HousePrecheckCheck an address

106 Lower Sherbourne StToronto · zoning, lot size and permit records

Residential · R (d1.0) (x3)81.8 × 133.7 m10,822 m²on Wilton Stcorner, also on Lower Sherbourne St

Not a home

David Crombie Park - Prop F

The City of Toronto's real estate inventory lists David Crombie Park - Prop F here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 22 223284 (2" piping from watermain to cool tunnel boring machine, 2022, status Permit Issued); 11 130282 (Proposal to install 1 backflow prevention device and 2 hotwater tanks in existing Hydro..., 2011, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 11 development applications open within 300 m, up to 68 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: CorktownThe City plans more homes around the station: good for transit, and more building over time.
N50 m
81.8 m frontage133.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2011

    Needs a closer look

    Still open in the City's records: 22 223284 (2" piping from watermain to cool tunnel boring machine, 2022, status Permit Issued); 11 130282 (Proposal to install 1 backflow prevention device and 2 hotwater tanks in existing Hydro..., 2011, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 68 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation26 130915 GRA 00 IVClosed

    Notice Issued Graffiti

    Oct 8, 2025 · 106 LOWER SHERBOURNE ST
  • By-law investigation25 237502 GRA 00 IRClosed

    Graffiti

    Oct 8, 2025 · 106 LOWER SHERBOURNE ST
  • Building permit24 117527Closed

    REV01: Proposed revision for the installation of the 100mm groundwater discharge, 100mm manhole drain pipe, and the associated 3000mm diameter manhole within Hydro One¿s transformer station, as per drawingsThe proposed work is within the Hydro One Esplanade Transformer Station. Hydro One is installing autility tunnel to replace their aging high voltage transmission cable and an access shaft will be housed within their station. The accumulated groundwater throughout the tunnel will collect within the tunnel shaft. It is proposed that a new 100mm discharge pipe and 3000mm manhole is to be installed to allow for discharge of the groundwater into the existing 300mm sanitary sewer on Sherbourne Street.

    Aug 7, 2024 · 106 LOWER SHERBOURNE ST
  • Building permit22 223284Permit Issued

    2" piping from watermain to cool tunnel boring machine

    Dec 2, 2022 · 106 LOWER SHERBOURNE ST
  • Building permit19 142253Closed

    Proposal for fire alarm up grades to an existing Hydro transformer station.

    May 3, 2019 · 106 LOWER SHERBOURNE ST
  • Building permit11 130282Permit Issued

    Proposal to install 1 backflow prevention device and 2 hotwater tanks in existing Hydro Substation.

    Mar 15, 2011 · 106 LOWER SHERBOURNE ST
  • Building permit88 021692Closed

    CONSTRUCT MASONRY PERIMETER WALL APPROXIMATELY 3.2M IN HEIGHT AS PER D.A.

    Jan 27, 1989 · 106 LOWER SHERBOURNE ST
  • Building permit86 018559Closed

    BUILD HYDRO TRANSFORMER BUILDING

    Sep 17, 1986 · 106 LOWER SHERBOURNE ST

Check before you build

  • Site-specific exception 900.2.10(3)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(3)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    The lands must comply with exception 900.2.10(4). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 363 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
10,822 m²
Frontage
81.8 m
Depth
133.7 m
Street
Wilton St
Corner lot
Yes, also on Lower Sherbourne St133.7 m along it
Public lane
None
House footprint
1,204 m²roof up to 17.9 m
Back yard
35.7 mhouse to rear lot line
Side yards
2.1 m and 47.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
23 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Corktown. The lot is inside the Corktown Major Transit Station Area approved by the Province (Site and Area Specific Policy 764). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x3) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
20

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey townhouse by constructing a rear two-storey addition with a spiral staircase.

    14 AITKEN PL · Apr 3, 2019 · 247 m away
  • Minor varianceApproved

    To modify the redevelopment plan for a 17-storey office building, approved under Site-specific By-law 818-2013 (as amended by Site-specific By-law 401-2014), by constructing a mezzanine within a ground floor eating establishment.

    351 KING ST E · Jun 27, 2018 · 464 m away
  • Minor varianceApproved

    To alter the redevelopment plan for a 17-storey mixed use building approved under Site Specific By-law 765-2012 (OMB) by altering parking requirements.

    251 KING ST E · Oct 21, 2015 · 360 m away
  • Minor varianceApproved

    To modify the redevelopment plan for the 17-storey office building, approved under Site Specific By-law 818-2013, by amending the minimum required parking facility access width, as well as the building heights specified on Map 2 of the By-law.

    351 KING ST E · Dec 10, 2014 · 464 m away
  • Minor varianceApproved

    To permit the installation of updated mechanical equipment on the roof of the existing building

    200 KING ST E · Jul 3, 2013 · 410 m away

Latest activity nearby

  • Building permit

    Demolition and decommissioning of an existing pedestrian tunnel access structure, including removal of the existing stair and elevator access components and construction of a new reinforced concrete roof slab and associated site restoration

    235 THE ESPLANADE · Nov 24, 2026 · 244 m away
  • Zoning review

    Cancelled

    180 FRONT ST E · Nov 5, 2026 · 297 m away
  • Zoning review

    Closed

    178 FRONT ST E · Nov 5, 2026 · 294 m away
  • Zoning review

    Closed

    145 FRONT ST E · Oct 30, 2026 · 260 m away
  • Building permit

    Demolition of existing finishes, drywall, and some framing, and existing millwork, existing plumbing fixtures (drains to remain,) and equipment (excluding existing mechanical units.) Construct new partitions, with room size changes at 2nd level. Plumbing connection will be a re/re connection. No structural changes to the building. Add of new finishes, equipment, and fixtures.

    222 THE ESPLANADE · Oct 30, 2026 · 239 m away
  • Zoning review

    Closed

    17 PRINCESS ST · Oct 15, 2026 · 161 m away
  • Zoning review

    Closed

    16 LOWER JARVIS ST · Sep 4, 2026 · 281 m away
  • Building permit

    Proposed fan coil replacement

    25 HENRY LANE TER · Aug 28, 2026 · 233 m away
  • Building permit

    INTERIOR ALTERATIONS TO FIT UP A NEW HAIR BEAUTY SALON IN VACANT UNIT G2 ON THE GROUND FLOOR OF THE BUILDING

    145 FRONT ST E · Aug 12, 2026 · 260 m away
  • Building permit

    Proposal to install eight (8) electromagnetic locks.

    215 LAKE SHORE BLVD E · Aug 7, 2026 · 261 m away

Neighbourhood: St Lawrence-East Bayfront-The Islands

About the area around the lot, not the lot itself.

Nearest station
King Station13 min walk
Nearest TTC stop
The Esplanade at Lower Sherbourne St2 min walk
Nearest cycling route
Lower Sherbourne StCycle Track, 1 min walk
Nearest traffic count
1,498 vehicles in 8 hThe Esplanade / Frederick St / David Crombie Park Trl, 120 m away, Jun 15, 2022
Serious collisions within 500 m
112021–2026, killed or seriously injured: 3 fatal, 6 with pedestrians, 4 with cyclists
Parks
David Crombie Park1 min walk
Princess Street Park2 min walk
Sherbourne Common4 min walk

Schools within 1 km

  • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 3 min walk
  • DOWNTOWN ALTERNATIVE SCHOOL English Public 4 min walk
  • MARKET LANE JR & SR PUBLIC SCHOOL English Public 5 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 7 min walk
  • GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 8 min walk
  • VOICE INTEGRATIVE PRIVATE SCHOOL Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home40%54%
Population (2021)31,28516,813
Homes built in 1960 or before3%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
Assault1059.7636.3
Robbery96.369.5
Shootings4.510.5
Auto theft24.6192.6
Theft over $5,00078.446.1
Break and enter163.5172.8
Theft from vehicles163.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.