HousePrecheckCheck an address

107 Roselawn AveToronto · zoning, lot size and permit records

Residential · R (d0.6) (x767)22.9 × 40.6 m928 m²on Roselawn Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 21 rental units, built 1954More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 4 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 265415 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 92 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: EglintonThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
22.9 m frontage40.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Cultural Heritage Evaluation Report required

    Needs a closer look

    This property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.

    What it means. Plans to tear down or rebuild will need a heritage evaluation first.

    How to confirm. Heritage Planning at the City confirms the status. Details

    Official Plan Amendment 720
  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 265415 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 92 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 21 units, built 1954).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 265415 PRS 00 IRRescheduled

    Property Standards

    Nov 4, 2026 · 107 ROSELAWN AVE
  • By-law investigation26 197829 WST 00 IRClosed

    Waste

    Jul 7, 2026 · 107 ROSELAWN AVE
  • Building permit20 205671Cancelled

    Proposal to convert existing storage room in the basement to an additional residential suite.

    Oct 13, 2020 · 107 ROSELAWN AVE
  • Zoning review12 166887 ZPRClosed
    May 4, 2012 · 107 ROSELAWN AVE
  • Building permit09 154541Closed

    Install backflow prevention device

    Aug 13, 2009 · 107 ROSELAWN AVE

Check before you build

  • Site-specific exception 900.2.10(767)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(767)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 118 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 119 of former City of Toronto By-law 438-86

1 part for other addresses
  • C On 500 Duplex Ave., former City of Toronto by-laws 184-69 and 143-72.
By-law 569-2013, Chapter 900

Lot facts

Area
928 m²
Frontage
22.9 m
Depth
40.6 m
Street
Roselawn Ave
Corner lot
No
Public lane
None
House footprint
396 m²roof up to 16.4 m
Back yard
9.6 mhouse to rear lot line
Side yards
3 m and 4.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
10 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Eglinton. The lot is inside the Eglinton Major Transit Station Area approved by the Province (Site and Area Specific Policy 723). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d0.6) (x767) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: cork tree, amur (30 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
95%37 of 39 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
3
Development applications
15

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 39 variance decisions: more than at 74% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers. B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

    74 ROSELAWN AVE · Oct 29, 2026 · 96 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

    74 ROSELAWN AVE · Oct 29, 2026 · 96 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a third storey front addition and one-storey front addition to the existing ground floor together with a new front porch. Please note this application was previously deferred at the July 9, 2026 Committee of Adjustment Public Hearing.

    220 BRIAR HILL AVE · Oct 15, 2026 · 431 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a second storey rear addition, a new rear deck with basement walkout and a covered front porch with a basement walkout.

    282 ROSELAWN AVE · Aug 20, 2026 · 442 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a two-storey rear addition, in conjunction with changes to the front yard landscaping and driveway.

    150 ROSELAWN AVE · Jul 9, 2026 · 112 m away

Latest activity nearby

  • Minor variancePending

    Accepted

    150 ST CLEMENTS AVE · Nov 24, 2026 · 264 m away
  • Building permit

    Proposed interior basement underpinning to existing foundation c/w new drains, sump pit and back water valve. Proposed modifications to front entry steps. No work to existing ground or second floor levels of the existing dwelling. (Applicant is reapplying without the addition See 26 264275 SR)

    150 ST CLEMENTS AVE · Nov 23, 2026 · 264 m away
  • Building permit

    Proposed interior alterations to an existing restaurant, including modifications to the ground floor washroom and kitchen layout.

    2472 YONGE ST · Nov 9, 2026 · 267 m away
  • Building permit

    Proposal for the addition of three (3) magnetic locks

    2400 YONGE ST · Nov 5, 2026 · 234 m away
  • Building permit

    Proposed addition and renovations to existing single family dwelling to include, existing basement underpinning (36 lf), interior basement alterations (55m2), proposed rear basement extension (36m2), ground floor powder room addition (4m2), rear basement walkout and front entry porch modifications. Proposed new basement bathroom, laundry and mechanical room. New basement waterproofing, drains, sump pit and back water valve.

    150 ST CLEMENTS AVE · Nov 3, 2026 · 264 m away
  • Consent (lot split)Approved

    To obtain consent to sever the existing property into two residential lots. File numbers B0015/26NY, A0262/26NY. and A0263/26NY will be jointly considered.

    74 ROSELAWN AVE · Oct 29, 2026 · 96 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers. B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

    74 ROSELAWN AVE · Oct 29, 2026 · 96 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

    74 ROSELAWN AVE · Oct 29, 2026 · 96 m away
  • Building permit

    Proposal for interior alterations to lower level of Vibrant Community Health Space for a clinic.

    2398 YONGE ST · Oct 29, 2026 · 255 m away
  • Building permit

    Proposal for removal of existing load bearing wall, removal and relocation of existing stair header and trimmer, along with new post and footing in basement associated with stair

    134 HELENDALE AVE · Oct 22, 2026 · 180 m away

Neighbourhood: Yonge-Eglinton

About the area around the lot, not the lot itself.

Nearest station
Eglinton Station9 min walk
Nearest TTC stop
Yonge St at Montgomery Ave4 min walk
Nearest cycling route
Duplex AveSigned Route (No Pavement Markings), 2 min walk
Nearest traffic count
4,410 vehicles in 8 hRoselawn Ave / Duplex Ave, 130 m away, Feb 24, 2021
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Eglinton Park3 min walk
20 Castlefield Ave Park3 min walk
Montgomery Square Park4 min walk

Schools within 1 km

  • ST CLEMENTS EARLY LEARNING Private 5 min walk
  • ST CLEMENTS SCHOOL Private 5 min walk
  • ST MONICA CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • BIRMINGHAM INTERNATIONAL COLLEGIATE OF CANADA Private 7 min walk
  • JOHN FISHER JR PUBLIC SCHOOL English Public 7 min walk
  • NORTH TORONTO COLLEGIATE INSTITUTE English Public 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-EglintonMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home37%54%
Population (2021)12,41016,813
Homes built in 1960 or before47%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-EglintonCity median
Assault713.8636.3
Robbery95.269.5
Auto theft115.6192.6
Theft over $5,00010246.1
Break and enter136172.8
Theft from vehicles54.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.