HousePrecheckCheck an address

1079 Bathurst StToronto · zoning, lot size and permit records

Commercial residential · CR 2.0 (c1.0; r1.5) SS2 (x1922)8.6 × 31.6 m269 m²on Bathurst St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 1 development application open within 300 m, up to 16 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 245990 PRS 00 IV (Order Issued Property Standards: The yard is not being maintained free of heavy undergr..., 2026, status Order Issued); 26 245983 PRS 00 IR (Property Standards, 2026, status Order Issued).
  • Major Transit Station Area: DupontThe City plans more homes around the station: good for transit, and more building over time.
N10 m
8.6 m frontage31.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 245990 PRS 00 IV (Order Issued Property Standards: The yard is not being maintained free of heavy undergr..., 2026, status Order Issued); 26 245983 PRS 00 IR (Property Standards, 2026, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 25 246040 PRS 00 IV (Order Issued Property Standards, 2025); 25 245577 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 Committee of Adjustment files on this lot

    Good to know

    1 approved. A0447/18TEY (To construct a new five-storey mixed-use building containing seven dwelling units with..., 2019); SYS 3585701 (To construct a new four-storey mixed use building, 2014); A0659/14TEY (To construct a new four-storey mixed use building, 2014).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 16 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 245990 PRS 00 IVOrder Issued

    Order Issued Property Standards: The yard is not being maintained free of heavy undergrowth.; The yard is not being maintained free of weeds.

    Sep 29, 2026 · 1079 BATHURST ST
  • By-law investigation26 245983 PRS 00 IROrder Issued

    Property Standards

    Sep 29, 2026 · 1079 BATHURST ST
  • By-law investigation26 244910 WST 00 IVNotice Issued

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to

    Aug 19, 2026 · 1079 BATHURST ST
  • By-law investigation26 222455 WST 00 IRNotice Issued

    Waste

    Aug 19, 2026 · 1079 BATHURST ST
  • By-law investigation26 187692 LGW 00 IVClosed

    Notice Issued Long Grass

    Jun 9, 2026 · 1079 BATHURST ST
  • By-law investigation26 180700 LGW 00 IRClosed

    Long Grass and Weeds

    Jun 9, 2026 · 1079 BATHURST ST
  • By-law investigation25 246055 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to

    Oct 28, 2025 · 1079 BATHURST ST
  • By-law investigation25 246043 WST 00 IRClosed

    Waste

    Oct 28, 2025 · 1079 BATHURST ST
Show 10 older records
  • By-law investigation25 246040 PRS 00 IVClosed

    Order Issued Property Standards

    Oct 27, 2025 · 1079 BATHURST ST
  • By-law investigation25 245577 PRS 00 IRClosed

    Property Standards

    Oct 27, 2025 · 1079 BATHURST ST
  • Building permit21 173867Cancelled

    Conditional Permit - Part Permit - construct new 5 storey mixed use building, commercial at grade, 7 apartment units above

    Oct 1, 2021 · 1079 BATHURST ST
  • Minor varianceA0447/18TEYApproved

    To construct a new five-storey mixed-use building containing seven dwelling units with basement and ground floor retail.

    May 30, 2019 · 1079 BATHURST ST
  • Zoning review19 110909 ZPRClosed
    Feb 1, 2019 · 1079 BATHURST ST
  • Minor varianceSYS 3585701Pending

    To construct a new four-storey mixed use building.

    Sep 3, 2014 · 1079 BATHURST ST
  • Minor varianceA0659/14TEYPending

    To construct a new four-storey mixed use building.

    Sep 3, 2014 · 1079 BATHURST ST
  • Zoning review14 194580 PSPClosed
    Jul 22, 2014 · 1079 BATHURST ST
  • Zoning review13 254608 ZPRClosed
    Oct 22, 2013 · 1079 BATHURST ST
  • Zoning review12 276730 ZPRClosed
    Nov 9, 2012 · 1079 BATHURST ST

Check before you build

  • Site-specific exception 900.11.10(1922)

    Needs a closer look

    3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1922)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On a lot , a vehicle fuel station , vehicle washing establishment , vehicle service shop , vehicle repair shop , or public parking is not a permitted use. This exception does not apply to 528-532 Bloor St. W. and the block bounded by Huron St., Prince Arthur Avenue, St. George St., and Bloor St. W. except for the lands on the north side of Bloor St. W. within 28.96 metres of the intersection of Huron St. and Bloor St. W.; and [TO: 438-86; 12(2) 219]

  2. Rule B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 251 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  4. Older by-law A

    On a lot , a vehicle fuel station , vehicle washing establishment , vehicle service shop , vehicle repair shop , or public parking is not a permitted use. This exception does not apply to 528-532 Bloor St. W. and the block bounded by Huron St., Prince Arthur Avenue, St. George St., and Bloor St. W. except for the lands on the north side of Bloor St. W. within 28.96 metres of the intersection of Huron St. and Bloor St. W.; and [TO: 438-86; 12(2) 219]

  5. Older by-law B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 251 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86

  6. Older by-law C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
269 m²
Frontage
8.6 m
Depth
31.6 m
Street
Bathurst St
Corner lot
No
Public lane
None
Max height
12 m
Max lot coverage
—
  • Site and Area Specific Policy 465. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Dupont. The lot is inside the Dupont Major Transit Station Area approved by the Province (Site and Area Specific Policy 718). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Bathurst Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 2.0 (c1.0; r1.5) SS2 (x1922) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
89%33 of 37 decisions
Garden suite permits
1
Laneway suite permits
4
Multiplex permits
9
Development applications
11

Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 37 variance decisions: more than at 71% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the existing entertainment place of assembly (arts and cultural events) use within the existing one-storey non-residential building.

    918 BATHURST ST · Sep 23, 2026 · 453 m away
  • Minor varianceApproved

    To permit a total of one commercial unit on the main level, and three residential dwelling units (one unit on the main and second levels, one unit on the second level, and one unit on the third level) on this lot. The existing staircases along the side and rear walls, as well as the rear third level deck will be maintained and unaltered.

    1069 BATHURST ST · Apr 9, 2025 · 32 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Official Plan Amendment No. 704 and Site Specific Zoning By-law 65-2024) for a new 12-storey mixed-use building with a total of 135 residential dwelling units. This site is subject to a current Site Plan Control application (under File Number 22 191847 STE 11 SA).

    914 BATHURST ST · Nov 27, 2024 · 488 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey mixed-use building by constructing a three-storey addition above the rear one-storey portion of the building as well as rear terraces on the third and fourth storeys. Also, to convert one parking space within the existing integral garage into a pedestrian entrance and stairwell. There will be a total of three residential dwelling units and one parking space within this building. The existing commercial uses on the ground floor (coffee shop and coin laundry facility) will be maintained and unaltered.

    994 BATHURST ST · Nov 22, 2023 · 253 m away
  • Minor varianceApproved

    To construct a new five-storey mixed-use building containing seven dwelling units with basement and ground floor retail.

    1079 BATHURST ST · May 30, 2019 · 5 m away

Latest activity nearby

  • Building permit

    Commercial vehicle impact repairs

    468 DUPONT ST · Nov 20, 2026 · 79 m away
  • Zoning review

    Not Started

    843 PALMERSTON AVE · Nov 10, 2026 · 202 m away
  • Building permit

    Proposal for structural impact damage restoration.

    472 DUPONT ST · Nov 3, 2026 · 80 m away
  • Minor varianceRefused

    To construct a new rear two-storey detached ancillary building (containing a garden suite) with a new rear walkway and two bicycle parking spaces in the rear yard. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit in the ancillary building). The existing two-storey ancillary building (shed) will be demolished.

    179 HOWLAND AVE · Oct 21, 2026 · 279 m away
  • Zoning review

    Cancelled

    420 DUPONT ST · Oct 19, 2026 · 183 m away
  • Zoning review

    Closed

    430 DUPONT ST · Oct 6, 2026 · 162 m away
  • Building permit

    Interior renovations to existing 2.5 storey single family townhouse.

    204 HOWLAND AVE · Oct 2, 2026 · 192 m away
  • Building permit

    Proposal for Party Wall Admin related to 871 Palmerston Ave.

    869 PALMERSTON AVE · Sep 28, 2026 · 211 m away
  • Building permit

    Proposal for a second floor addition and interior alterations

    871 PALMERSTON AVE · Sep 28, 2026 · 200 m away
  • Building permit

    Proposal to install backwater valve

    271 ALBANY AVE · Sep 17, 2026 · 93 m away

Neighbourhood: Annex

About the area around the lot, not the lot itself.

Nearest station
Dupont Station10 min walk
Nearest TTC stop
Bathurst St at Dupont St1 min walk
Nearest cycling route
Palmerston AveSharrows, 4 min walk
Nearest traffic count
35,280 vehicles in 14 hDupont St / Bathurst St, 70 m away, Jul 3, 2025
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Vermont Square Park2 min walk
Cawthra Playground6 min walk
Jean Sibelius Square6 min walk

Schools within 1 km

  • ROYAL ST GEORGES COLLEGE SCHOOL - ADVANCEMENT Private 7 min walk
  • ROYAL ST GEORGE'S COLLEGE SCHOOL - JR SCHOOL Private 7 min walk
  • GEORGE BROWN COLLEGE - CASA LOMA CAMPUS College 7 min walk
  • ROYAL ST GEORGES COLLEGE SCHOOL - MAIN ADDRESS Private 7 min walk
  • ROYAL ST GEORGES COLLEGE SCHOOL - SEE HOUSE Private 7 min walk
  • ROYAL ST GEORGE'S COLLEGE- SR SCHOOL Private 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAnnexMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home41%54%
Population (2021)29,30016,813
Homes built in 1960 or before40%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAnnexCity median
Assault1080.9636.3
Robbery80.569.5
Homicide5.25.3
Shootings5.210.5
Auto theft116.9192.6
Theft over $5,000114.346.1
Break and enter387.1172.8
Theft from vehicles220.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.