HousePrecheckCheck an address

1089 Ossington AveToronto · zoning, lot size and permit records

Also 1090 Shaw St

Open space · O (x44)26.3 × 184.5 m4,633 m²on Ossington Avebacks onto Ln W Shaw S Acores

Not a home

Garrison Creek Park

The City of Toronto's real estate inventory lists Garrison Creek Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 1 development application open within 300 m, up to 19 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
N50 m
26.3 m frontage184.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 19 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit98 015950Closed - Dormant

    CONSTRUCT 10 PAIRS OF SEMI-DETACHED HOUSES WITH PRIVATE DETACHED GARAGES. (BLOCK H - LOTS 81 TO 100 INCLUSIVE) (UNIT TYPE - A3, B3, BL3, C3)

    Aug 5, 1998 · 1090 SHAW ST
  • Building permit98 015937Closed - Dormant

    CONSTRUCT 7 PAIRS OF SEMI-DETACHED HOUSES WITH PRIVATE DETACHED GARAGES. (BLOCK C - LOTS 9 TO 22 INCLUSIVE) (UNIT TYPES - A2, B2, BL2, C2)

    Aug 5, 1998 · 1090 SHAW ST
  • Building permit98 012111Closed - Dormant

    CONSTRUCT 3 STOREY AND BASEMENT SEMI-DETACHED HOUSE (1 PAIR). HOLD FOR SURVEY APPROVAL

    Aug 5, 1998 · 1090 SHAW ST
  • Building permit98 015947Closed - Dormant

    CONSTRUCT DETACHED HOUSE WITH PRIVATE DETACHED GARAGE. (BLOCK G - LOT 76) (UNIT - B3S) COST INCL. 411525 (SEE #411525 FOR PLANS AND ALL INFORMATION)

    Jul 28, 1998 · 1090 SHAW ST
  • Building permit98 015940Closed - Dormant

    CONSTRUCT 2 PAIR OF SEMI-DETACHED HOUSES. (BLOCK G - LOTS 77, 78, 79 & 80) (UNITS - B1, C1)

    Jul 28, 1998 · 1090 SHAW ST
  • Building permit98 015933Closed - Dormant

    CONSTRUCT 2 PAIRS OF SEMI-DETACHED HOUSES. (BLOCK B - LOTS 5, 6, 7 & 8) (UNIT TYPES - A1, B1)

    Jul 28, 1998 · 1090 SHAW ST
  • Building permit98 015929Closed - Dormant

    CONSTRUCT 2 PAIRS OF SEMI-DETACHED HOUSES. (BLOCK A - LOTS 1, 2, 3 & 4) (UNIT TYPES C1 & C2)

    Jul 28, 1998 · 1090 SHAW ST
  • Zoning review81 030680 LTOClosed
    Sep 15, 1981 · 1090 SHAW ST

Check before you build

  • Site-specific exception 900.40.10(44)

    Needs a closer look

    1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.40.10(44)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands a transportation use that is a railway line is permitted. [TO: 438-86; 12 (1) 258]

  2. Older by-law A

    Section 12(1) 381 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(1) 382 of former City of Toronto By-law 438-86

1 part for other addresses
  • C On 340 Christie St., former City of Toronto by-laws 233-78, 105-78, 106-78, 484-79, and 169-81.
By-law 569-2013, Chapter 900

Lot facts

Area
4,633 m²
Frontage
26.3 m
Depth
184.5 m
Street
Ossington Ave
Corner lot
No
Public lane
Ln W Shaw S Acores, 135.4 m along it
Max height
14 m
Max lot coverage
—
  • Zone O (x44) (Open Space). Chapter 90, section 90.10 of the by-law. Source

Around this lot

Minor variances approved
100%29 of 29 decisions
Garden suite permits
2
Laneway suite permits
8
Multiplex permits
6
Development applications
5

Within 300 m, last 10 years. 16 suite and multiplex permits: more than at 84% of Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Not Started

    101 MARCHMOUNT RD · Nov 23, 2026 · 278 m away
  • Building permit

    Proposal to install rooftop solar PV system.

    39 ACORES AVE · Nov 18, 2026 · 56 m away
  • Zoning review

    Closed

    840 DUPONT ST · Nov 16, 2026 · 72 m away
  • Zoning review

    Not Started

    888 DUPONT ST · Nov 6, 2026 · 120 m away
  • Zoning review

    Notice Sent

    1162 OSSINGTON AVE · Nov 4, 2026 · 247 m away
  • Zoning review

    Notice Sent

    1162 OSSINGTON AVE · Nov 4, 2026 · 247 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition (which will be cantilevered beyond the existing rear one-storey addition) with a juliet balcony.

    178 YARMOUTH RD · Nov 4, 2026 · 280 m away
  • Building permit

    Add unprotected window opening to south elevation, facing public pathway.

    1152 SHAW ST · Nov 3, 2026 · 72 m away
  • Building permitsecondary suite

    Rev 01: Revision to remove front walk out. Proposal for second unit at the basement level including a separate front entrance staircase

    1177 OSSINGTON AVE · Oct 9, 2026 · 260 m away
  • Building permit

    REV: Revision to Standalone Shoring and Excavation Permit 26 110316 BLD 00 BA by adding Tiebacks to Ossington and Dupont Right of Way.Proposal for stand alone shoring and excavation for remediation purposes for future 17 storey mixed use building.

    888 DUPONT ST · Oct 8, 2026 · 120 m away

Neighbourhood: Wychwood

About the area around the lot, not the lot itself.

Nearest station
Ossington Station17 min walk
Nearest TTC stop
Ossington Ave at Salvador Allende Crt2 min walk
Nearest cycling route
Shaw StSharrows, 1 min walk
Nearest traffic count
11,157 vehicles in 14 hOssington Ave / Geary Ave, 120 m away, Oct 22, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Garrison Creek Park1 min walk
Frankel - Lambert Park2 min walk
Dupont-Shaw Parkette2 min walk

Schools within 1 km

  • ST BRUNO AND ST RAYMOND CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • UCHENNA ACADEMY Private 6 min walk
  • SACRE COEUR CATHOLIC ELEMENTARY SCHOOL French Separate 8 min walk
  • ESSEX JR SR & HAWTHORNE TWO BILINGUAL English Public 10 min walk
  • WINONA DRIVE SR PUBLIC SCHOOL English Public 11 min walk
  • ST BRUNO & ST RAYMOND CATHOLIC ELEMENTARY SCHOOL (FUTURE SITE) English Separate 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWychwoodMedian neighbourhood
Median household income (2020)$86,000$84,500
Households that own their home51%54%
Population (2021)12,80016,813
Homes built in 1960 or before53%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWychwoodCity median
Assault722636.3
Robbery2669.5
Homicide135.3
Auto theft188.6192.6
Theft over $5,00032.546.1
Break and enter234.1172.8
Theft from vehicles130.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.