HousePrecheckCheck an address

107R Cottingham StToronto · zoning, lot size and permit records

Residential · R (d1.0) (x745)≈ 80.6 × 64.0 m3,635 m²on Marlborough Plbacks onto Ln E Sidney S Cottingham

Not a home

Cottingham Tennis Club

The City of Toronto's real estate inventory lists Cottingham Tennis Club here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • Major Transit Station Area: SummerhillThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 80.6 m frontage≈ 64.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Check before you build

    • Site-specific exception 900.2.10(745)

      Needs a closer look

      2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

      Zoning By-law 569-2013, Chapter 900
    Exception 900.2.10(745)Applies

    These parts of the exception apply to this lot's address.

    1. Older by-law A

      Section 12(2) 262 of former City of Toronto By-law 438-86

    2. Older by-law B

      Former City of Toronto By-law 880-79

    4 parts for other addresses
    • C On the lands municipally known as 8-10 Alcorn Ave. in 1988, Section 12 (2) 266(d) of former City of Toronto By-law 438-86
    • D On the even numbered addresses of 22-98A Alcorn Ave., the odd numbered addresses of 63-71 Walker Ave., former City of Toronto by-law 565-80
    • E On the lands municipally known as 46, 54, 60, 62, and 82 Birch Ave. in 1982, Section 12(1) 180 of By-law 438-86
    • F On the lands municipally known as 7 Gange Ave. in 1999, Section 12(1) 448 of former City of Toronto By-law 438-86.
    By-law 569-2013, Chapter 900

    Lot facts

    Area
    3,635 m²
    Frontage
    80.6 mestimated, irregular lot
    Depth
    64 mestimated, irregular lot
    Street
    Marlborough Pl
    Corner lot
    No
    Public lane
    Ln E Sidney S Cottingham, 12.8 m along it
    Max height
    12 m
    Max lot coverage
    —
    • Major Transit Station Area: Summerhill. The lot is inside the Summerhill Major Transit Station Area approved by the Province (Site and Area Specific Policy 720). Source
    • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
    • Zone R (d1.0) (x745) (Residential). Chapter 10, section 10.10 of the by-law. Source

    Around this lot

    Minor variances approved
    92%56 of 61 decisions
    Garden suite permits
    1
    Laneway suite permits
    5
    Multiplex permits
    8
    Development applications
    4

    Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 61 variance decisions: more than at 92% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition (cantilevered on the southeast side of the dwelling) with a rear covered balcony.

      89 MARLBOROUGH AVE · Jun 3, 2026 · 180 m away
    • Minor varianceApproved

      To alter the existing three-storey detached dwelling by constructing a rear two-storey addition (above the existing rear one-storey addition) with juliet balconies at the second and third storeys. The existing rear second storey outdoor terrace will be converted into habitable space. Also, to construct third storey dormers, and a new front porch canopy.

      23 POPLAR PLAINS CRES · Apr 15, 2026 · 340 m away
    • Minor varianceApproved

      To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear deck, a rear ground level deck with stairs, and a new front porch with stairs. The existing rear one-storey detached ancillary building (storage area) will be maintained and unaltered.

      38 WALKER AVE · Mar 4, 2026 · 431 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a two-storey rear addition with a ground floor deck with stairs, a rear third floor rooftop deck, and a new front porch with stairs.

      119 MACPHERSON AVE · Feb 18, 2026 · 168 m away
    • Minor varianceApproved

      To permit and to maintain the existing conversion of the rear two-car integral garage of the existing two-and-one-half-storey semi-detached dwelling into a one-car garage with a separate habitable space (kitchen extension). Also, to permit and to maintain the existing rear ground floor covered (awning) deck with stairs and the rear ancillary building (shed). Also, to reconstruct the existing rear second storey roof deck above the garage and the existing third storey roof deck.

      21 DUPONT ST · Feb 4, 2026 · 297 m away

    Latest activity nearby

    • Minor variancePending

      To construct a new one-storey detached ancillary building (garage containing two parking spaces), in the rear yard, abutting the private laneway.

      154 COTTINGHAM ST · Dec 9, 2026 · 124 m away
    • Minor variancePending

      To construct a new front yard parking pad, abutting Oaklands Avenue.

      13 OAKLANDS AVE · Nov 25, 2026 · 189 m away
    • Building permit

      Party wall admin permit related to roof and stairs beams

      156 COTTINGHAM ST · Nov 16, 2026 · 130 m away
    • Building permit

      REVISION 01: REVISION TO ENLARGE THE PROPOSED DECK AND ROOF STRUCTURE AND REMOVE THE EXISTING CARPORT IN THE REAR YARD .PROPOSED DECK AND ROOF STRUCTURE

      145 MARLBOROUGH PL · Nov 16, 2026 · 65 m away
    • Building permit

      PROPOSED FRONT YARD DECK STAIR ADDITION(scope revised to reinstate back to original deck on Nov 5, 2026)

      100 ALCORN AVE · Nov 16, 2026 · 271 m away
    • Minor variancePending

      In Process

      149 MARLBOROUGH PL · Nov 10, 2026 · 71 m away
    • Zoning review

      Notice Sent

      96 ROXBOROUGH ST W · Oct 30, 2026 · 227 m away
    • Building permit

      Proposed 3rd floor addition to an existing two storey semi detached with a rear balcony

      89 MARLBOROUGH AVE · Oct 27, 2026 · 180 m away
    • Zoning review

      Notice Sent

      149 MARLBOROUGH PL · Oct 15, 2026 · 71 m away
    • Zoning review

      Notice Sent

      154 COTTINGHAM ST · Oct 8, 2026 · 124 m away

    Neighbourhood: Yonge-St.Clair

    About the area around the lot, not the lot itself.

    Nearest station
    Summerhill Station8 min walk
    Nearest TTC stop
    Avenue Rd at Cottingham St3 min walk
    Nearest cycling route
    Ramsden Park TrlMulti-Use Trail - Existing Connector, 5 min walk
    Nearest traffic count
    374 vehicles in 8 hCottingham St / Sidney St, 110 m away, Jul 25, 2005
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 2 with cyclists
    Parks
    Robertson Davies Park1 min walk
    Marlborough Place Parkette1 min walk
    Lionel Conacher Park3 min walk

    Schools within 1 km

    • COTTINGHAM JR PUBLIC SCHOOL English Public 3 min walk
    • DE LASALLE COLLEGE SCHOOL Private 6 min walk
    • THE MABIN SCHOOL Private 9 min walk
    • THE YORK SCHOOL - MDL AND SR CAMPUS Private 11 min walk
    • JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 12 min walk
    • BROWN JR PUBLIC SCHOOL English Public 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYonge-St.ClairMedian neighbourhood
    Median household income (2020)$94,000$84,500
    Households that own their home40%54%
    Population (2021)12,90516,813
    Homes built in 1960 or before45%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYonge-St.ClairCity median
    Assault270.8636.3
    Robbery25.869.5
    Auto theft64.5192.6
    Theft over $5,00032.246.1
    Break and enter374172.8
    Theft from vehicles116.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.