Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2002
Needs a closer lookStill open in the City's records: 02 130792 (Make interior alterations to portion of the basement (rooms 70 & 72) for laboratory & o..., 2002, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 26 186557 (Incoming electrical and mechanical services are being installed from base building serv..., 2026); 26 158661 (Proposal for interior alterations on third and forth floor, 2026); 25 153160 (Revsion 01: Revision to approved kitchen layout.Proposal for interior fit-up for a new..., 2026); and 1 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A0403/03TEY (The applicant, the University of Toronto, is seeking relief from the provisions of the..., 2003).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)2 development applications open within 300 m
Good to know2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 9 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
32 records on file: more than at 100% of Toronto houses (median 0).
- Zoning review26 262083 LPRApplication AcceptableOct 29, 2026 · 112 COLLEGE ST
- Building permit26 186557Inspection
Incoming electrical and mechanical services are being installed from base building service rooms to tenant space. Work within space is being completed in a separate permit 25-126581.
Jul 14, 2026 · 112 COLLEGE ST - Building permit26 158661Permit Issued
Proposal for interior alterations on third and forth floor.
Jun 26, 2026 · 112 COLLEGE ST - Building permit26 153649Cancelled
Incoming electrical and mechanical services are being installed from base building service rooms to tenant space. Work within space is being completed in a separate permit.
May 1, 2026 · 112 COLLEGE ST - Building permit26 153625Cancelled
Incoming electrical and mechanical services are being installed from base building service rooms to tenant space. Work within space is being completed in a separate permit.
May 1, 2026 · 112 COLLEGE ST - Building permit25 153160Revision Issued
Revsion 01: Revision to approved kitchen layout.Proposal for interior fit-up for a new restaurant.
Apr 22, 2026 · 112 COLLEGE ST - Building permit25 177139Permit Issued
Proposal for interior fit-up for a new restaurant.
Jul 14, 2025 · 112 COLLEGE ST - Building permit25 126581Closed
Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two open workstation areas, a meeting room, a private breakout room, two private offices, a kitchen with dining area, a reception area, two storage areas, and space to accommodate existing private pods. New plumbing work for the kitchen is being proposed. New HVAC work to serve this office suite is being proposed. New electrical and lighting work are being proposed. All proposed HVAC, plumbing, electrical and lighting work will be tied back to existing base building systems. Existing sprinkler system inside suite to be revised to suit new interior layout. Existing structure is to remain with no change.
Mar 28, 2025 · 112 COLLEGE ST
Show 24 older records
- Building permit25 110033Closed
Interior alterations to offices in Unit 580
Feb 18, 2025 · 112 COLLEGE ST - Building permit24 155900Closed
1 GROUND SIGN**SCHWARTZ REISMAN****INNOVATION CAMPUS**
Jun 4, 2024 · 112 COLLEGE ST - Zoning review24 129008 LTOClosedApr 18, 2024 · 112 COLLEGE ST
- Building permit24 124628Closed
Proposal to construct Interior fit-out of a tenant suite on a multi-tenant floor, scope includes erection of non-bearing partitions, the re-alignment and redistribution of the Electrical and Mechanical and Life Safety systems.
Mar 26, 2024 · 112 COLLEGE ST - Zoning review24 121354 ZSVClosedMar 3, 2024 · 112 COLLEGE ST
- Building permit24 104910Cancelled
4 GROUND SIGN 1 WALL 2 WINDOW SIGN
Jan 15, 2024 · 112 COLLEGE ST - Zoning review23 237017 ZPRClosedDec 19, 2023 · 112 COLLEGE ST
- Building permit23 225700Closed
Proposal for interior alterations to a base building shell floor level 9 for landlord work to construct demising walls for a new multi-tenant corridor & to split the floor into 3 (vacant) tenant spaces. (Occupancy permits required for vacant shell office & institutional uses (classrooms).) [U of T Schwartz Reisman Innovation Campus (SRIC) - West Building.]
Dec 14, 2023 · 112 COLLEGE ST - Building permit20 107981Cancelled
REv#2- Building revisions to building permit 20 107981 BLD 01 NB. Provision for property owners and municipality to enter into a limiting distance agreement of 2.8m past the north property line to permit the removal of fire compartments and protecting construction to unprotected openings to the north elevation of the buildingREV #1-FIRE COMPARTMENT TO INCREASE UNPROTECTED OPENINGS TO NORTH ELEVATIONProposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 -147031 STE 11 SA, 19 160851 DEM, and 19 171637 BLD.
Sep 6, 2023 · 112 COLLEGE ST - Building permit21 228738Closed
Proposed 12 maglocks.- Electromagnetic Locking Devices to doors 2no. Level 1 D115K, D180S; 2no. Level 3 D370S, D325S; 2no. Level 8 , D870S, D825S; 1no. Level 11 D1100V; 1no. Level 12 D1200AV; 4no. Level 13 D1300AV, D1370S, D1325S, D1325V. Refer attached Architectural drawings.
Dec 3, 2021 · 112 COLLEGE ST - Building permit21 221343Approved
Proposal for alternative solution to address the approach to code compliance related to the omission of draft stops and closely spaced sprinklers, required by NFPA 13, "standard for the installation of automatic sprinklers" at minor construction of otherwise large floor openings between levels 01 and 02 of the project.
Oct 4, 2021 · 112 COLLEGE ST - Building permit21 142844Approved
Proposed alternative solution for egress from the Mechanical Penthouse to include fixed ladders conforming to sentence 3.6.1.5 (1)
Apr 19, 2021 · 112 COLLEGE ST - Zoning review19 147031 PSPClosedJun 30, 2020 · 112 COLLEGE ST
- Building permit19 160851Closed
REVISION - Demolition of below grade portion of Best Building at 112 College Street, including installation of caissons and complete shoring systemTo be read in conjunction with Permit 19 160851 DEM 0Proposal to demolish ONLY the above grade portions of an existing 5 storey vacant office building.ALSO REFER TO 19-160851 BLD 00 BA FOR RELATED ALTERATIONS TO 100 COLLLEGE ST
May 22, 2020 · 112 COLLEGE ST - Building permit20 107996Refused
Alternative solution to address the OBC requirement to restrict the unprotected openings in the exposing building faces with Close spaced sprinkler
Jan 23, 2020 · 112 COLLEGE ST - Zoning review18 260298 PRZClosedDec 2, 2019 · 112 COLLEGE ST
- Development application19 147031 STE 11 SAClosed
Proposed 13-storey (65 metres, including mechanical penthouse) institutional building with a gross floor area of approximately 17,270 square metres. The existing building on the site would be demolished.
Apr 30, 2019 · 112 COLLEGE ST · City file - Development application18 260298 STE 27 OZClosed
Zoning By-law Amendment application to permit a 13-storey (65 metres, including mechanical penthouse) institutional building with a gross floor area of approximately 17,900 square metres. The existing building on the site would be demolished.
Nov 23, 2018 · 112 COLLEGE ST · City file - Building permit15 177265Closed
modification & replacement of emergency lighting system
Aug 12, 2015 · 112 COLLEGE ST - Building permit03 126956Closed
Construct sunroom addition to south east elevation. (approximately 20.8 sq. m). Refer to C of A Decision. A.Osler 10/06/03
Nov 12, 2003 · 112 COLLEGE ST - Minor varianceA0403/03TEYApproved
The applicant, the University of Toronto, is seeking relief from the provisions of the Zoning By-law in order to construct a one-storey sunroom addition at the front of the building. The addition, which will extend the lounge/study area onto an existing landscaped terrace, will have dimensions of approximately 3.38 by 6.76 metres.
Sep 10, 2003 · 112 COLLEGE ST - Building permit02 130792Permit Issued
Make interior alterations to portion of the basement (rooms 70 & 72) for laboratory & office purposes. Also install skylight. (Best Institute)
Sep 16, 2002 · 112 COLLEGE ST - Building permit01 193717Closed
make interior alterations to portion of basement rooms 70 & 72, for wet lab researchbest institute
Dec 6, 2001 · 112 COLLEGE ST - Building permit01 164618Closed
Make interior alterations to portion of the first floor for seminar room and alter portion of the South elevation for door and window opening. Also make interior alterations to portions of the 3rd and 4th floor for research labs.
Aug 3, 2001 · 112 COLLEGE ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 2,848 m²
- Frontage
- 62.6 m
- Depth
- 45.7 m
- Street
- College St
- Corner lot
- No
- Public lane
- None
- House footprint
- 692 m²
- Back yard
- 11.4 mhouse to rear lot line
- Side yards
- 6.2 m and 25.2 mhouse to side lot lines
- Buildings on the lot
- 9house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%4 of 4 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 7
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.
27 GROSVENOR ST · Jul 30, 2025 · 402 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 621-2012(OMB), amending By-law 438-86), for the lot containing an existing three-storey vacant Heritage building (John Irwin House, municipally known as 9 Greenville Street) and the adjacent mixed-use condominium building (municipally known as 15 Grenville Street), by increasing the maximum permitted non-residential Gross Floor Area on the lot. Also, to permit medical/dental office and clinic uses that would be located on the ground, second, and third levels as well as within the basement of the existing three-storey Heritage building (John Irwin House).
9 GRENVILLE ST · Feb 19, 2025 · 455 m away - Minor varianceApproved
To alter the development standards for the 32-storey and 46-storey, two-tower mixed-use development (approved under Site Specific Zoning By-Law 1096-2021), by extending the temporary use permission for an elevator, which has already been constructed, to provide loading access to the adjacent site at 25 Grosvenor Street for a further period of three years.
27 GROSVENOR ST · Nov 27, 2024 · 402 m away - Minor varianceApproved
To permit the increase of non-residential gross floor area on the ground floor of the 38-storey mixed-use building (as approved under Site Specific By-Law 1263-2017).
480 YONGE ST · Nov 20, 2024 · 494 m away - Minor varianceApproved
To amend the development standards to permit the existing height of the four buildings on site (Hepburn Tower (11-storeys), Mowat Tower (24-storeys), Hearst Tower (10-storeys), and Ferguson Tower (14-storeys)) and to allow an increase in height of three of the buildings (Hepburn, Mowat, and Hearst towers) for the purpose of insulation and roof drainage.
900 BAY ST · Oct 4, 2023 · 365 m away
Latest activity nearby
- Building permit
Proposal for interior fit-out of new office space in existing office space.
700 UNIVERSITY AVE · Nov 23, 2026 · 215 m away - Building permit
POST-TENSIONED CABLE REPLACEMENT, LOCALIZED CONCRETE REPAIRS, NEW WATERPROOFING INSTALLATION
201 ELIZABETH ST · Nov 20, 2026 · 262 m away - Building permit
Interior alterations for a new medical office - Toronto Endoscopy Clinic - Unit 700
790 BAY ST · Nov 19, 2026 · 257 m away - Building permit
Interior demolition to the 3rd and 4th floors.
77 GRENVILLE ST · Nov 18, 2026 · 228 m away - Building permit
Interior fit-out of new office space to existing Group D occupancy on 16th floor.
700 UNIVERSITY AVE · Nov 6, 2026 · 215 m away - Building permit
Revision 01: selective demo, new partitions, new door & frames, modification to power, lights HVAC, sprinkler & new millwork, new finishes.Selective demo, new partitions, new doors & frames, modifications to power, lights, HVAC, sprinkler, replace sink (one for one), new millwork, new finishes.
150 COLLEGE ST · Nov 4, 2026 · 246 m away - Zoning review
Application Acceptable
112 COLLEGE ST · Oct 29, 2026 · 9 m away - Building permit
New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. - site services
790 BAY ST · Oct 29, 2026 · 257 m away - Building permit
New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. -Standpipe/sprinkler
790 BAY ST · Oct 29, 2026 · 257 m away - Building permit
New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. - Back flow preventer
790 BAY ST · Oct 29, 2026 · 257 m away
Neighbourhood: Bay-Cloverhill
About the area around the lot, not the lot itself.
- Nearest station
- Queen's Park Station2 min walk
- Nearest TTC stop
- College St at Queen's Park - Queen's Park Station1 min walk
- Nearest cycling route
- College StCycle Track, 1 min walk
- Nearest traffic count
- 34,374 vehicles in 14 hUniversity Ave / Queen's Park / College St, 110 m away, Jun 25, 2025
- Serious collisions within 500 m
- 52021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 1 with cyclists
- Parks
- McCaul - Orde Parkette6 min walk
- College Park6 min walk
- Queen's Park6 min walk
Schools within 1 km
- ORDE STREET JR PUBLIC SCHOOL English Public 5 min walk
- RONALD MCDONALD HOUSE Private 7 min walk
- ST JOSEPH'S COLLEGE SCHOOL English Separate 7 min walk
- TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 8 min walk
- THE YMCA ACADEMY SECONDARY SCHOOL Private 8 min walk
- SCHOOL OF GRADUATE STUDIES - U OF T, BLDG 43 University 11 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bay-Cloverhill | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $58,400 | $84,500 |
| Households that own their home | 30% | 54% |
| Population (2021) | 16,670 | 16,813 |
| Homes built in 1960 or before | 4% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bay-Cloverhill | City median |
|---|---|---|
| Assault | 601.9 | 636.3 |
| Robbery | 74.7 | 69.5 |
| Auto theft | 16.6 | 192.6 |
| Theft over $5,000 | 87.2 | 46.1 |
| Break and enter | 286.4 | 172.8 |
| Theft from vehicles | 145.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.