jun 12, 2023 · 11 DOCKSIDE DR
  • Building permit22 232328Closed

    install temporary metal cube structure 12x12x8 at Sugar Beach Park for outdoor artwork Design Festival January 12-April 3, 2023

    Dec 5, 2022 · 11 DOCKSIDE DR
  • Building permit19 164864Closed

    erect 8 temporary tents for festival June 12-17, 2019 certified #'s 15-159491 (2 tents), 15-159495 (6 tents)

    Jun 10, 2019 · 11 DOCKSIDE DR
  • Building permit18 171448Closed

    CERTIFIED TEMPORARY TENTS - 1 - 20ft x 50 and 1 - 20ft x 40 ft Std Pipe Frame (Cert # 14 251050),1-15ft x 60ft and 1-15ft x 50ft Std Pipe Frame tents. (Cert #14 251051). ANCHORED with Concrete Blocks.INSTALLED - June 18th to 24th, 2018.

    Jun 14, 2018 · 11 DOCKSIDE DR
  • Building permit17 169266Closed

    4 CERTIFIED TEMPORARY TENTS FOR SUGAR BEACH, 1 - 20ft x 40 ft (Cert # 15-159495),2-15ft x 60ft (Cert #15-159491) and 1-15ft x 50ft (Cert #15-159491).

    Jun 1, 2017 · 11 DOCKSIDE DR
  • Building permit16 171164Closed

    4 CERTIFIED TEMPORARY TENTS, 1 - 20ft x 40 ft Std Pipe Frame (Cert # 14 251050), 1-15ft x 160ft and 2-15ft x 50ft Std Pipe Frame tents. (Cert #14 251051). ANCHORED with Concrete Blocks. INSTALLED - June 14th to 20th, 2016.

    Jun 13, 2016 · 11 DOCKSIDE DR
  • Building permit15 157424Closed

    Proposal to install 5 certified temporary tents, 1 _ 15 ft x 100 ft & 1_ 15 ft x 160 ft Std Frame Tents (Cert # 14 251049), 1_ 20 ft x 50 ft, 1_ 20 ft x 60 ft & 1_ 20 ft x 80 ft Std Frame Tent (Cert # 14 251050) June 15th to 22nd, 2015

    May 19, 2015 · 11 DOCKSIDE DR
  • Building permit14 169843Closed

    Proposal to erect 5 certified temporary tents, (1) 15 ft x 100 ft & (1) 15 ft x 160 ft std frame tents (Cert # 11 167031), (1) 20 ft x 50 ft, (1) 20 ft x 60 ft & (1) 20 ft x 80 ft std frame tent (Cert # 11 167047) June 17th to 23th, 2014

    Jun 12, 2014 · 11 DOCKSIDE DR
Show 2 older records
  • Building permit13 183364Closed

    Proposal to erect 6 certified tents for Toronto Wine and Spirit Festival on June 12th 2013 and to be dismantled on June 17th 2013. Certified Tents (3 @ 11-167031 and 3 @ 11-167047)

    Jun 11, 2013 · 11 DOCKSIDE DR
  • Building permit12 191220Closed

    This is for the installation of six(6) certified tents within Sugar Beach Park for the Wine and Spirit Festival from June 21 - June 23, 2012. These are certified tents and the reference numbers can be found on the site plan at the right hand side.

    Jun 14, 2012 · 11 DOCKSIDE DR

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,170 m²
Frontage
43 mestimated, irregular lot
Depth
116.2 mestimated, irregular lot
Street
Dockside Dr
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: hackberry (7 cm), oak, red (7 cm), elm, american valley forge (7 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
18

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the 21-storey mixed-use building (as approved under Site Specific Zoning By-law 411-2021 (LPAT)) by permitting the increase of the maximum permitted number of compact parking spaces from 19 compact parking spaces to 23 compact parking spaces (including one accessible compact parking space). There will be a total of 463 residential dwelling units on this lot, as well as retail space at-grade, and a total of 190 parking spaces within a 4-level below grade parking garage.

    162 QUEENS QUAY E · Sep 3, 2025 · 171 m away
  • Minor varianceApproved

    To permit the reduction of residential parking spaces and types, residential amenity space provided, and tower heights to the 85 ,78, and 70-storey buildings, currently under review by Site Plan Control Application (File Number 20 19218252 STE 10 SA). There will be a total of 2,640 residential dwelling units (with 188 affordable units) within this block (Block4).

    55 LAKE SHORE BLVD E · Oct 23, 2024 · 479 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 674-2020(LPAT)), for an existing 25-storey commercial building (shown as Block 1 on Map 4), by permitting a clinic use.

    100 QUEENS QUAY E · Apr 17, 2024 · 288 m away
  • Minor varianceApproved

    To construct two mixed-use buildings, including two tower elements (22- and 18-storeys) and a 14-storey mid-rise element above a five-storey podium.

    178 QUEENS QUAY E · Jul 21, 2021 · 182 m away
  • Minor varianceApproved

    To construct an 11-storey mixed use building with retail space at-grade, office space above and one level of below-grade parking.

    261 QUEENS QUAY E · Jul 8, 2020 · 486 m away

Latest activity nearby

  • Building permit

    REPLACE THE POWER SUPPLY FOR THREE EXISTING MAG-LOCKS ON THE 7TH FLOOR

    155 QUEENS QUAY E · Nov 18, 2026 · 108 m away
  • Building permit

    Proposal to erect a 10" x 12" gantry on 9/26/26 for use as our finish line for the Bay Street Rides FAR (Autism Science Foundation). Removal of the structure on 9/27/26

    61 DOCKSIDE DR · Sep 14, 2026 · 240 m away
  • Building permit

    Proposed interior alterations to suite 700.

    155 QUEENS QUAY E · Sep 3, 2026 · 108 m away
  • Building permit

    REV 03: REVISION PER BUBBLE DRAWINGSREV02: CANCELLED - Proposed revision to layout as per drawingsRevision 01 to permit 25 116964 BLD 00 BAProposal for interior alterations including 4 new washrooms, 1 new universal washroom, a new kitchenette and new offices. See related permit no. 25 197884 BLD 00 BA.

    100 QUEENS QUAY E · Aug 24, 2026 · 288 m away
  • Building permit

    REV03: Scope of revision related to plumbing work for the mop sink.Revision 01 to permit 25 197884 BLD 00 BA: addition of a low wall near mop sink.Proposal for interior alterations to existing storage room to convert to office unit. See related permit no. 25 116964 BLD 00 BA

    100 QUEENS QUAY E · Aug 10, 2026 · 288 m away
  • Building permit

    Proposal to install eight (8) electromagnetic locks.

    215 LAKE SHORE BLVD E · Aug 7, 2026 · 257 m away
  • Zoning review

    Closed

    130 QUEENS QUAY E · Jul 23, 2026 · 136 m away
  • Building permit

    PROPOSED HVAC SCOPE FOR FIT-OUT FOR MEETING ROOMS, OPEN OFFICE & SERVERY - SEE PERMIT 25 234244

    100 QUEENS QUAY E · Jun 25, 2026 · 288 m away
  • Building permit

    Renovation to an existing classroom and office spaces for the Université de l'Ontario français.

    143 LAKE SHORE BLVD E · May 20, 2026 · 240 m away
  • Building permit

    Renovation to an existing classroom and office spaces for the Université de l'Ontario français.Convenience address is 9 Lower Jarvis St

    11 LOWER JARVIS ST · May 19, 2026 · 233 m away

Neighbourhood: St Lawrence-East Bayfront-The Islands

About the area around the lot, not the lot itself.

Nearest station
Queens Quay/Ferry Docks Station13 min walk
Nearest TTC stop
Queens Quay East at Lower Jarvis St2 min walk
Nearest cycling route
Martin Goodman TrlMulti-Use Trail - Boulevard, 2 min walk
Nearest traffic count
1,373 vehicles in 8 hQueens Quay E / Dockside Dr / Richardson St, 110 m away, Sep 12, 2019
Serious collisions within 500 m
92021–2026, killed or seriously injured: 3 fatal, 5 with pedestrians, 4 with cyclists
Parks
Sugar Beach Park1 min walk
Water's Edge Promenade1 min walk
120 Queens Quay E Park2 min walk

Schools within 1 km

  • GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 3 min walk
  • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 9 min walk
  • DOWNTOWN ALTERNATIVE SCHOOL English Public 9 min walk
  • MARKET LANE JR & SR PUBLIC SCHOOL English Public 12 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 14 min walk
  • VOICE INTEGRATIVE PRIVATE SCHOOL Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home40%54%
Population (2021)31,28516,813
Homes built in 1960 or before3%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
Assault1059.7636.3
Robbery96.369.5
Shootings4.510.5
Auto theft24.6192.6
Theft over $5,00078.446.1
Break and enter163.5172.8
Theft from vehicles163.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.