Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
16 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Order Issued Property Standards, Property Standards, Zoning): 26 250578 PRS 00 IV (Order Issued Property Standards: The heating system is not in good repair and maintaine..., 2026); 26 250562 PRS 00 IR (Property Standards, 2026); 26 231129 ZON 00 IR (Zoning, 2026); and 13 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations19 development applications open within 300 m
Good to know19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications1 short-term rental registrations here
Good to know1 active short-term rental registration at this address (Apartment).
What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.
How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details
City of Toronto, Short-term Rental RegistrationsRental building evaluation: 96 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (11 storeys, 262 units, built 1959).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
27 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 250578 PRS 00 IVClosed
Order Issued Property Standards: The heating system is not in good repair and maintained in good working condition, specifically, pipes within wall cavity creating constant, excessive noise.
Oct 6, 2026 · 108 ISABELLA ST - By-law investigation26 250562 PRS 00 IRClosed
Property Standards
Oct 6, 2026 · 108 ISABELLA ST - By-law investigation26 231129 ZON 00 IRClosed
Zoning
Sep 2, 2026 · 108 ISABELLA ST - By-law investigation26 172143 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 108 ISABELLA ST - By-law investigation26 172142 000 00 IRClosed
Property Standards
Jun 1, 2026 · 108 ISABELLA ST - By-law investigation25 264791 PRS 00 IVClosed
Order Issued Property Standards: The heating system is not in good repair and maintained in good working condition, specifically, pipes within wall cavity creating constant, excessive noise.
Oct 29, 2025 · 550 JARVIS ST - By-law investigation25 246446 PRS 00 IRClosed
Property Standards
Oct 29, 2025 · 550 JARVIS ST - By-law investigation25 228028 PRS 00 IRClosed
Property Standards
Sep 19, 2025 · 550 JARVIS ST
Show 19 older records
- By-law investigation25 206804 ZON 00 IRClosed
Zoning
Aug 7, 2025 · 550 JARVIS ST - By-law investigation25 175516 PRS 00 IRClosed
Property Standards
Jun 11, 2025 · 550 JARVIS ST - By-law investigation25 166848 PRS 00 IRClosed
Property Standards
May 28, 2025 · 550 JARVIS ST - By-law investigation25 164336 PRS 00 IRClosed
Property Standards
May 23, 2025 · 550 JARVIS ST - By-law investigation25 146562 PRS 00 IRClosed
Property Standards
Apr 18, 2025 · 550 JARVIS ST - By-law investigation25 120113 HEA 00 IRClosed
Adequate Heat
Feb 21, 2025 · 550 JARVIS ST - By-law investigation25 103432 PRS 00 IVClosed
Order Issued Property Standards: The retaining wall is not being maintained in a structurally sound and/or plumb condition.Namely:; The retaining wall is not being maintained in good repair.Namely:Railroad ties along the landscaping Namely the retai
Jan 10, 2025 · 550 JARVIS ST - By-law investigation25 103140 PRS 00 IRClosed
Property Standards
Jan 10, 2025 · 550 JARVIS ST - Building permit21 244407Cancelled
To erect and display one ground sign**Park Property Management Inc**(Sign Variance 21-219463)
Dec 16, 2021 · 108 ISABELLA ST - Zoning review21 219463 ZSVClosedSep 29, 2021 · 108 ISABELLA ST
- Zoning review21 154759 ZPRClosedMay 14, 2021 · 108 ISABELLA ST
- Building permit19 111457Closed
Proposal for concrete repairs to the garage roof slab.
Mar 6, 2019 · 550 JARVIS ST - Building permit16 110428Closed
Installation of backflow prevention device
Feb 26, 2016 · 550 JARVIS ST - Building permit13 217758Closed
Proposal to repair and restore all balconies and replaces all guards within existing apartment building. 108 Isabella St (550 Jarvis St)
Sep 6, 2013 · 108 ISABELLA ST - Building permit06 168080Closed
Proposal to updrade audiobility and add horns to suites. Convenience address - 550 Jarvis St.
Sep 13, 2006 · 108 ISABELLA ST - Zoning review05 173283 ZSVClosedAug 22, 2005 · 108 ISABELLA ST
- Zoning review05 141517 ZPRClosedJun 9, 2005 · 108 ISABELLA ST
- Zoning review03 202556 ZPUClosedDec 23, 2003 · 108 ISABELLA ST
- Zoning review90 029042 LTOClosedNov 27, 1990 · 550 JARVIS ST
Check before you build
Site-specific exception 900.2.10(644)
Needs a closer look2 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The lands must comply with exception 900.2.10(4)
- Rule B
The minimum front yard setback is 6.0 metres.
- Older by-law A
Section 12(1) 434 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 4,999 m²
- Frontage
- 67.6 mestimated, irregular lot
- Depth
- 92 mestimated, irregular lot
- Street
- Jarvis St
- Corner lot
- Yes, also on Isabella St92 m along it
- Public lane
- None
- House footprint
- 1,779 m²roof up to 39.7 m
- Back yard
- 34.1 mhouse to rear lot line
- Side yards
- 5.9 m and 6.1 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- 30 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone R (d2.5) (x644) (Residential). Chapter 10, section 10.10 of the by-law. Source
- 9 City trees in front of this lot. The City's street tree inventory lists 9 trees at this address: maple, norway (28 cm), maple, norway (27 cm), maple, norway (27 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 86%12 of 14 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 7
- Development applications
- 33
Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-and-one-half-storey townhouse dwelling by enlarging the front third storey dormer and rear third storey terrace.
137 COLLIER ST · Aug 31, 2022 · 468 m away - Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.
50 EARL ST · Sep 15, 2021 · 370 m away - Minor varianceApproved
To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.
92 ISABELLA ST · Jun 30, 2021 · 59 m away - Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.
50 EARL ST · Dec 4, 2020 · 370 m away - Minor varianceApproved
To alter the existing three-storey mixed use building by converting a portion of the basement into a dwelling unit.
66 GLOUCESTER ST · Oct 8, 2020 · 254 m away
Latest activity nearby
- Building permit
Proposal for interior alterations to replace existing indoor diesel life-safety generator with new rooftop natural gas life safety generator.
77 HUNTLEY ST · Nov 18, 2026 · 298 m away - Building permit
Revision 01 - fire alarm upgrade to P1, P2, P3, P4, P5 and first and second floorFire Alarm Upgrade: to add strobes in the required area to address accessibility requirement, the rest existing fire alarm to remain.
1 MOUNT PLEASANT RD · Nov 18, 2026 · 151 m away - Minor varianceRefused
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.
235 BLOOR ST E · Nov 4, 2026 · 237 m away - Building permit
REV 01: Revision to permit to include two risers Proposal to replace heating riser.
110 CHARLES ST E · Oct 20, 2026 · 102 m away - Building permit
Office new fit out to accommodate new tenant. HVAC to reflect new ceiling.
175 BLOOR ST E · Oct 15, 2026 · 244 m away - Building permit
PROPOSED EXTERIOR WALL REPAIRS
620 CHURCH ST · Oct 5, 2026 · 197 m away - Building permit
Proposal for installation of an art work on the front face of existing building. Weight 150kg
519 CHURCH ST · Sep 25, 2026 · 297 m away - Zoning review
Cancelled
584 CHURCH ST · Sep 22, 2026 · 277 m away - Building permit
Maglock Installation
100 HAYDEN ST · Sep 9, 2026 · 184 m away - Building permit
Proposed interior alterations to unit 1101 to expand existing boardroom and add two (2) small offices.
175 BLOOR ST E · Aug 27, 2026 · 244 m away
Neighbourhood: Church-Wellesley
About the area around the lot, not the lot itself.
- Nearest station
- Sherbourne Station8 min walk
- Nearest TTC stop
- Bloor St East at Jarvis St4 min walk
- Nearest cycling route
- Bloor St ECycle Track, 4 min walk
- Nearest traffic count
- 10,208 vehicles in 8 hJarvis St / Isabella St, 80 m away, Dec 17, 2022
- Serious collisions within 500 m
- 142021–2026, killed or seriously injured: 1 fatal, 6 with pedestrians, 6 with cyclists
- Parks
- Charles Street Parkette1 min walk
- Barbara Hall Park4 min walk
- Wellesley - Magill Park6 min walk
Schools within 1 km
- THE ABELARD CENTRE FOR EDUCATION Private 4 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 4 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 5 min walk
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 5 min walk
- JARVIS COLLEGIATE INSTITUTE English Public 6 min walk
- NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Church-Wellesley | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $60,400 | $84,500 |
| Households that own their home | 24% | 54% |
| Population (2021) | 22,320 | 16,813 |
| Homes built in 1960 or before | 15% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Church-Wellesley | City median |
|---|---|---|
| Assault | 1264.6 | 636.3 |
| Robbery | 93.2 | 69.5 |
| Homicide | 3.3 | 5.3 |
| Auto theft | 46.6 | 192.6 |
| Theft over $5,000 | 106.5 | 46.1 |
| Break and enter | 146.4 | 172.8 |
| Theft from vehicles | 206.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.