Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2015
Needs a closer lookStill open in the City's records: 13 166676 (interior alterations to construct wheelchair accessible ramp within lobby, 2015, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)2 by-law investigations closed in the last two years
Good to knowClosed files (Property Standards): 26 117746 PRS 00 IR (Property Standards, 2026); 25 100946 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsRental building evaluation: 95 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (12 storeys, 167 units, built 1971).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
9 records on file: more than at 99% of Toronto houses (median 0).
- By-law investigation26 119191 SNI 00 IRClosed
Snow and Ice
Feb 20, 2026 · 11 ANTRIM CRES - By-law investigation26 117746 PRS 00 IRClosed
Property Standards
Feb 17, 2026 · 11 ANTRIM CRES - By-law investigation26 105392 SNI 00 IRClosed
Snow and Ice
Jan 15, 2026 · 11 ANTRIM CRES - By-law investigation25 100946 PRS 00 IRClosed
Property Standards
Jan 4, 2025 · 11 ANTRIM CRES - Building permit17 202079Closed
To erect and display one non-illuminated ground sign displaying static copy associated with an apartment building on the premises, measuring 1.52 m by 0.97 m at a height of 1.87 m, located on the northerly property frontage. **11 ANTRIM CRESCENT RENTAL INQUIRIES**
Oct 13, 2017 · 11 ANTRIM CRES - Building permit13 166676Permit Issued
interior alterations to construct wheelchair accessible ramp within lobby
Jun 1, 2015 · 11 ANTRIM CRES - Building permit11 242037Closed
Garage repair/reconstruction- repair concrete roof slab
Aug 5, 2011 · 11 ANTRIM CRES - Building permit09 186055Closed - Dormant
install 1 backflow preventor
Nov 19, 2009 · 11 ANTRIM CRES
Show 1 older records
- Building permit08 143573Closed
balcony slab repairs (260sq.m) and new balcony railings (1100 l.m)
Apr 9, 2008 · 11 ANTRIM CRES
Check before you build
Site-specific exception 900.8.10(3)
Needs a closer look11 site-specific rules apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The minimum building setback from a front lot line is 12.0 metres
- Rule B
The minimum building setback from a side lot line and rear lot line is a distance equal to half the height of the building
- Rule C
The maximum lot coverage is 15%
- Rule D
The maximum floor space index is 1.5
- Rule E
The minimum separation between the above ground main wall of two residential buildings on the same lot is a distance equal to half the total combined height of the two buildings
- Rule F
A below grade parking structure may be in a yard
- Rule G
The minimum building setback for a below grade parking structure is a distance equal to the vertical distance between the surface of the lowest floor of the structure and the average elevation of grade along the front lot line
- Rule H
Indoor amenity space must be provided at a minimum rate of 46 square metres for the first dwelling unit plus 0.9 square metres for each dwelling unit in excess of 50
- Rule I
A minimum of 209 parking spaces must be provided on the lot , of which a minimum of 128 parking spaces must be underground
- Rule J
A minimum of 40% of the lot area must be landscaping
- Rule K
The maximum number of dwelling units must be no more than the sum of: The total number of Bachelors x 1.5, the total number of 1-Bedroom units x 2.25, the total number of 2-bedroom units x 3.25, the total number of 3-bedroom units x 4.25, must not exceed 401 times the lot area in hectares; and, in no case, may 2-bedroom units exceed 31% of the total number of units, and 3-bedroom units may not exceed one per floor.
Lot facts
- Area
- 11,294 m²
- Frontage
- 66 m
- Depth
- 172.2 m
- Street
- Antrim Cres
- Corner lot
- No
- Public lane
- None
- House footprint
- 1,435 m²roof up to 39.9 m
- Back yard
- 72.7 mhouse to rear lot line
- Side yards
- 20.7 m and 25.6 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- 33%
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 75%3 of 4 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 4
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Proposed Re-Piping of Incoming Water Main for the Building
2 GLAMORGAN AVE · Nov 16, 2026 · 123 m away - Building permit
Proposal for a a temporary (seasonal) structure (to be used as a Garden Center) that will go in the parking lot of Metro for Summer 2027 Installation from April 1st to June 30th, 2027 (approximately 13 weeks).
16 WILLIAM KITCHEN RD · Nov 2, 2026 · 212 m away - Building permit
DCW and DHWR Plumbing Header/Branches and Sanitary Drainage Headers/Stacks Offsets Replacement. In addition to Ground Floor and Top Floor Ceiling Replacement in the Hallways
7 GLAMORGAN AVE · Oct 21, 2026 · 296 m away - Building permit
Proposed balcony restoration including removal of existing precast concrete balustrades, structural concrete repairs to balcony slabs, slab edges, soffits, shear walls and roof canopies, installation of new waterproofing membrane system, new aluminium and tempered glass guardrails, metal privacy dividers, concrete painting and all associated restoration work.
120 DUNDALK DR · Sep 28, 2026 · 246 m away - Building permit
Garage concrete repairs to existing building
2 GLAMORGAN AVE · Sep 3, 2026 · 123 m away - Building permit
REV 01: proposed change the building classification, and provide new fire seperation details for the floor systemProposed construct new 2nd floor addition over top of an existing warehouse.
12 PROGRESS AVE · Aug 31, 2026 · 252 m away - Zoning review
Notice Sent
4 ANTRIM CRES · Aug 10, 2026 · 150 m away - Building permit
DCW and DHWR Plumbing Header/Branches and Sanitary Drainage Headers/Stacks Offsets Replacement.
7 GLAMORGAN AVE · Jul 6, 2026 · 296 m away - Zoning review
Closed
12 WILLIAM KITCHEN RD · May 14, 2026 · 260 m away - Zoning review
Cancelled
9 PROGRESS AVE · Mar 13, 2026 · 278 m away
Neighbourhood: Dorset Park
About the area around the lot, not the lot itself.
- Nearest station
- Agincourt GO Station24 min walk
- Nearest TTC stop
- Kennedy Rd at Antrim Cres South Side2 min walk
- Nearest traffic count
- 31,791 vehicles in 8 hKennedy Rd / Antrim Cres, 170 m away, Dec 19, 2018
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Glamorgan Park4 min walk
- Mondeo Park9 min walk
- Jolly Way Park11 min walk
Schools within 1 km
- ENQUIRING MINDS MONTESSORI AND LONDON SCHOOL OF DANCE Private 5 min walk
- GLAMORGAN JR PUBLIC SCHOOL English Public 7 min walk
- ELLESMERE STATTON PUBLIC SCHOOL English Public 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Dorset Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $79,000 | $84,500 |
| Households that own their home | 60% | 54% |
| Population (2021) | 24,305 | 16,813 |
| Homes built in 1960 or before | 26% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Dorset Park | City median |
|---|---|---|
| Assault | 672 | 636.3 |
| Robbery | 112.6 | 69.5 |
| Shootings | 18.2 | 10.5 |
| Auto theft | 356 | 192.6 |
| Theft over $5,000 | 72.6 | 46.1 |
| Break and enter | 192.5 | 172.8 |
| Theft from vehicles | 334.2 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.